PBAPS PRA System Importance List
ML18283B278
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/15/2018
From: Bennett Brady
NRC/NRR/DMLR/MRPB
To:
Brady B, NRR-DMLR 415-2981
References
Download: ML18283B278 (1)


Text

The following table was developed using the current Model of Record (MOR), which is documented in the Peach Bottom Atomic Power Station (PBAPS) PRA Summary Notebook (PB-PRA-013, Revision 4). The table was developed using the EPRI R&R Workstation SysImp Computer code. It shows the top systems/groups of equipment to the overall CDF by Fussell-Vesely. SYSIMP Key System/Equipment Contribution to CDF System/Equipment Tag F-V High Pressure Coolant Injection HPCI 15.8% Condenser Vacuum TCV 11.8% Reactor Core Isolation Cooling RCIC 10.9% DC Power DC 10.1% AC Power AC 10.1% Emergency Diesel Generators EDG 7.9% Feedwater FW 7.1% Reactor Protection System RPS 5.7% High Pressure Service Water HPSW 4.8% Main Steam Isolation Valves MSIV 3.8% Emergency Cooling Tower/ Emergency Cooling Water ECT/ECW 2.2%