|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20235B4531987-09-22022 September 1987 Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ST-HL-AE-1666, Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports1986-05-22022 May 1986 Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports ML20140F3691986-01-14014 January 1986 Further Response to FOIA Request for Several Categories of Documents Re Pressure Suppression Containment.Fsar & SER for Limerick Only Documentation Re 4x4 Tests.Encl Apps D-G Documents Responsive to Item 4 Also Available in PDR ML20063H0331982-08-27027 August 1982 Advises That Plants Have Been Canceled.Alternative Dispositions of Application to Be Discussed W/Nrc. Certificate of Svc Encl ML20062G8131982-08-11011 August 1982 Forwards NRC to Util Re Slippage of CP Issuance Date,For Distribution to Parties ML20054H7481982-06-19019 June 1982 Forwards Houston Chronicle 820617 Article Re Util Requested Rate Increase.Article Appears Relevant to Ultimate Fate of Plant & Appears to Represent Slight Change from Util Dec 1981 Position on Plant Destiny ML20054H7581982-06-18018 June 1982 Advises That Feasibility of Continuing Plant Const Remains Under Util Consideration,W/Ultimate Determination Depending on Disposition of Request for Rate Relief Pending Before Tx Public Utils Commission ML20052F2301982-05-0505 May 1982 Requests ASLB Consider 820429 Findings of Fact Even Though Findings Late.Due Date Misconstrued.Striking Findings Would Be Significant Penalty for Minor Infraction ML20050H2341982-04-0606 April 1982 Admits Truth of Items 160-163 in 820323 Request for Admissions.Relevance Not Admitted.Related Correspondence ML20050J0231982-04-0606 April 1982 Forwards Applicant Answers to Doherty Second & Third Sets of Interrogatories,Questions 29 & 8,respectively,re Quadrex Rept.Related Correspondence ML20050E2851982-04-0505 April 1982 Forwards Applicant Answers & Objections to J Doherty Sixth & Seventh Sets of Interrogatories Re Quadrex Rept.Related Correspondence ML20050E4131982-04-0505 April 1982 Advises of Typographical Error in Applicant Answers & Objections to Doherty Fifth Set of Interrogatories.Related Correspondence ML20050C4991982-03-26026 March 1982 Forwards Jh Goldberg Testimony on Technical Qualifications, Lj Sas Testimony on Tx Pirg Addl Contention 31 & Applicant Response to Jf Doherty Request for Documents.Related Correspondence ML20042C6231982-03-25025 March 1982 Explains Problems W/Timing of Filings & Tx Bar Exam ML20042B5051982-03-16016 March 1982 Forwards Bechtel Preliminary Assessment Rept on Quadrex Rept.J Doherty Also Being Served Which Renders 820305 Motion for Bechtel Quadrex Rept Review Moot.W/O Encl. Related Correspondence ML20049J6861982-03-15015 March 1982 Advises That Future of Facility Still Under Review.Aslb Timely Decision Is Important Factor in Evaluation. Certificate of Svc Encl ML20049J6701982-03-10010 March 1982 Forwards Table of Contents & Citations Inadvertently Omitted from Applicant 820305 Brief in Opposition to Appeal of R Alexander ML20041F0881982-03-0909 March 1982 Forwards Attachment 1 to Applicant Answers to Doherty First Set at Interrogatories Re Quadrex Rept ML20041D8591982-03-0202 March 1982 Comments on Generic Ltr 81-40 Re Qualifications of Reactor Operators - License Exams ML20041B0671982-02-18018 February 1982 Responds to NRC 820205 Ltr Re Application of Final Rule on Licensing Requirements for Pending CP & Mfg License Applications.Final Rule Did Not Identify Need for Clarifying Changes to Facility Application.Commitments Acceptable ML20040H3381982-02-12012 February 1982 Forwards Util 820212 News Release Re Feasibility of Plant Licensing & Const,Per 820209 Conversation ML19255A1721982-01-0606 January 1982 Requests Temporary Waiver to 10CFR73.21 (d)(2) Re Storage of Unclassified Safeguards Info.Gsa Approved Containers Have Been Requisitioned W/Earliest Possible Delivery Date of 820315 ML20062M6221981-12-11011 December 