MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) 2024-09-04
[Table view] Category:Meeting Summary
MONTHYEARML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML21035A1842021-02-11011 February 2021 Summary of the January 26, 2021, Meeting with Susquehanna Nuclear Regarding a Future License Amendment Request Related to Adopting Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML20065F5522020-03-19019 March 2020 Summary of February 27, 2020, Meeting with Talen Energy Regarding Future License Amendment Request Related to Creating New Condition for Inoperable Manual Synchronization Circuit at Susquehanna Steam Electric Station, Units 1 and 2 ML19308A1082019-11-18018 November 2019 Summary of Meeting with Talen Energy Regarding a Future License Amendment Request Related to Revising the Dose Consequence Analysis for a Loss-Of-Coolant Accident at Susquehanna Steam Electric Station, Units 1 and 2 ML19259A2222019-10-16016 October 2019 Summary of September 16, 2019, Closed Meeting with Susquehanna Nuclear, LLC Regarding the Transition to Allow the Use of Atrium 11 Fuel for the Susquehanna Steam Electric Station, Units 1 and 2 ML19176A0502019-07-16016 July 2019 Summary of June 18, 2019, Meeting with Talen Energy Regarding Submittal of a Potential License Amendment Request Related to Changes to the Emergency Response Organization Staffing and Augmentation ML19191A1882019-07-0909 July 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary ML19134A0292019-05-21021 May 2019 Summary of Pre-Submittal Meeting with Susquehanna Nuclear, LLC to Discuss a Potential License Amendment Request Use of Atrium 11 Fuel ML18311A2622018-11-26026 November 2018 Summary of Pre-Submittal Meeting with Susquehanna Nuclear, LLC to Discuss a Potential License Amendment Request Emergency Service Water Piping Replacement for Susquehanna Steam Electric Station, Units 1 and 2 ML18156A2632018-06-15015 June 2018 May 15, 2018, Summary of Closed Pre-Submittal Meeting with Susquehanna Nuclear, LLC to Discuss a Potential License Amendment Request the Use of Atrium 11 Fuel for Susquehanna Steam Electric Station, Units 1 and 2 ML18141A2032018-05-22022 May 2018 2018 Susquehanna Annual Assessment Meeting Summary and Attendance List ML17250A3902017-09-14014 September 2017 Susquehanna Station, Units 1 and 2 - Summary of August 10, 2017, Pre-Submittal Teleconference with Susquehanna Nuclear, LLC to Discuss a Potential License Amendment Request Re: Technical Specifications Task Force Traveler-542 (CAC Nos. MG0059 and MG0060) ML17153A1012017-06-0202 June 2017 May 4, 2017, Summary of Annual Assessment Meeting for Susquehanna Steam Electric Station Held ML16131A1942016-05-10010 May 2016 April 27, 2016, Summary of Public Meeting on Susquehanna Steam Electric Station ML15295A2022015-10-29029 October 2015 Summary of Meeting with Susquehanna Nuclear, LLC on the TSTF-425 License Amendment Request for Susquehanna Steam Electric Station, Units 1 and 2 ML15278A4922015-10-0909 October 2015 Summary of Meeting with Susquehanna Nuclear, LLC on the Emergency Action Level Scheme Change Submittal for a License Amendment for Susquehanna Steam Electric Station, Units 1 and 2 ML15174A0262015-06-23023 June 2015 Annual Assessment Meeting Summary 2014 ML14247A6082014-09-0404 September 2014 2014 Susquehanna Regulatory Performance Meeting - Summary of Public Meeting ML14191A6992014-07-31031 July 2014 July 2, 2014 Summary of Meeting with PPL Susquehanna, LLC, Pre-Submittal Meeting Regarding Future Submittal for a License Transfer Amendment for Susquehanna Steam Electric Station, Units 1 and 2 ML14133A0592014-07-0101 July 2014 Summary of Closed Meeting Between Representatives of the Army Corps of Engineers, Nuclear Regulatory Commission, Federal Energy Regulatory Commission, Exelon Generation Co, LLC, and PPL Susquehanna, LLC, to Discuss Dam Failure Analysis.. ML14104B1302014-04-14014 April 2014 Summary of Public Meeting on April 