ML21167A104
| ML21167A104 | |
| Person / Time | |
|---|---|
| Issue date: | 06/16/2021 |
| From: | Edgardo Torres NRC/NRR/DRA |
| To: | |
| Vasavada S | |
| Shared Package | |
| ML21167A163 | List: |
| References | |
| Download: ML21167A104 (4) | |
Text
PRA Acceptability - Future Oversight of Risk-Informed Initiatives Edgardo Torres Reliability & Risk Analyst PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation 1
PRA Acceptability RG 1.200 Rev 3 PRA Acceptability
@ LAR RG 1.200 RG 1.200 Position C.1 Position C.2 Plant Technical Level of Representation ASME Peer Scope Elements Detail & PRA Standard Review Configuration control
PRA Configuration and Control PRA found acceptable Issuance of SE Plant Modifications Operating Experience Assessing the gap and Data PRA maintenance and upgrades 3
Future Challenges
- Configuration Control Oversight
- Familiarization with Licensees programs
- Familiarization with Licensees technical elements analysis
- Industry Collaboration:
- Information Gathering & Guidance Exercise at facilities
- Feedback 4