1981 Requests Citizens for Fair Util Regulation Respond to Applicant Interrogatories 45-3 Through 83-3,subj of ASLB 810728 Order.Response Necessary So Applicant Can Seek Addl Discovery on Contention 4.Related Correspondence ML20040A8681981-10-0404 October 1981 FOIA Request for NRC Reply to Senator L Bentsen Re Status of Facilities ML20009H2731981-08-0606 August 1981 Forwards Revised Sections & Table of Contents Discussed in NRC 810610 Ltr for ETR-1001,Ebasco Nuclear QA Program Manual.Revisions,Which Are Dtd 810731 Will Be Included in Change 10 to ETR-1001 ML20010A3781981-08-0505 August 1981 Forwards Mod to Util Submittal Addressing Item II.K.2.16 of NUREG-0718,reactor Coolant Pump Seal Damage Following Small Break LOCA W/Loss of Offsite Power.Mod Should Be Inserted on Page 0-8 of App 0 to PSAR ML20010B3621981-08-0303 August 1981 Responds to Telcon Which Reminded of Failure to Encl Notice of Persons Served W/Tx Pirg Supplemental Direct Written Testimony of D Marrack ML20009A8901981-07-0707 July 1981 Commits to Compliance W/Final Resolution of Core Thermocouple Issue to Be Determined by NRC in Near Future ML20009B1991981-07-0707 July 1981 Informs That Doherty 810622 Ltr,Per ASLB 810422 Order,Does Not Provide Any Substantive Rebuttal to Applicant & NRC Pleadings Re Doherty Motion for Reconsideration ML20009A8151981-06-30030 June 1981 Requests That Document Distribution List Be Revised Per Encl List ML20005B6161981-06-26026 June 1981 Submits Clarification of Util Position Re Use of Aci/Asme Std Code for Concrete Reactor Vessels & Containments.Code Provision Re Stress Limit Increase for Test Conditions Is Appropriate.Requests NRC Review W/Asme Code Committee ML20005A8971981-06-25025 June 1981 Forwards List of Contentions & ASLB Questions to Be Addressed in Aug & Sept 1981 ML19346A3371981-06-18018 June 1981 Forwards Amend 59 to PSAR ML20004C7521981-05-28028 May 1981 Forwards marked-up Version of Amend 57 to Psar.Mods Were Made as Result of NRC 810511-27 Review Meeting.Amend Is Available in Central Files Only ML20004E1401981-05-26026 May 1981 Confirms Commitment to Install Jetty Sys to Stabilize Bank of Brazos River in Vicinity of Proposed Plant ML20004C6611981-05-26026 May 1981 Forwards Proposed Order of Presentation of Witnesses for Two Wks of June Hearings.Related Correspondence ML19351A1131981-05-18018 May 1981 Expresses Concern Re Const of Facility ML20126K6671981-05-18018 May 1981 Forwards Admitted Emergency Planning Contention,Schuessler Consolidated Contention 1 ML20126L1321981-05-16016 May 1981 Opposes Facility Licensing ML19347F5791981-05-15015 May 1981 Advises That Ebasco Svcs,Inc Will Benchmark Pipe Stress Computer Program Code,Pipestress 2010,against NUREG CR-1677, in Response to NRC Request.Program Will Be Scheduled for Completion Near End of 1983 ML19347F2611981-05-15015 May 1981 Forwards Amend 58 to Facility PSAR ML19350E9951981-05-0505 May 1981 Forwards Summary of Review of Facility Evacuation Time Estimate Per NUREG-0654,Revision 1.No Permanent Population Data Supplied,Although Used to Make Estimates of Evacuation Vehicles.No Indication of Review by State & Local Officials ML20008G0811981-05-0505 May 1981 Forwards Proposed Schedule for Presentation of Witnesses for 810511-22 Hearings.Other Parties Concur.Related Correspondence ML20008G1851981-05-0101 May 1981 Requests That 810511-22,0601-12 Evidentiary Hearings on Health & Safety Issues Be Rescheduled for 810713-17 & 20-24 Subj to ASLB Availability.Lists of Contentions Will Be Provided by 810518 ML20003G9201981-05-0101 May 1981 Forwards Amend 57 to PSAR ML20003E7801981-04-0909 April 1981 Opposes Speedup Given to Licensing Process for Units ML20126H0631981-03-31031 March 1981 Opposes Hastening Licensing Process at Facilities ML20003E6211981-03-30030 March 1981 Advises That Review of Fes Suppl 2 Now Complete.Document Adequately Responds to Comments Issued on Draft Supplemental EIS 1993-04-12
