Confirms That for Present Evolution of Moving Unit 2 Fuel, Suspension of Work on Unit 1 Side of Fuel Handling Bldg (Fhb) Not Required.Worst Case Accident Would Not Adversely Affect Personnel in Any Area of Fhb
ML20137U174
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 11/19/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 8512090223
Download: ML20137U174 (5)


Text

.

November 19, 1985 Mh Ob Docket No. 50-289 ISTRIEUITON:

'T)ocketQFile IRC~PUR JThoma local PDR Ringram Mr. Henry D. Hukill, Vice President ORB #4 Rdg File ACRS, 10 and Director TMI-1 HThompson ORB #4 Gray GPU Nuclear Corporation OELD File P. O. Box 480 EJordan WTravers Middletown, Pennsylvania 17057 BGrimes RConti JPartlow WRussell

Dear Mr. Hukill:

H0rnstein EBrach WPaulson GEdison

SUBJECT:

EFFECTS OF MOVING TMI UNIT 2 FUEL ON THE UNIT 1 SIDE OF THE FUEL HANDILNG BUILDING By letter from Mr. Denton to Mr. Hukill dated October 2,1985, TMI-1 was permitted to resume operation subject to conditions imposed in the restart proceeding. One of these conditions concerns the movement of Unit 2 fuel in the fuel handling building (FHB) and reads as follows:

During any Unit 2 fuel movements in the fuel handling building, GPU Nuclear Corporation shall suspend work in the Unit 1 area of that building, unless GPU Nuclear Corporation has submitted to the NRC for its review specific written procedures for the planned movements of Unit 2 fuel and an evaluation of the potential impacts of those fuel movements on personnel working in the Unit 1 area of the building and the NRC has agreed that the potential impacts of the planned Unit 2 fuel movements on personnel working in the Unit 1 area of the building do not require that work in the Unit 1 area of the building be suspended.

LBP-82-27, 15 NRC 747, 755 (1982).

By letter dated November 12, 1985 from Dr. Travers, Acting Director of the TMI Program Office, to Mr. Standerfer, Vice President / Director TMI-2, the staff reviewed and approved the planned movement of fuel from the Unit 2 reactor to the fuel handling building via special canisters. This SER implied but did not specifically state that this planned fuel movement does not require that work in the Unit 1 area of the fuel handling building be suspended. The purpose of this letter is to confirm that for the present evolution of moving Unit 2 fuel, suspension of work on the TMI-1 side of the FHB is not required.

8512090223 851119 9 DR ADOCK 050

This conclusion -is based on (1) NRC staff review and approval of specific TMI-2 fuel movement procedures (required per TMI-2 Technical Specification 6.8.2), and (2) NRC staff evaluations of early TMI-2 defueling activities, including potential impacts, proposed by GPUN. Our evaluations indicate that the likelihood of a detrimental impact resulting from TMI-2 fuel movements in the FHB is small. Even if a worse case accident (i.e., canister drop and rupture) were assumed to occur, the impacts would not adversely affect personnel in any area of the FHB, Releases of radioactive material postulated from such an accident would either be contained and shielded by water in the flooded fuel pool or be too small (i.e., Krypton-85 qas) to pose a significant hazard to personnel in the FHB.

It is our intent that future safety evaluations covering the movement of Unit 2 fuel in the FHB explicitly review the effect on the Unit I side of the FHB and thereby address this condition of operation for TMI-1.

Sincerely, N . s.a.

a c^t@ its JO m y, g q .p .

John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing cc: See next page gl 7k T-I, i,ler g sN a# .es w a M% % a#

a~ p M Tor OR #4:DL ORB #4:DL; M tf6lna/dn JStolz 11/gq/85 11/ /85

Mr. Henry D. Hukill Three Mile Island Nuclear Station GPU Nuclear Corporation Unit No. I cc:

Mr. R. J. Toole Mr. Richard Conte O&M Director, TMI-I Senior Resident Inspector (TMI-1)

GPU Nuclear Corporation U.S.N.R.C.

Middletown, Pennsylvania 17057 P.O. Box 311 Middletown, Pennsylvania 17057 Richard J. McGoey Manager, PWR Licensing GPU Nuclear Corporation Regional Administrator, Region I 100 Interpace Parkway U.S. Nuclear Regulatory Commission Parsippany, New Jersey 70754 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. C. W. Smyth TMI-1 Licensing Manager Mr. Robert B. Borsum GPU Nuclear Corporation Babcock & Wilcox P. O. Box 480 Nuclear Power Generation Division Middletown, Pennsylvania 17057 Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 G. F. Trowbridge, Esq.

