Letter Sequence Request |
|---|
|
Results
Other: AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval, AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid, ML20003E750, ML20137P712, ML20199L109, ML20203D679, ML20203J963, ML20207G520, ML20212P470, ML20215L243
|
MONTHYEARML20003E7501981-04-0707 April 1981 Responds to NRC Providing Addl Guidance Re NUREG-0737,Item I.G.1.Addl Safety Analyses & Waivers of Certain Tech Specs Would Be Required Re Training During Low Power Testing.Encl Program Completes Response Project stage: Other AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval1981-08-18018 August 1981 Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval Project stage: Other ML20137P6931986-01-29029 January 1986 Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Changes in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Request ML20137P7121986-01-29029 January 1986 Proposed Tech Spec Changes to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Other AECM-86-0023, Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid1986-01-29029 January 1986 Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid Project stage: Request AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid1986-04-0303 April 1986 Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid Project stage: Other ML20199L1091986-04-0303 April 1986 Station Blackout Evaluation Rept,Grand Gulf Nuclear Station Project stage: Other ML20203D6791986-04-14014 April 1986 Proposed Tech Specs Re Design Changes to Scram Discharge Vol & post-LOCA Vacuum Breakers Project stage: Other ML20199E9111986-06-13013 June 1986 Proposed Changes to Tech Specs 3.5.1 & 4.5.1,revising Automatic Depressurization sys-related Air Sys Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Quality Test Project stage: Request AECM-86-0188, Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid1986-06-13013 June 1986 Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid Project stage: Request AECM-86-0225, Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid1986-07-16016 July 1986 Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid Project stage: Request ML20207G5201986-07-16016 July 1986 Proposed Tech Specs Combining Drywell Vacuum Relief Requirements w/post-LOCA & Combustible Gas Purge Sys Into One Tech Spec Project stage: Other AECM-86-0198, Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid1986-07-25025 July 1986 Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid Project stage: Request ML20203J9631986-07-25025 July 1986 Proposed Tech Spec,Modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training to Satisfy NUREG-0694,TMI Action Plan Item I.G.1 Requirement to Conduct Simulated Loss of Power Test Project stage: Other AECM-86-0243, Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test1986-08-11011 August 1986 Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test Project stage: Request ML20212P4641986-08-26026 August 1986 Revised Application for Amend to License NPF-29,allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Request ML20212P4701986-08-26026 August 1986 Proposed Tech Specs Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Other AECM-86-0238, Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months1986-08-26026 August 1986 Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months Project stage: Request ML20215L2431986-10-17017 October 1986 Amend 21 to License NPF-29,revising Tech Specs Re Names & Designation of Certain Plant Svc Water Valves,Record Retention Specs & Control Rod Scram Discharge Vol Project stage: Other ML20215L2481986-10-17017 October 1986 Safety Evaluation Supporting Amend 21 to License NPF-29 Project stage: Approval ML20056A7491990-08-0707 August 1990 Forwards Safety Evaluation Accepting Licensee Fire Barrier Penetration Seal Program & Commitment to Complete 100% Review of All Tech Spec Fire Penetration Seals by 911231 Project stage: Approval 1986-04-03
[Table View] |
Text
__ ._
. EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- 2) Low pressure setpoint of the:
(a) LPCI A and B subsystem loop to be 1 38 psig.
(b) LPCI C subsystem loop and LPCS system to be 1 22 psig.
(c) HPCS system to be 1 18 psig.
b) Header delta P instrumentation and verifying the setpoint of the HPCS system and LPCS system and LPCI subsystems to be 1.2 0.1 psid change from the normal indicated AP.
- 3. Verifying that the suction for the HPCS system is automatically transferred from the condensate storage tank to the suppression pool on a condensate storage tank low water level signal and on a suppression pool high water level signal.
- d. For the ADS at least once per 18 months by:
- 1. Performing a system functional test which includes simulated I automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve actuation.
- 2. Manually opening each ADS valve when the reactor steam dome pressure is greater than or equal to 100 psig* and observing that either:
a) The control valve or bypass valve position responds accordingly, or b) There is a corresponding change in the measured steam flow.
(InseAT) x The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test.
GRAND GULF-UNIT 1 3/4 5-5 A mendrwedt No. -
8606240146 860613 PDR ADOCK 05000416 P PDR
I l
- INSERT TO 4.5.1.d page 3/4 5-5 l
- 3. Performing an extrapolated pressure decay test on the ADS air system to demonstrate system pressure will be maintained for 7 days at a value 2: 110 psig without makeup air available.
- 4. Verifying within 31 days after obtaining the representative sample that a laboratory analysis of the instrument air supply to ADS shall be determined to contain:
- 1. particle size less than or equal to 50 microns
- 2. total hydrocarbon less than 1 ppm
- 3. moisture content less than or equal to -40 0F dew point at 100 psig.
I t,
l f
Y J10 MISC 660E0803 - 4
9 v
PAL F Roth booster OOM PR ESSOE ~I Q
A703
@lrM l 1
)Ml067A (A-3D l l
I I
L--L- F130^ FIBo8 gg_1_J py pg __
R7o2 Y-~~ N708 / % I N 2)I ~ - ~ ~ I~ ~- ~ ~ R203 (y_ tog) l
, cae
' I
.s O O O
/%'Q ADS A DS ADS Aos VhLVES VALVES VALVE' Valves a-l'- " ' AIR gig gig Aig ACV# Acyn RCVR RevR v v 2 v i
5 R
~
H s 9
- - . - - . _ _ l_._- . . . _ _ - - . _ - - - -.-. - __. __ _- - ___--