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ST-HL-AE-1666, Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports1986-05-22022 May 1986 Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports ML20063H0331982-08-27027 August 1982 Advises That Plants Have Been Canceled.Alternative Dispositions of Application to Be Discussed W/Nrc. Certificate of Svc Encl ML20054H7481982-06-19019 June 1982 Forwards Houston Chronicle 820617 Article Re Util Requested Rate Increase.Article Appears Relevant to Ultimate Fate of Plant & Appears to Represent Slight Change from Util Dec 1981 Position on Plant Destiny ML20054H7581982-06-18018 June 1982 Advises That Feasibility of Continuing Plant Const Remains Under Util Consideration,W/Ultimate Determination Depending on Disposition of Request for Rate Relief Pending Before Tx Public Utils Commission ML20052F2301982-05-0505 May 1982 Requests ASLB Consider 820429 Findings of Fact Even Though Findings Late.Due Date Misconstrued.Striking Findings Would Be Significant Penalty for Minor Infraction ML20050H2341982-04-0606 April 1982 Admits Truth of Items 160-163 in 820323 Request for Admissions.Relevance Not Admitted.Related Correspondence ML20050J0231982-04-0606 April 1982 Forwards Applicant Answers to Doherty Second & Third Sets of Interrogatories,Questions 29 & 8,respectively,re Quadrex Rept.Related Correspondence ML20050E2851982-04-0505 April 1982 Forwards Applicant Answers & Objections to J Doherty Sixth & Seventh Sets of Interrogatories Re Quadrex Rept.Related Correspondence ML20050E4131982-04-0505 April 1982 Advises of Typographical Error in Applicant Answers & Objections to Doherty Fifth Set of Interrogatories.Related Correspondence ML20050C4991982-03-26026 March 1982 Forwards Jh Goldberg Testimony on Technical Qualifications, Lj Sas Testimony on Tx Pirg Addl Contention 31 & Applicant Response to Jf Doherty Request for Documents.Related Correspondence ML20042C6231982-03-25025 March 1982 Explains Problems W/Timing of Filings & Tx Bar Exam ML20042B5051982-03-16016 March 1982 Forwards Bechtel Preliminary Assessment Rept on Quadrex Rept.J Doherty Also Being Served Which Renders 820305 Motion for Bechtel Quadrex Rept Review Moot.W/O Encl. Related Correspondence ML20049J6861982-03-15015 March 1982 Advises That Future of Facility Still Under Review.Aslb Timely Decision Is Important Factor in Evaluation. Certificate of Svc Encl ML20049J6701982-03-10010 March 1982 Forwards Table of Contents & Citations Inadvertently Omitted from Applicant 820305 Brief in Opposition to Appeal of R Alexander ML20041F0881982-03-0909 March 1982 Forwards Attachment 1 to Applicant Answers to Doherty First Set at Interrogatories Re Quadrex Rept ML20041D8591982-03-0202 March 1982 Comments on Generic Ltr 81-40 Re Qualifications of Reactor Operators - License Exams ML20041B0671982-02-18018 February 1982 Responds to NRC 820205 Ltr Re Application of Final Rule on Licensing Requirements for Pending CP & Mfg License Applications.Final Rule Did Not Identify Need for Clarifying Changes to Facility Application.Commitments Acceptable ML20040H3381982-02-12012 February 1982 Forwards Util 820212 News Release Re Feasibility of Plant Licensing & Const,Per 820209 Conversation ML19255A1721982-01-0606 January 1982 Requests Temporary Waiver to 10CFR73.21 (d)(2) Re Storage of Unclassified Safeguards Info.Gsa Approved Containers Have Been Requisitioned W/Earliest Possible Delivery Date of 820315 ML20062M6221981-12-11011 December 1981 Requests Citizens for Fair Util Regulation Respond to Applicant Interrogatories 45-3 Through 83-3,subj of ASLB 810728 Order.Response Necessary So Applicant Can Seek Addl Discovery on Contention 4.Related Correspondence ML20040A8681981-10-0404 October 1981 FOIA Request for NRC Reply to Senator L Bentsen Re Status of Facilities ML20009H2731981-08-0606 August 1981 Forwards Revised Sections & Table of Contents Discussed in NRC 810610 Ltr for ETR-1001,Ebasco Nuclear QA Program Manual.Revisions,Which