ML20065B882

From kanterella
Revision as of 04:52, 31 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Part 21 Rept Re 170 Wire Tendon post-tensioning Sys.Problem Lies W/Poor Const Techniques Not Nonconforming Threads. Nonconforming Threads Not Responsible for Failures Exhibited at Job Sites.Qa Procedure Encl
ML20065B882
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 01/27/1983
From: Matykiewicz C, Waitkus D
PRECISION SURVEILLANCE CORP. (FORMERLY INRYCO, INC.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20065B885 List:
References
REF-PT21-83 QA-830126-1, NUDOCS 8302230542
Download: ML20065B882 (11)


Text