ML17352A848
| ML17352A848 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/26/1994 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17352A847 | List: |
| References | |
| NUDOCS 9411010358 | |
| Download: ML17352A848 (11) | |
Text
L-94-268 CORE OPERATING LIMITS REPORT FOR FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 94i 1010358 94i 026 PDR ADOCK 05000250 PDR
L-94-268 Attachment Page 1 of 8 CORE OPERATING LIMITS REPORT The Core Operating Limits Report (COLR)for Turkey Point Unit 3 Cycle 14 has been prepared in accordance with the requirements of Technical Specifications 6,9.1.7.The Technical Specifications affected by this report are: 3.2.1 3.1.3.6 3/4.2.2 Axial Flux Difference (AFD)Control Rod Insertion Limits Heat Flux Hot Channel Factor-F()(Z)The AFD, K(Z)and Rod Bank Insertion Limits have been developed using the NRC approved methodology specified in Technical Specification 6.9.1.7.These Limits are provided in the attached figures.
L-94-268 Attachment Page 2 of 8 AXIAL FLUX DIFFERENCE AS A FUNCTION OF RATED THERMAL POWER (TURKEY POINT UNIT 3 CYCLE 14)(O,<00)(+7,$00)uNACCEPTABLE OPERATfON UNACCEPTABLE OPERATION (40/0)(+25,50)ACCEPTABLE OPERATlON~50 40-30.20-10 0 10 20 30 40 50 Axial Flux Difference
('/)
L-94-268 Attachment Page 3 of 8 ROD BANK ZNSERTZON LZMZTS VS.THERMAL PCWER (TURKEY POZNT UNZT 3 CYCLE 14)215 (sos)192 (>m,~7>)14'4 0a 0 10 20 R 40 50 N 70 N I0 100 a RATED THERMAL POSER L-94-268 Attachment Page 4 of 8 K(Z)NORMALZZED Fg(Z)AS A FUNCTZON OF CORE HEZGHT (TURKEY POZNT UNIT 3 CYCLE 14)I.O 0 7 0,5 0.1 0.0 0 2 L-94-268 Attachment Page 5 of 8 CORE OPERATING LIMITS REPORT The Core Operating Limits Report (COLR)for Turkey Point Unit 4 Cycle 15 has been prepared in accordance with the requirements of Technical Specifications 6.9.1.7.The Technical Specifications affected by this report are: 3.2.1 3.1.3.6 3/4.2.2 Axial Flux Difference (AFD)Control Rod Insertion Limits Heat Flux Hot Channel Factor-F()(Z)The AFD, K(Z)and Rod Bank Insertion Limits have been developed using the NRC approved methodology specified in Technical Specification 6.9.1.7.These Limits are provided in the attached figures.
~~~~~~~'4~I~~I I I~I'~I I I~I'~~~~
L-94-268 Attachment Page 7 of 8 ROD BANK ZNSERTZON LZMZTS VS.THERMAL POWER (TURKEY POZNT UNZT 4 CYCLE 15)215 (>ms)1S2 (>00,>s~)14'4 (ee)o i~s a e s a m a so im a RATED TKRiNL POWER I gl
~~L-94-268 Attachment Page 8 of 8 K (Z)NORMALZZED Fg (Z)AS A FUNCTZON OF CORE HEZGHT (TURKEY POZNT UNZT 4 CYCLE 15)1.0 0.1 0.0 0