Are Dtd 810731 Will Be Included in Change 10 to ETR-1001 ML20010A3781981-08-0505 August 1981 Forwards Mod to Util Submittal Addressing Item II.K.2.16 of NUREG-0718,reactor Coolant Pump Seal Damage Following Small Break LOCA W/Loss of Offsite Power.Mod Should Be Inserted on Page 0-8 of App 0 to PSAR ML20010B3621981-08-0303 August 1981 Responds to Telcon Which Reminded of Failure to Encl Notice of Persons Served W/Tx Pirg Supplemental Direct Written Testimony of D Marrack ML20009A8901981-07-0707 July 1981 Commits to Compliance W/Final Resolution of Core Thermocouple Issue to Be Determined by NRC in Near Future ML20009B1991981-07-0707 July 1981 Informs That Doherty 810622 Ltr,Per ASLB 810422 Order,Does Not Provide Any Substantive Rebuttal to Applicant & NRC Pleadings Re Doherty Motion for Reconsideration ML20009A8151981-06-30030 June 1981 Requests That Document Distribution List Be Revised Per Encl List ML20005B6161981-06-26026 June 1981 Submits Clarification of Util Position Re Use of Aci/Asme Std Code for Concrete Reactor Vessels & Containments.Code Provision Re Stress Limit Increase for Test Conditions Is Appropriate.Requests NRC Review W/Asme Code Committee ML20005A8971981-06-25025 June 1981 Forwards List of Contentions & ASLB Questions to Be Addressed in Aug & Sept 1981 ML19346A3371981-06-18018 June 1981 Forwards Amend 59 to PSAR ML20004C7521981-05-28028 May 1981 Forwards marked-up Version of Amend 57 to Psar.Mods Were Made as Result of NRC 810511-27 Review Meeting.Amend Is Available in Central Files Only ML20004E1401981-05-26026 May 1981 Confirms Commitment to Install Jetty Sys to Stabilize Bank of Brazos River in Vicinity of Proposed Plant ML20004C6611981-05-26026 May 1981 Forwards Proposed Order of Presentation of Witnesses for Two Wks of June Hearings.Related Correspondence ML19351A1131981-05-18018 May 1981 Expresses Concern Re Const of Facility ML20126L1321981-05-16016 May 1981 Opposes Facility Licensing ML19347F5791981-05-15015 May 1981 Advises That Ebasco Svcs,Inc Will Benchmark Pipe Stress Computer Program Code,Pipestress 2010,against NUREG CR-1677, in Response to NRC Request.Program Will Be Scheduled for Completion Near End of 1983 ML19347F2611981-05-15015 May 1981 Forwards Amend 58 to Facility PSAR ML20008G0811981-05-0505 May 1981 Forwards Proposed Schedule for Presentation of Witnesses for 810511-22 Hearings.Other Parties Concur.Related Correspondence ML19350E9951981-05-0505 May 1981 Forwards Summary of Review of Facility Evacuation Time Estimate Per NUREG-0654,Revision 1.No Permanent Population Data Supplied,Although Used to Make Estimates of Evacuation Vehicles.No Indication of Review by State & Local Officials ML20008G1851981-05-0101 May 1981 Requests That 810511-22,0601-12 Evidentiary Hearings on Health & Safety Issues Be Rescheduled for 810713-17 & 20-24 Subj to ASLB Availability.Lists of Contentions Will Be Provided by 810518 ML20003G9201981-05-0101 May 1981 Forwards Amend 57 to PSAR ML20003E7801981-04-0909 April 1981 Opposes Speedup Given to Licensing Process for Units ML20126H0631981-03-31031 March 1981 Opposes Hastening Licensing Process at Facilities ML20003E6211981-03-30030 March 1981 Advises That Review of Fes Suppl 2 Now Complete.Document Adequately Responds to Comments Issued on Draft Supplemental EIS ML19345G5351981-03-27027 March 1981 Forwards Ltr Advising of Stretchout in Facility Const Schedule Due to Financial Constraints.Urges That ASLB Maintain Proceeding Schedule Consistent W/Decision Date Not Later than Early 1982.Certificate of Svc Encl ML20003D6781981-03-25025 March 1981 Advises NRC That Inservice Dates of Five Planned Generating Units Will Be Delayed Due to Financing Constraints.Allens Creek Facility Will Be Started Up in Mar 1991.Urges NRC to Continue Timely Licensing Support ML20003D6961981-03-25025 March 1981 Informs That NUREG-0470,final Eis,Meets Requirements for Filing Under Section 1506.9 of Ceq Regulations.Notice of Availability