MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] |
Text
January 3, 2008
Ms. Dorothy Shoup 473 W. 189 th Street Scranton, KS 66537-9363
Dear Ms. Shoup:
I am writing in response to questions you provided to the U.S. Nuclear Regulatory Commission (NRC) staff during the November 8, 2007, NRC public meeting to receive public comments on the Draft Supplemental Environmental Impact Statement (SEIS) for Wolf Creek Generating Station (Wolf Creek) license renewal. Per your hand-written note and the Official Transcript of that meeting (afternoon session), your questions are presented below along with our responses:
- 1. Care and disposal of the hazardous waste, including current status of waste storage here in Coffey County, Kansas. France was and is a big user of nuclear power, and I was told at that hazardous waste (spent uranium fuel, etc.) was shipped from France to Japan.
What now, here?
Response: Although the storage and disposal of high-level waste are not within the scope of environmental issues pertaining to license renewal, questions about these topics are asked frequently during public meetings and other opportunities for public comment. I am enclosing a copy of NUREG-1850, "Frequently Asked Questions On License Renewal Of Nuclear Power Reactors," for your information. In it, you will find that Section 4.5, "Storage and Disposal of Spent Nuclear Fuel," provides relevant information about the Nuclear Waste Policy Act, the status of Yucca Mountain as a repository for spent nuclear fuel from commercial reactors, and the storage of spent fuel at commercial nuclear power facilities.
- 2. Decommissioning plan. After 20+ years, is that (a) feasibly sufficient and (b) enforceable? Please briefly outline it for us.
Response: As one of the conditions for an operating license, the NRC requires the licensee to commit to decommissioning the nuclear plant after it ceases power operations. This requirement is based on the need to reduce the amount of radioactive material at the site to ensure public health and safety, as well as the protection of the environment. I am enclosing a copy of NUREG-1628, "Staff Responses to Frequently Asked Questions Concerning Decommissioning of Nuclear Power Plants," which provides additional information regarding the decommissioning process.
D. Shoup
- 3. Expansion/additions. An Osage County acquaintance told me that this is being requested. Specifically, briefly what is being requested? Has it been granted?
Response: As Mr. Christian Jacobs responded to you at the November 8, 2007, meeting, NRC staff for license renewal are not aware of any expansion of or additions to the Wolf Creek Plant.
- 4. We in Osage County usually have winds from the southwest. Therefore, we are in the normal path of a toxic plume from the Wolf Creek Nuclear Plant. Yet, when I asked our County FEMA representative about his aspect of the nuclear plant operations, I was told, (a) she does not recall information received/on hand; (b) permission to attend emergency preparedness exercise has been requested, but refused (one just concluded, I understand). Comments, please, on this.
Response: Under normal operating conditions, all gaseous emissions from Wolf Creek Plant are within the environmental standards established by the Environmental Protection Agency. In the event of an accident involving toxic plume offsite, evacuation and emergency planning in response to the accident are the primary responsibility of the State and Local governments. NRC staff are unable to comment on statements made by Federal Emergency Management Agency (FEMA) representatives. Questions about the off-site emergency plans should be directed to FEMA, State, and local government officials. If you have additional questions about the NRC staff's review of the Wolf Creek License Renewal application, please contact me at 301-415-3617.
Sincerely, /RA/
Tam Tran, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation
Enclosures:
As stated
(pkg) ML073381014; (ltr) ML073380970; (NUREG-1850) ML061110022; (NUREG-1628) ML003726190 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR
NAME IKing TTran RFranovich
DATE 12/13/07 12/31/07 1/3/08