9, 2014 ML13121A0812013-05-0101 May 2013 Summary of Public Meeting, Susquehanna Steam Electric Station ML13107B1372013-04-17017 April 2013 Annual Assessment Meeting Sign in Sheets for April 10, 2013 Public Meeting ML12297A2252012-10-23023 October 2012 Summary of Substantive Cross-Cutting Issues Progress Meeting with PPL Susquehanna, LLC, and Acknowledgement of Readiness for NRC 95002 Supplemental Follow-Up Inspection ML12093A3152012-04-0202 April 2012 Summary of March 21, 2012 Susquehanna 95002 Supplemental Inspection Public Exit and Regulatory Performance Meeting ML12093A1472012-04-0202 April 2012 Annual Assessment Meeting Summary ML1015304112010-06-0707 June 2010 Summary of Conference Call with Boiling Water Reactor Vessel and Internals Project Regarding Recent Operating Experience Associated with Replacement Steam Dryer ML0919101962009-07-16016 July 2009 Summary of Telephone Conference Call Held on June 25, 2009, Between the U.S. NRC and PPL Susquehanna, LLC, Comments on the Safety Evaluation Report with Open Items Related to the License Renewal of Susquehanna Steam Electric Station, Units ML0919404402009-07-13013 July 2009 Meeting Summary, Public Meeting with PPL Susquehanna, LLC Re SCWE at Site ML0919402172009-07-13013 July 2009 SCWE Public Mtg Sign-in Sheets, for July 6, 2009 ML0914800822009-06-0101 June 2009 Summary of Telephone Conference Call Held on May 21, 2009, Between the U.S. NRC and PPL Susquehanna, LLC, Concerning the Responses to RAIs Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application ML0915204952009-06-0101 June 2009 Summary of Annual Assessment Meeting with PPL Susquehanna, LLC to Discuss the Nrc'S Assessment of the Safety Performance of the Susquehanna Steam Electric Station Units 1 and 2 for the Calendar Year 2008 ML0912502542009-05-0707 May 2009 Summary of Tele Conf Call Held on April 14th, 2009, Between the USNRC and PPL Susquehanna, LLC, Concerning Draft Requests for Additional Information Pertaining to the SSES, Units 1 and 2, License Renewal Application ML0900803792009-01-30030 January 2009 Summary of Telephone Conference Call Held on 12/18/08, Between the U.S. NRC and PPL Susquehanna, LLC, Concerning TLAA RAI ML0833101132008-12-0303 December 2008 Meeting Summary, Telephone Conference Call Between U.S. NRC and PPL Susquehanna, LLC, Concerning the Draft Request for Additional Information Pertaining to the Susquehanna Steam Electric Station Units 1 & 2, LRA ML0832209472008-11-19019 November 2008 Summary of Telephone Conference Call Held on October 10, 2008, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Llc., Concerning the Responses to Requests for Additional Information Pertaining to the Susquehanna Steam... ML0832307862008-11-19019 November 2008 11/13/2008-Summary of Telephone Conference Call Between NRC and PPL, Concerning the Responses to RAIs Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application ML0830305912008-11-0303 November 2008 Summary of Telephone Conference Call Held on Sept 24, 2008, Between the U.S. NRC and PPL Susquehanna, Llc., Concerning Draft Requests for Additional Information Pertaining to the SSES, Units 1 and 2, License Renewal Application ML0828901522008-10-21021 October 2008 Summary of Telephone Conference Call Held on October 8, 2008, Between the USNRC and PPL Susquehanna, Llc. Concerning Draft Requests for Additional Information Pertaining to the, License Renewal Application ML0828205772008-10-17017 October 2008 09/18/2008 Meeting Summary, Meeting Between the NRC and PPL Susquehanna, Llc., Concerning Requests for Additional Information Responses Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application ML0828004392008-10-17017 October 2008 09/15/2008-Summary of Telephone Conference Call Between Us NRC and PPL Susquehanna, LLC, Concerning Draft Request for Additional Information Pertaining to the Susquehanna Steam Electric Station, Units 1 & 2, License Renewal Application