Will Be Included in 810327 Fr.Public Review Period Will End on 810511 ML19345G7941981-03-24024 March 1981 Advises That All Correspondence Formerly Sent to EA Turner Should Be Addressed as Indicated.Related Correspondence ML19350C6251981-03-20020 March 1981 Advises That Amend 56 to PSAR Was Filed in Anticipation of Preparation of Testimony Re Health & Safety Issues to Be Tried in May.Testimony Will Relate to Current Design for Plant.Psar Changes Encl.Related Correspondence 1987-08-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ST-HL-AE-1666, Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports1986-05-22022 May 1986 Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports ML20049J6861982-03-15015 March 1982 Advises That Future of Facility Still Under Review.Aslb Timely Decision Is Important Factor in Evaluation. Certificate of Svc Encl ML20041D8591982-03-0202 March 1982 Comments on Generic Ltr 81-40 Re Qualifications of Reactor Operators - License Exams ML20041B0671982-02-18018 February 1982 Responds to NRC 820205 Ltr Re Application of Final Rule on Licensing Requirements for Pending CP & Mfg License Applications.Final Rule Did Not Identify Need for Clarifying Changes to Facility Application.Commitments Acceptable ML20040H3381982-02-12012 February 1982 Forwards Util 820212 News Release Re Feasibility of Plant Licensing & Const,Per 820209 Conversation ML19255A1721982-01-0606 January 1982 Requests Temporary Waiver to 10CFR73.21 (d)(2) Re Storage of Unclassified Safeguards Info.Gsa Approved Containers Have Been Requisitioned W/Earliest Possible Delivery Date of 820315 ML20010A3781981-08-0505 August 1981 Forwards Mod to Util Submittal Addressing Item II.K.2.16 of NUREG-0718,reactor Coolant Pump Seal Damage Following Small Break LOCA W/Loss of Offsite Power.Mod Should Be Inserted on Page 0-8 of App 0 to PSAR ML20009A8901981-07-0707 July 1981 Commits to Compliance W/Final Resolution of Core Thermocouple Issue to Be Determined by NRC in Near Future ML20009A8151981-06-30030 June 1981 Requests That Document Distribution List Be Revised Per Encl List ML20005B6161981-06-26026 June 1981 Submits Clarification of Util Position Re Use of Aci/Asme Std Code for Concrete Reactor Vessels & Containments.Code Provision Re Stress Limit Increase for Test Conditions Is Appropriate.Requests NRC Review W/Asme Code Committee ML19346A3371981-06-18018 June 1981 Forwards Amend 59 to PSAR ML20004C7521981-05-28028 May 1981 Forwards marked-up Version of Amend 57 to Psar.Mods Were Made as Result of NRC 810511-27 Review Meeting.Amend Is Available in Central Files Only ML20004E1401981-05-26026 May 1981 Confirms Commitment to Install Jetty Sys to Stabilize Bank of Brazos River in Vicinity of Proposed Plant ML19347F5791981-05-15015 May 1981 Advises That Ebasco Svcs,Inc Will Benchmark Pipe Stress Computer Program Code,Pipestress 2010,against NUREG CR-1677, in Response to NRC Request.Program Will Be Scheduled for Completion Near End of 1983 ML19347F2611981-05-15015 May 1981 Forwards Amend 58 to Facility PSAR ML20003G9201981-05-0101 May 1981 Forwards Amend 57 to PSAR ML20003D6781981-03-25025 March 1981 Advises NRC That Inservice Dates of Five Planned Generating Units Will Be Delayed Due to Financing Constraints.Allens Creek Facility Will Be Started Up in Mar 1991.Urges NRC to Continue Timely Licensing Support ML19345G7941981-03-24024 March 1981 Advises That All Correspondence Formerly Sent to EA Turner Should Be Addressed as Indicated.Related Correspondence ML20008E8721981-03-0909 March 1981 Forwards Amend 56 to PSAR ML19343C0951981-02-16016 February 1981 Requests Commencement of Hearings on Safety Issues by 810501.Pending Contentions Are Not TMI-related or Subj of Motions for Summary Disposition.Suppl to Fes Re Alternative Sites & Environ Effects Should Be Finalized ML19345F1591981-01-21021 January 1981 Forwards Amend 55 to Psar,Consisting of Public Version of Revised Emergency Plan.Svc List Encl