ML14261A300

From kanterella
Revision as of 18:20, 3 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML14261A300
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/08/2014
From: Fish T H
Operations Branch I
To:
FitzPatrick
Shared Package
ML14101A125 List:
References
TAC U01887
Download: ML14261A300 (2)


Text

James A. Fitzpatrick September 2014 NRC Examination Examination Changes Since Initial Submittal The following changes were made to the examination based on NRC comment following the draft examination submittal:

  • Scenario #1 -Added note regarding what instrumentation is used to judge CT-2. Added role play to ensure Event #5 proceeds as desired.
  • Scenario #2 -Deleted Event #3. Revised initial conditions to ensure new Event #4 flows well without being preceded by the deleted event. Combined Events #4 and #5 on outline. Revised one malfunction to allow momentary success for an operator action.
  • Scenario #3 -Revised Event #3 to give BOP credit for actions. Revised Event #6 to use further degradation as same component as Event #5
  • Scenario #4-Re-classified Event #8 as an additional "Major". Re-distributed parts of original Event #8 into Events #9 and #1 0.
  • All JPMs-Deleted "CRS directs you to ... " in initiating cues.
  • Simulator JPM F-Changed which procedure sections will be performed to better streamline JPM while still testing the same manipulations.
  • Simulator JPM G -Deleted first part of JPM and added additional actions to the end of the JPM to test manipulations that are different from those demonstrated in some scenario events.
  • Simulator JPM H -Too much repetition of actions already demonstrated during scenarios, in particular scram actions. Replaced this JPM.
  • Plant JPM I -Added two initial conditions to cue sheet. Revised JPM cue and steps such that candidate starts at later point in procedure.
  • Plant JPM J-Added "flashlight" as required equipment for JPM.
  • Plant JPM K-Added "flashlight" as required equipment for JPM.
  • Admin JPM RO C001 -Added one initial condition to cue sheet.
  • Admin JPM RO C002-Revised dates in JPM handout.
  • Admin JPM SRO C002-Revised dates in JPM handout.
  • Admin JPM SRO EC-Revised cue to get more consistent responses from candidates.
  • Admin JPM SRO EP -Revised cue to get desired interaction between candidate and examiner.

Fixed one JPM step to match key.