ML20065Q308
From kanterella
ML20065Q308 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 11/30/1990 |
From: | Ransom C EG&G IDAHO, INC. |
To: | NRC |
Shared Package | |
ML20065Q312 | List: |
References | |
CON-FIN-A-6812 EGG-NTA-8366, TAC-61189, NUDOCS 9012170114 | |
Download: ML20065Q308 (82) | |
Similar Documents at Peach Bottom | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20247N5421998-05-11011 May 1998
[Table view]Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11 Category:QUICK LOOK MONTHYEARML20247N5421998-05-11011 May 1998
[Table view]Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11 Category:ETC. (PERIODIC MONTHYEARML20247N5421998-05-11011 May 1998
[Table view]Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20247N5421998-05-11011 May 1998
[Table view]Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20065Q308&oldid=2724187"