ML0822603532008-10-0101 October 2008 06/25/2008 Meeting Summary, Telephone Conference Call Between the NRC and PPL Susquehanna, LLC, Concerning Draft Request for Additional Information Pertaining to the Susquehanna, Units 1 and 2, License Renewal Application ML0814200522008-05-30030 May 2008 05/19/2008 Summary of Telephone Conference Call Held Between the NRC and PPL Susquehanna, LLC, Concerning Draft Request for Additional Information Pertaining to the Susquehanna, Units 1 and 2, License Renewal Application ML0811307322008-04-22022 April 2008 Summary of Annual Assessment Meeting with PPL Corporation and Susquehanna Nrc'S Assessment of the Safety Performance of the Susquehanna Steam Electric Station (Susquehanna) for Calendar Year 2007 ML0734804472008-04-0404 April 2008 05/14/2007 to 05/17/2007 - Summary of Meeting with PPL Susquehanna, LLC, Environmental Site Audit Related to the Review of the License Renewal Application ML0808501552008-03-26026 March 2008 Units 1 & 2 - Summary of March 18, 2008, Meeting with PPL Susquehanna, on Submission Details for Susquehanna Units and 2, Pose-Extended Power Uprate (EPU) Power Ascension (Tac No. MD8079) ML0801405152008-02-11011 February 2008 Summary of Telephone Conference Call Held on December 28, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC, Concerning Requests for Additional Information Pertaining to the Susquehanna Steam Electric Station, Un 2024-06-03
[Table view] |
Text
August 27, 2007 LICENSEE: PPL Susquehanna, LLC FACILITY: Susquehanna Steam Electric Station, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JULY 26, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PPL Susquehanna, LLC held a telephone conference call on July 26, 2007, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Susquehanna Steam Electric Station, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the participants and Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
/RA/
Evelyn Gettys, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosures:
- 1. List of Participants
- 2. List of Draft Requests for Additional Information cc w/encls: See next page
ML072330167 OFFICE PM:RLRA:DLR LA:DLR BC:RLRA:DLR NAME EGettys SFigueroa LLund DATE 08/22/07 08/22/07 08/27/07 TELEPHONE CONFERENCE CALL SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 26, 2007 PARTICIPANTS AFFILIATIONS Evelyn Gettys U.S. Nuclear Regulatory Commission (NRC)
George Thomas NRC David Jeng NRC Duane Filchner PPL Susquehanna, LLC Ross Gardner PPL Susquehanna, LLC Enclosure 1
DRAFT REQUESTS FOR ADDITIONAL INFORMATION SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION July 26, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PPL Susquehanna, LLC held a telephone conference call on July 26, 2007, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Susquehanna Steam Electric Station (SSES), Units 1 and 2 license renewal application (LRA).
D-RAI 2.4-1 The first sentence in the fourth paragraph of the LRA Section 2.4 Scoping and Screening Results: Structures states that The major structures in the scope of license renewal are the: .... Per Title 10 of the Code of Federal Regulations, Part 54.4 (10 CFR 54.4), all structures that perform an intended function stated in 10 CFR 54.4(a) are required to be included within the scope of license renewal and not just the major structures. Please confirm that the in-scope structures and structure categories listed in Section 2.4 is all inclusive. Please clarify the language used in that section of the LRA, The major structures in the scope .... Please include any remaining structures that may be within the scope of license renewal and provide corresponding scoping, screening and aging management review (AMR) results information relevant to the LRA.
Discussion: The applicant will remove the term major and list the structures as discussed.
They indicated that the question is clear. This D-RAI will be sent as a formal RAI.