ML19340E7641981-01-0909 January 1981 Forwards Listing of Documents,Applications & Requests Which Applicant Will Forward Between 810101 & 831231 ML20002C0471980-12-31031 December 1980 Forwards Annual Repts for Houston Lighting & Power, Central Power & Light & Financial Statements for City of San Antonio,Tx & City of Austin,Tx ML19321B2471980-07-23023 July 1980 Requests Change of Addressee on NRC Correspondence from EA Turner to Gw Oprea,Jr.Address Is Unchanged ML19312E9071980-05-13013 May 1980 Advises NRC That IE Insp Repts 50-445/80-08 & 50-446/80-08, Dtd 800418,contain No Proprietary Info ML19309A7471980-03-26026 March 1980 Forwards Environ,Assessment & Responses to NRC Questions: Transportation of Reactor Pressure Vessel, Prepared by Dames & Moore ML19294C2701980-02-28028 February 1980 Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized ML19294B1431980-02-20020 February 1980 Ack Receipt of NRC 800201 Ltr Re Proposed Barge Offloading Site & Overland Transportation Route.Plans to Respond to Questions by 800321 ML19211A8521979-12-20020 December 1979 Forwards Containment Structures Design Rept,Revision 2 Incorporating GE Load Definition Info & Documenting Design Change to Containment Dome ML19211A8731979-12-20020 December 1979 Forwards Amend 54 to PSAR ML19254F9121979-11-14014 November 1979 Responds to 791010 Ltr Re TMI Lessons Learned Task Force Recommendations.Forwards Commitments Re Encls 3-5 & 7. Commitments Will Be Incorporated Into Plant Design Operating Procedures & Emergency Plans ML19210D0511979-11-14014 November 1979 Forwards Oversize Map of Proposed Area for Locating Reactor Pressure Vessel off-loading Facility ML19254E9911979-10-26026 October 1979 Forwards Addl Info Re Overland Transportation of Reactor Pressure Vessel ML19208A9671979-09-17017 September 1979 Forwards Psar,Amend 53 ML19242D5851979-08-0909 August 1979 Forwards Commitments to NUREG-0578,IE Bulletin 79-08 & Emergency Plan.Commitments Will Be Incorporated Into Plant Design Operating Procedures or Emergency Plans.Details Re Implementation Will Be Contained in FSAR ML19259B8041979-03-21021 March 1979 Forwards Amend 51 to Psar.W/Affidavit ML19281A5671979-03-0909 March 1979 Forwards Responses to Questions 9,11,12,14-18 & 22 from Alternative Site Visit Questions of 790205.W/agricultural Statistics for 1977 & Tx Water Resources Data for Water Year 1977.W/oversized Drawing ML19281A1821979-02-22022 February 1979 Forwards Responses to Questions 2,3,5,6,7,10,19 & 20 from NRC 790205 Ltr Re Alternative Sites ML19289C5301979-01-15015 January 1979 Forwards Amend 50 to PSAR ML19256A8451979-01-10010 January 1979 Forwards Report Re Question 361.4 of Unit 1 Psar,App M to Section 2.5 ACNGS-PSAR,design of Ultimate Heat Sink Slopes Using Special Residual Clay Strengths.W/Drawings ML20147J4071978-12-21021 December 1978 Forwards Amend 49 to Preliminary Safety Analysis Rept for Subj Facil W/Affidavit ML19263B3571978-12-19019 December 1978 Responds to NRC 781206 Ltr Re Violations Noted in IE Insp Rept 50-466/78-03 on 781114-17.Corrective Actions:Records Mgt Sys Procedures Will Be Revised to Verify QA Plan Reviewed & Procedures Revised by 781208 ML20148T4561978-12-0404 December 1978 Forwards Amend 46 to Subj Facil PSAR ML19274C7511978-10-23023 October 1978 Responds to 780922 NRC Ltr Re Violation Noted in Inspec Rept #50-466/78-02.Corrective Actions:Unapproved Draft Procedures Reviewed & Other Procedures Will Be Revised ML19259B8071978-07-19019 July 1978 Responds to Issues in PSAR & Suppl 1 to Ser.Have Completed Review of Purchasing Uncontrolled Mineral Interests within Exclusion Area of Facility.Util Now Controls All Mineral Interests within Exclusion Area ML20076M4701976-10-0707 October 1976 Confirms 760907 Telcon Re Reactivation of Unit 1 Const on Modified Schedule.Plans for Unit 2 Canceled.Ltr Describing Design Changes Discussed at 760923 Meeting Will Be Submitted in mid-Nov 1976 1987-08-25
[Table view] |
Text
{{#Wiki_filter:, _.
