ML14079A068

From kanterella
Revision as of 09:44, 28 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
April 10, 2014, Quarterly Meeting with TSTF - Agenda
ML14079A068
Person / Time
Site: Technical Specifications Task Force
Issue date: 03/27/2014
From: Honcharik M C
Licensing Processes Branch (DPR)
To:
Honcharik M C
Shared Package
ML14079A049 List:
References
Download: ML14079A068 (2)


Text

Agenda for Technical Specifications (TS) Task Force (TSTF) and U.S. Nuclear Regulatory Commission (NRC) Meeting Thursday, April 10, 2014 9:00 a.m. - 4:00 p.m.

ENCLOSURE I. Administrative (9:00 a.m. - 9:15 a.m.) (NRC) A. Introductions B. Agenda Review C. Other Administrative Issues II. Process Issues (9:15 a.m. - 9:30 a.m.) A. Status of Regulatory Information Summary 2005-20 Revision to Reference Inspection Manual Chapter IMC-0326 (NRC) B. Other Process Issues (NRC/TSTF) III. Issues with Previously Approved Travelers (9:30 a.m. - 10:30 a.m.) A. Discussion of NRC Concerns with TSTF-471, TSTF-286, and TSTF-51 (TSTF)

B. Status of the TSTF-501 Model Safety Evaluation Revision (NRC) C. Status of Industry Response to the Draft Notice of Availability Supplement for TSTF-493, "Clarify Application of Setpoint Methodology for LSSS [Limiting Safety System Settings] Functions" (TSTF) BREAK IV. Active Traveler Review Status (10:45 a.m. - 12:00 p.m.) A. Discuss Status of All Travelers Currently Under NRC Staff Review (All) 1. TSTF-454, Revision 2, "Extend PCIV [Primary Containment Isolation Valve]

Completion Times (NEDC-33046)" 2. TSTF-529, Revision 1, "Clarify Use and Application Rules"

3. TSTF-531, Revision 0, "Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2" 4. TSTF-537, Revision 0, "Increase CIV [Containment Isolation Valve] Completion Time; Update of TSTF-373" 5. TSTF-540, Revision 0, "Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6)" 6. TSTF-541, Revision 0, "Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed" 7. TSTF-542, Revision 0, "Reactor Pressure Vessel Water Inventory Control"
8. TSTF-545, Revision 0, "TS Inservice Testing (IST) Program Removal"
9. TSTF-547, Revision 0, "Clarification of Rod Position Requirements" B. TSTF Traveler Review Priority (TSTF)

LUNCH V. Technical Issues (1:00 p.m. - 3:30 p.m.) A. TSTF Response to NRC Position on Pressure Boundary Leakage (TSTF) B. Minimum Containment Temperature (NRC) C. Stroke Time Tests for CIVs (NRC)

D. Plan to Resolve Secondary Containment Access/Reportability Issues in Boiling Water Reactors (BWRs) (NRC) E. Planned Revisions to the BWR 6 Standard TS, Limiting Condition for Operation 3.8.1 Bases, to address Incorrect Bases for the 3.8.1 Applicability Note (NRC) F. Challenges Associated with License Amend ment to Allow Sharing of Systems between Units (NRC) G. Revision to IMC 0326, Appendix C.13 Structural Requirements and Conforming Changes to Appendix C.10 Piping and Pipe Support Requirements, Appendix C.11 Flaw Evaluation and Appendix C.12 Operational Leakage from Code Class 1, 2, 3 Components as Needed (NRC) VI. Future Planning (3:30 p.m. - 3:45 p.m.) A. Future Traveler submittals (TSTF) B. Next Meeting (All) VII. Designated Time for Public Comments (3:45 p.m. - 3:55 p.m.) (All)

VIII. Closing Remarks (3:55 p.m. - 4:00 p.m.) (All) IX. Adjourn (4:00 p.m.)