Shaw, Pittman, Potts & Trowbridge Governor's Office of State Planning 1800 M Street, N.W. and Development Washington, D.C. 20036 ATTN: Coordinator, Pennsylvania State Clearinghouse Ivan W. Smith, Esq., Chairman P. O. Box 1323 Atomic Safety and Licensing Board Harrisburg, Pennsylvania 17120 U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Mr. Earl B. Hoffman Dauphin County Comissioner Sheldon J. Wolfe, Esq., Chairman Dauphin County Courthouse Atomic Safety and Lit.ensing Board Front and Market Streets U.S. Nuclear Regulatory Commission Harrisburg, Pennsylvania 17101 Washington, D.C. 20555 Dauphin County Office of Emergency Mr. Gustave A. Linenberger, Jr. Preparedness Atomic Safety and Licensing Board Court House, Room 7 U.S. Nuclear Regulatory Comission Front and Market Streets Washington, D.C. 20555 Harrisburg, Pennsylvania 17101 Dr. James Lamb, III Mr. David D. Maxwell, Chairman Administrative Judge Board of Supervisors 313 Woodhaven Road Londonderry Township Chapel Hill, North Carolina 17514 FRD#1 - Geyers Church Road Middletown, Pennsyivania 17057 Mr. David Hetrick ,

Administrative Judge Mr. Thomas M. Gerusky, Director l Frofessor of Nuclear Energy Bureau of Radiation Protection University of Arizona Pennsylvania Department of Tucson, Arizona 85721 Environmental Resources P. O. Box 2063 Harrisburg, Pennsylvania 17120

GPU Nuclear Corporation Three Mile Island, Unit 1 cc:

Thomas Y. Au, Esq. Sen. Allen R. Carter, Chairman Office of Cl.'ef Counsel Joint Legislative Committee on Energy Department of Environmental Resources P. O. Box 142 505 Executive House Suite 513 P. O. Box 2357 Senate Gressette Building Harrisburg, Pennsylvania 17120 Columbia, South Carolina 29202 Mr. Bob Stein, Director of Research Ms. Frieda Berryhill, Chairman Committee on Energy Coalition for Nuclear Power Plant P. O. Box 11867 Postponement 104 Blatt Building 2610 Grendon Drive Columbia, South Carolina 29211 Wilmington, Delaware 19808 Ms. Jane Lee William S. Jordan, III, Esq.

183 Valley Road Harmon, Weiss & Jordan Etters, Pennsylvania 17319 20001 S Street, N.W.

Suite 430 Ms. Marjorie M. Aamodt Washington, D.C. 20009 Mr. Norman Aamodt 200 North Church Street Lynne Bernabei, Esq.

Parkesburg, Pennsylvania 19365 Government Accountability Project 1555 Connecticut Ave., N.W.

Ms. Louise Bradford Washington, D.C. 20009 TMIA 315 Peffer Street Michael W. Maupin, Esq.

Harrisburg, Pennsylvania 17102 Hunton & Williams 707 Eact Main Street Mr. Marvin I. Lewis P. O. Box 1535 6504 Bradford Terrace Richmond Virginia 23212 Philadelphia, Pennsylvania 19149 .

Jordan D. Cunningham, Esq.

Mr. Chauncey Kepford Fox, Farr and Cunningham Ms. Judith H. Johnsrud 2320 North 2nd Street Environmental Coalition on Nuclear Power Harrisburg, Dennsylvania 17110 ,

433 Orlando Avenue State College, Pennsylvania 16801 Ms. Ellyn R. Weiss Harmon, Weiss & Jordan Mr. Donald E. Hossler 2001 S Street, N.W.

501 Vine Street Suite 430 Middletown, Pennsylvania 17057 Washington, D.C. 20009 Mr. Ad Crable  !

Lancaster New Era 8 West King Street Lancaster, Pennsylvania 17602 l

l

GPU Nuclear Corporation Three Mile Island, Unit I cc:

Atomic Safety & Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Atomic Safety & Licensing Appeal Bcard Panel (8)

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docketing and Service Section Office of the Secretary U.S. Nuclear Regulatory Commission Washington, D.C. 20555

's l

t t

f l

I t l

. - . .. . . _ . - - - - - . - - .. .. .