flOUSt00 lll r .
1 ComJany l
! Electric Tower lh I RO. Box 1700 Houston. Texas 77001 October 26, 1979 AC-HL-AE-373 Mr. R. W. Froelich Department of Site Safety and Environmental Evaluation Mail Stop P-550 Environmental Projects Branch No.1 U. C. Nuclear Regulatory Commission Washington, D. C. 20555 e- ne-L r~~.=,.r 2 e n._= =mn-- v.Lr C ._ v- e m v e.
= .n.sv oupo=Cm.
-. . . . r = n 2. . n a = .v4- n .1. . u .c~.n.1vd REACTCP PRESSURE VESSEL OVERLAND TRANSPCRTATION
Dear Mr. Froelich:
Per your request, Houston Lighting i Power Company forwards the enclosed information regarding overland transportation of the Allena Creek Reactor Pressure Vessel. The enclosed information was taken entirely from the document " Feasibility Study for Transporting Nuclear Pressure Vessel" (1974).
This document was referenaed in the Applicant's responses to finderstein's Second Set of Interrogatories and Requests for Production of Documents, April 17, 1979 Sir. c ere ly ,
f.
W. . ' . McGuire Principal Engineer Environmental Planning and Assessment RWL/ deb Attachment cc: see next page
'O 6$\
7911050 300 1269 292
SERVICE LIST Sheldon J. Wolfe, F: , . , C. m icman Brenda McCorkle Atomic Safety and Licensing 6140 Darnell Board Panel Houston, Texas 77073 U.S. Nuclear Regulatory Commission Washington, D. C. 20555 F. H. Potthoff, III 7200 Shady Villa, #110 Dr. E. Leonard Cheatum Houston, Texas 77055 Route 3, Box 350A Wackinsville, Georgia 30677 Wayne E. Rentfro P. C. Box 1335 Mr. Gustave A. Linenberger Rosenberg, Texas 77471 Atomic Safety and Licensing Ecard Panel U.S. Nuclear Regulatory Commicsion James M. Scott, Jr.
Washingtcn, D. C. 20555 8302 Albacore Houston, Texas 77074 Richard Lowerre, Esq.
Assistant Attorney General Eryan L. Baker for the State of Texas 1118 Montrose P. O. Box 12548 Houston, Texas 77019 Capitol Station Austin, Texas 78711 Dorothy F. Carrick Box 409, Wagon Rd. Rfd.#1 Steve Schinki, Esq. Wallis, Texas 77485 Staff Counsel U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Carolina conn 1414 Scenic Ridge Housten, Texas '7043 John F. Doherty 4727 Alconbury Street Houston, Texas 77021 Elinore P. Cumings Route 1, Box 138V Rosenberg, Texas 77471 Robert S. Framscn Madeline Bass Framson 4822 Waynesboro Drive Stephen A. Doggett, Esc.
Houston, Texas 77035 P. O. Box 592 Rosenberg, Texas 77471 2arro Hinderstein 8739 Link Terrace Houston, Texas 77025 Robin Griffith 1034 Sally Ann Rosenberg, Texas 77471 D. Marrack 420 v u lberry Lane Bellaire, Texas 77401 1
1269 293
.. eotis Johnston 1407 Scenic Ridge Housten, Texas 77042 Rosemary N. Lemmer 11423 cak Spring Houston, Texas 77043 Kathryn Otto Route 2, Box 62L Richmond, Texas 77469 Frances Pavlovic 111 Datonia Bellaire, Tex ' /401 Charles Pere:
1014 Montrose Houston, Texas 77019
'dilliam Schuessler 5810 Darnell Hcuston, Texas 77074 Patricia L. Strelein Route 2, Ecx 395C Richmond, Texas Glen Va.4 Slyke 1739 Marshall Houston, Texas 77098 Donald D. 'deave r P. O. Drawer V Simenton, Texas 77476 Connie Wilson 11427 Cak Spring Houston, Texas 77043 2
1269 294
( Q,"
- I HOUSTON UdNGS' E-k ![[.,1 ,,
, WALLI e i \
l i
< h nic--o : ,
4 g .r.: N, -
k v as
,.a..