D-RAI 2.4.1-2 Table 2.4-1 lists penetrations (mechanical and electrical, primary containment boundary) as components subject to an AMR. This does not seem to include the penetrations through the Reactor Shield Wall with hinged doors or removable plugs that facilitate piping (feedwater, reactor recirculation, recirculation inlet, etc.) connections to the reactor vessel which would provide access for in-service inspection (see FSAR Section 3.8.3.1.3 and drawings C-1932 Sheets 3 & 5). Please confirm the inclusion or exclusion of these penetrations and their doors/plugs from the scope of license renewal (LR) and subject to an AMR. If they were not included as an oversight, please provide a description of their scoping, screening and AMR. If they are excluded from the scope of license renewal, please provide the technical basis for the exclusion.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
RAI 2.4.1-3 Section 2.4.1 and Table 2.4-1 list Access Hatches (equipment hatch, personnel airlock, suppression chamber access hatches, and the control rod drive removal hatch) as Primary Containment components subject to an AMR. It is not explicitly clear from Table 2.4-1 and Enclosure 2
Table 2.4-10 if the flange double-gaskets, hatch locks, hinges and closure mechanisms that help prevent loss of sealing/leak-tightness for these listed hatches are included within the scope of LR and subject to an AMR. Please confirm the inclusion or exclusion of these components.
If they were not included as an oversight, please provide a description of their scoping and AMR. If they are excluded from the scope of LR, please provide the technical basis for the exclusion Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
RAI 2.4.1-4 Based on information provided in LRA Section 2.4.1 and Tables 2.4-1 and 2.4-10, it is not clear if all drywell pipe restraints/whip restraints are within the scope of LR. If they are not included as an oversight, please provide a description of their scoping and AMR. If they are covered somewhere else in the LRA, please indicate the location. If they are excluded from the scope of LR, please provide the technical basis for the exclusion.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
RAI 2.4.10-1 Sections 2.4.1 thru 2.4.9 state that the structural commodities for these respective structures are addressed in the bulk commodities evaluation in Section 2.4.10. Table 2.4-10 lists the Bulk Commodities Components Subject to an AMR in categories based on the material of the component type. This table does not identify the specific structures addressed in Sections 2.4.1 thru 2.4.9 in which these individual component types are located. Please add a column to Table 2.4-10 listing the structure(s) in which each bulk commodity component type is located.
Clearly state if the intent of the Table is for every occurrence (all inclusive) of these component types in each of the applicable structures are in-scope and subject to an AMR. If not, specifically identify those cases which are in-scope and subject to an AMR and those that are not in-scope and excluded from an AMR with technical justification for exclusion. Please confirm and address if there is or is not any Lubrite sliding support bearings/surfaces in-scope and subject to an AMR and will need to be included in Table 2.4-10.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
Letter to PPL Susquehanna, from E. Gettys, dated August 27, 2007
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JULY 26, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC SSmith (srs3)
SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDss RidsOgcMailCenter RidsNrrAdes YDiaz RGuzman BRogers EGettys
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Robert A. Saccone Bryan A. Snapp, Esq.
Vice President - Nuclear Operations Associate General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Terry L. Harpster Supervisor - Document Control Services General Manager - Plant Support PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSA4 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro Allegheny Electric Cooperative, Inc.
Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Walter E. Morrissey Pennsylvania Department of Supervising Engineer Environmental Protection Nuclear Regulatory Affairs Rachel Carson State Office Building PPL Susquehanna, LLC P.O. Box 8469 769 Salem Blvd., NUCSA4 Harrisburg, PA 17105-8469 Berwick, PA 18603-0467 Senior Resident Inspector Michael H. Crowthers U.S. Nuclear Regulatory Commission Supervising Engineer P.O. Box 35, NUCSA4 Nuclear Regulatory Affairs Berwick, PA 18603-0035 PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Regional Administrator, Region 1 Allentown, PA 18101-1179 U.S. Nuclear Regulatory Commission 475 Allendale Road Steven M. Cook King of Prussia, PA 19406 Manager - Quality Assurance PPL Susquehanna, LLC Board of Supervisors 769 Salem Blvd., NUCSB2 Salem Township Berwick, PA 18603-0467 P.O. Box 405 Berwick, PA 18603-0035 Luis A. Ramos Community Relations Manager, Dr. Judith Johnsrud Susquehanna National Energy Committee PPL Susquehanna, LLC Sierra Club 634 Salem Blvd., SSO 443 Orlando Avenue Berwick, PA 18603-0467 State College, PA 16803
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Ms. Julie Keys Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708