Final Deficiency Rept:Category I Pipe Weld Failed to Meet Weld Profile Requirements During IE Insp 50-322/78-06. Records of Required Rework & Insp Found Satisfactory During IE Insp 50-322/79-21
ML19305B863
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 03/12/1980
From: Novarro J
LONG ISLAND LIGHTING CO.
To:
References
SNRC-467, NUDOCS 8003200497
Download: ML19305B863 (2)


Text

s ~ . (,To & ST$

s. .~.-, _~.__ .

~ LONG ISLAND LIGHTING COM PANY

_,..__'7jaarmasfMO SHOREHAM NUCLEAR POWER STATION sw ._ . .. . .

P.O. BOX 618. NORTH COUNTRY RO AO

  • WADING RIVER, N.Y.11792 i

March 12, 1980 SNRC- 467 1

Mr. Boyce Grier, Director

,

Office of Inspection and Enforcemer.t, Region I l U.S. Nuclear Regulatory Commissior 631 Park Avenue King of Prussia, PA 19401 Long Island Lighting Company Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322

Dear Mr. Grier:

On May 22, 1978, in accordance with 10CFR50. 55 (e) , we reported to Region I a deficiency in a Class 1 pipe weld. This letter serves

-

as our final written report on this deficiency.

Description of Deficiency During an NRC field inspection (Inspection No. 50-322/78-06) a deficiency was noted in a Category I pipe weld. The completed weld had been post weld inspected and accepted however did not meet the weld profile requirements for ISI examination which violates specification SH1-056.

The Mechanical Contractor's Quality Assurance Division reviewed

' the matter and noted the following additional nonconforming conditions:

1. The OD surface of the base metal was ground below the pipe surface in violation of specification SH1-056.
2. An ultrasonic examination was performed to assure that required minimum wall (1.044 inches) had not been violated. /f The actual wall thickness (.950 inches) N<

'

as measured by UT was in violation of l

minimum wall thickness criteria.

The fact that minimum wall was violated after final post weld

,

inspection had been completed constituted a significant breakdown

.

""'

- - - . . - . . - ..

.

. , _ _ , 0 0 03 2 0 0 Yl['l

p _. , ...

-

.

-

-

h

-

.

,

March 12, 1980 Docket No. 50-322

.Page 2

.

in the QA program.

Corrective Action The corrective action taken at the site as well as the corrective action taken to prevent reoccurrence remains as stated in our 30-day written report (our letter to you SNRC-300 dated June 22, 1978).

%

Date of Full Compliance

,

All required inspections and rework have been completed. The programs which have been implemented to prevent reoccurrence of this deficiency have been successful. During a recent NRC field inspection (Inspection No. 50-322/79-21), the inspector examined the records relevant to this issue and found them satisfactory.

Very truly yours, Orac h. . .d,... , c7

'.

-

, J. 2. .. :" : .20

()J. P. Novarro -

,

CKS:jb ~

f*

. cc: lir. Victor Stello, Director ,

NRC Office of Inspection and Enforcement  !

, Division of Reactor Ooerations Inspection l

'

Washington, D.C. 20555  !

cc: Mr. J. Higgins Site HRC Trailer bec: Dist List 14 (L.E. PJS)

V. A. Brandi

'

B. Gutmann

.. _ _._. _ .

'

A. Pann R. Teksdale

.

Eng. File /SR2...A21.200 D

!

'!

.

i

,