A 4 k
it .
19 4
. cro.Ita e Y
- f PR:P:st:
OVERLAN'
(
r f, R 0 L'T E Mj ,,..t3 ys
, si o
e.
/
% f c.
er j ,,
I ? es cc..-s .
'. I 3
.Tm
% s 4
s.:r .s . , g: . : , ,
N f.s,
. 04' CITT D,
/+,$
o , e ,
1269 295 HOUSTON LIGHTING & POWER COMPANY
[A u.,: ...,t, Allens Creek Nuclear Generating Station I
..t'**' Uede 1 8 t*
We6 -
- p. PROPOIE CYER'J'C RO'.'TE RPV TRANSP:RT
/ h .. ':ts4ssph* .
nwe 1
Attachment 1 ACNGS REACTOR PRESSURE VESSEL OVERLAND TRANSPORTATION ROUTE Following offloading on the east bank of the San Bernard River near FM 522, the overland transportation route for the Allens Creek Reactor Pressure Vessel would be:
- 1. FM 522 for 5.1 miles to State Highway 36.
- 2. State Highway 36 for 21.4 miles through West Columbia, Damon, and Guy to FM 360 at Needville.
3 FM 360 for 9 1 miles through Needville to J.S. Highway 59
- 4. U.S. 59 for 0.7 miles to FM 1875 5 FV 1575 for 4.7 miles to U.S. Highway 90.
- 6. U.S. 90 for 1.2 miles to FM 1952.
7 FM 1952 for 9.6 miles to State Highway 36 at Wallis.
- 3. State Hi, ay 36 through Wallis for 5.2 miles to the Allens Creek site.
This route is shown on Figure 1. The total highway bravel is 52 miles with an anticipated travel time of twelve (12) days.
Although the overhead obstacles are minimal for this distance and there are no major river or creeks to cross, there are several small culvert type irrigation ditches that need crossing.
This can be done by matting on the road over the culvert. The Varner Creek Bridge requires by-passing. The route has very little traffic and the seven (7) traffic signals along the route present no problems.
The vessel will be transported overlr.nd on a multi-tired trailer moving at a maxi;..um speed of 3.0 miles per hour. Two (2) 500 horsepower tractors will power the trailer.
The topography along each route is flat. All roads are paved with a gravel and aggregate base and hard clay sub base. All roads except the access roads from barge slip to the highway meet Texas Highway Department I-20 road specification. The trailer's design and speed assure minimum or no road damage.
For assurance that the soil base is sufficient to carry the vessel without road structural damage, subsurface examinations of the roads at specific intervals along the route will be conducted as required.
Traffic control durir.g movement will be handled by each county sheriff's department in conjunction with the Texas Highwas Department. The vessel will be transpo"ted in a nine (9) vehicle caravan which will remove cr raise power lines, telephone lines and traffic signals ahead of the vessel and
}2bh
replace them after passage. The sequence of vehicles and their function is described in Table 1. Communications between the vehicles will be handled by two-way radio or walkie-talkies, rresent plans call for movement of the vessel during daylight hours only. During nightime hours, the vessel and its trailer will either remain on the road or be placed at a predesignated offroad location. Security will be contracted locally.
1269 297 2
TABLE 1 SECUENCE CF CARAVAN VEHICLES
- 1. Power Company vehicles - remove individual drop service. (*)
- 2. Telephone Company vehicle - remove drop service.
3 Texas Highway Department vehicle - removal of traffic control lights.
4 Sheriff car 5 Vessel
- 6. Sheriff car 7 Texas Highway Department - replace traffic control lights
- 8. Power Company vehicle - replace power line 9 Telephone Company vehicle - replace telephone service
(*) Power Company and Telephone Company will only remove individual lines in rural area; all other lines will be raised to minimum of 35' prior to the movement.
i269 298
.}}