JAFP-13-0097, James A. FitzPatrick - Correction to the Fourth Inservice Inspection Interval End Date

From kanterella
Revision as of 04:49, 9 November 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
James A. FitzPatrick - Correction to the Fourth Inservice Inspection Interval End Date
ML13203A079
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/19/2013
From: Adner C M
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-13-0097
Download: ML13203A079 (2)


Text

Entergy Nuclear Northeast E nt~gj~i Entergy Nuclear Operations, Inc.James A.FitzPatrick NPP P.O.Box 110 Lycoming, NY 13093 Chris M.Adner Licensing Manager-JAF JAFP-1 3-0097 July 19, 2013 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

Subject:

Correction to the Fourth Inservice Inspection Interval End Date James A.FitzPatrick Nuclear Power Plant Docket No.50-333 License No.DPR-59

Reference:

1.Entergy letter JAFP-07-0030, Fourth Inservice Inspection Interval Inspection Program Plan, dated February 27, 2007 (ADAMS Accession No.ML07071 0038).2.NRC letter to Entergy, Relief Request No.3, Risk Informed Inservice Inspection Program, Safety Evaluation, dated February 22, 2008 (ADAMS Accession No.ML080420427).

Dear Sir or Madam:

On February 27, 2007, Entergy Nuclear Operations, Inc.(Entergy)submitted the Fourth Inservice Inspection Interval (ISI)Inspection Program Plan (Reference 1)for the James A.FitzPatrick Nuclear Power Plant (JAF).Reference 1 incorrectly stated that the end of the Fourth ISI Interval is December 31, 2017, vice December 31, 2016.This error was promulgated into the NRC Safety Evaluation dated February 22, 2008, regarding Relief Request No.3 (Reference 2).The error was discovered by Entergy engineering staff on May 16, 2013, and communicated with the NRC via teleconference on the same day.As discussed on the call, a letter describing the typographical error is being submitted to the NRC.This error has no adverse effect on the implementation of the ISI program and has been entered into JAF's corrective action program.Should you have any questions regarding this submittal, please contact Mr.Chris Adner, Licensing Manager, at 315-349-6766.

This letter contains does not contain any new regulatory commitments.

Sincerely, Chris M.Adner CA/jo cc: Regional Administrator U.S.Nuclear Regulatory Commission, Region I 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 NRC Senior Resident Inspector James A.FitzPatrick NPP P.O.Box 136 Lycoming, NY 13093 U.S.Nuclear Regulatory Commission Senior Project Manager Plant Licensing Branch I-i Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation JAFP-1 3-0097 Page 2 of 2