ML17326A398

From kanterella
Revision as of 15:39, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
LER 79-060/03L-0:on 791116,intermediate Deck Door to Ice Condenser Found Frozen Shut.Caused by Plugged Air Handling Unit Drain Line & Frozen Drainage Overflow.Ice Removed & Drain Line Cleared.Mod Initiated
ML17326A398
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/07/1979
From: Michael Brown
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17326A396 List:
References
LER-79-060-03L, LER-79-60-3L, NUDOCS 7912130380
Download: ML17326A398 (1)


Text

NRC FORM 366 (7.77)IEA C CENSEE EVENT REPORT U.S.NUCLEAR REGULATORY COMMISSION 0~O 7 8 CON'T~O 7 8 CONTROL BLOCK: Ce I M I D C C J Q2 0 9 LICENSEE CODE 14 15 Ql (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 0-0 0 0 0 0-0 o Q2c, 1 1 1 Q4~QA 25 26 I.ICENSE TYPE 30 57 CAT 58 LICENSE NUMBER REPORT DATE 80 QB"oU~qz<LE 0 5 0 0 0 3 1 6 Qi1 1 1 6 7 9 PA 60 6'I DOCKET NUMBER 68 69 EVENT DATE 74 75 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 DURING A ROUTINE ICE CONDENSER TOUR ON TWO ON~O3~O4~Os INTERMEDIATE DECK DOOR WAS FOUND FROZEN SHUT.THIS CONSTITUTED AN INOPERABLE ICE CONDENSER DOOR AS DELINEATED IN TECH.SPEC.3.6.5.3.REQUIRED ACTION ITEMS WERE OBSERVED.ALL OTHER ICE CONDENSER DOORS REMAINED OPERABLE.SIMILAR EVENTS: 79-045/03L-0 AND 79-036/03L-O.

~os 80 7 8 7 8 9 SYSTEM CAUSE CAUSE COMP.VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE~xx Q~q E Q>g~xp>>x x x x x x Qw~zgl5~z Q16 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERIRO EVENT YEAR REPORT NO.CODE TYPE NO.P'~"EPO" 7~~~~06 0~~LQJ~~T.21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDC PRIME COMP.COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.SUPPLIER MANUFACTURER Q18~PQ19~ZQ20~ZQ>'0 0 0~NQZS~NQ24~NQ25 W 1 2 0 Q26 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o AN AIR HANDLING UNIT DRAIN LINE WAS FOUND PLUGGED.THIS RESULTED IN THE OVERFLOW OF DRAINAGE FROM THE UNIT DURING DEFROST AND ICE FORMATIO THE DOORS~THE ICE WAS REMOVED AND THE DRAIN LINE WAS CLEARED.3 A MODIFICATION HAS BEEN INITIATED TO CORRECT PROBLEMS ASSOCIATED WITH 4 AIR HANDLING UNIT DEFROSTING.

CZ3 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY Q~Z Q33~ZQ34 NA.'.7 8 9 10 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39~00 0 Q>>~ZQM NA LOCATION OF RELEASE Q NA 45 7 8 9 FACILITY~3O METHOD OF STATUS'EMPOWER OTHERSTATUS

~DISCOVERY DISCOVERY DESCRIPTION Q32 1 6~EQ26~10 0 Q26 NA~BQl ROUTINE TOUR 8 9 10 12 13 44 45 46 80 80 80 7 8 S 7 8 7 8 O 7 8 9 11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41

~oo o Q 9 11 12 LOSS OF OR DAMAGE TO FACII.ITY Q43 TYPE DESCRIPTION Z Q42 NA 9 10 PUBLICITY ISSUED DESCRIPTION

~L~JQ44 NA 9 10 NAME OF PRFPARER M.S.BROWN 80 gg g g/zd3g8 80 80 NRC USE ONLY BOER g 0 0 68 69 PHONEI 616-6-Ol