Pages that link to "ML20244D324"
Jump to navigation
Jump to search
The following pages link to ML20244D324:
Displayed 20 items.
- ML20211G457 (← links)
- ML20211G449 (← links)
- RC-99-0180, Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression (← links)
- RC-99-0168, Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed (← links)
- ML20210V321 (← links)
- ML20209G093 (← links)
- ML20209F862 (← links)
- RC-99-0063, Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced (← links)
- RC-99-0055, Special Rept:On 990302,Meteorological Site Number One 10 Meter Temp Element (RTD) Was Declared Inoperable Due to Erratic Operation.Cause of Original RTD Failure Is Unknown. Equipment Was Declared Operable on 990312 (← links)
- RC-97-0251, Special Rept (Spr 970002):on 971111, a EDG Declared Inoperable After Oscillations Occurred During Performance of Monthly Surveillance Test.Erratic Fuel Rack Movement Continued After Engine Unloaded (← links)
- RC-98-0014, Special Rept (Spr 970003):on 971230,declared a EDG Inoperable Due to Frequency Oscillations.Developed & Implemented Troubleshooting Plan on Electronic Governor Control Unit & Mechanical Speed Control Governor Unit (← links)
- RC-98-0223, Special Rept 98-001:on 981130,steam Line High Range Gamma Monitor (RMG-19C) Was Declared Inoperable Due to Indeterminate Alarm.Caused by Failures in Detector & Meter Reset Circuitry.Established Preplanned Alternate Method (← links)
- RC-96-0138, Special Rept:On 960425,fire Door DRIB/310 Inoperable for More than 7 Days.Caused by High Energy Electrical Arc When Speed Switch on Operating Pump Opened.New Door Ordered & Fire Barrier Will Be Restored within Week of Door Arrival (← links)
- RC-96-0150, Rev 1 to Special Rept Spr 960004,including Info Re Imperfection in SG B,For ISI Activity Completed on 960429 (← links)
- RC-96-0152, Special Rept (Spr 960005):on 960512,Channel B EFW Flow Indications for Accident Monitoring Declared Inoperable Due to Incorrect Calibr Range for Flow Transmitters.Replacement Transmitters Not Arrive on Site Until Aug 1996 (← links)
- RC-95-0313, Special Rept Spr 950003:on 951121,noted That Hydrostatic Pressure Testing & Flow Verifications Had Not Been Conducted for Test Performed in 1991 & 1994.Changed Task Description on Surveillance Task Sheet (← links)
- RC-95-0288, Suppl 1 to Special Rept Spr 94-005 Submitted on 940718 Re Inoperability of Main Plant Vent High Range Process Monitor RMA-13 Due to Spiking & Spurious Alarms.Installed Weather Shield Over Opening of Detector Housing (← links)
- RC-95-0275, Special Rept Spr 950002:on 951013,main Steam Radiation monitor,RMG-19B,declared Inoperable Due to Spiking Above High Radiation Setpoint Four Times within Thirty Minutes (← links)
- RC-95-0208, Special Rept (Spr 950001):on 950627,portion of Fire Svc Computer Sys Placed in by-pass to Isolate Malfunction.Hourly Fire Watch Patrol Began Insp of Affected Zone within One H After Placing Computer in by-pass,as Required (← links)
- RC-94-0182, Special Rept Spr 94-005:on 940705,main Plant Vent High Range Radiation Monitor Declared Inoperable Due to Spiking & Spurious Alarms.Established Preplanned Alternate Method of Monitoring Appropriate Parameters (← links)