ML11235A906: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: OFFICIAL USE | {{#Wiki_filter:OFFICIAL USE ONL | ||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE | Y - SECURITY-RELATED INFORMATION | ||
M. Hay, RIV cc w/o encl: Distribution via ListServ | UNITED STATES | ||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | NUCLEAR REGULATORY COMMISSION | ||
REGION III | |||
2443 WARRENVILLE ROAD, SUITE 210 | |||
LISLE, IL 60532 | |||
-4352 OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
August 23, 2011 | |||
Mr. Timothy | |||
J. O'Connor | |||
Site Vice President | |||
Monticello Nuclear Generating Plant | |||
Northern States Power Company, Minnesota | |||
2807 West County Road 75 | |||
Monticello, MN 55362 | |||
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT | |||
TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000 263/201 1-4 08(DRS) Dear Mr. O'Connor: On July 15, 2011 , the U.S. Nuclear Regulatory Commission (NRC) completed a triennial fire protection inspection at your Monticello Nuclear Generating Plant. The enclosed inspection report documents the inspection results, which were discussed on July 15, 2011, with you and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to your preparedness to handle large fires or explosions by verifying you continue to meet the requirements of your B.5.b license condition and Title | |||
10, Code of Federal Regulations | |||
(CFR) Part 50.54 (hh)(2). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
Based on the results of this inspection, one | |||
NRC-identified finding of very low safety significance was identified. The finding involved a violation of NRC requirements. The finding did have a cross | |||
-cutting aspect in the area of Human Performance within the resources component because the licensee did not develop and provide accurate procedures. However, because of the very low safety significance, and because the issue was entered into | |||
your corrective action program, the NRC is treating th | |||
e issue as a Non-Cited Violation | |||
(NCV) in accordance with Section | |||
2.3.2 of the NRC Enforcement Policy. | |||
If you contest the subject or severity of th | |||
is NCV, you should provide a response within 30 | |||
days of the date of this inspection report, with the basis for your denial, to the U.S. | |||
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with | |||
a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission | |||
- Region III, 2443 Warrenville Road, Suite | |||
210, Lisle, IL 60532 | |||
-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector | |||
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. | |||
OFFICIAL USE | |||
ONLY - SECURITY-RELATED INFORMATION | |||
OFFICIAL USE ONL | |||
Y - SECURITY-RELATED INFORMATION | |||
T. O'Connor -2- Office at the Monticello Nuclear Generating Plant. In addition, if you disagree with the cross | |||
-cutting aspect assigned to any finding in this report, you should provide a response withi n 30 days of the date of this inspection report, with the basis for your disagreement, to the | |||
Regional Administrator, Region | |||
III, and the NRC Resident Inspector at the Monticello Nuclear Generating Plant | |||
. In accordance with 10 | |||
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, /RA/ Robert C. Daley, Chief | |||
Engineering Branch 3 | |||
Division of Reactor Safety | |||
Docket No. 50 | |||
-263 License No. DPR-22 Nonpublic Enclosure | |||
: Inspection Report 05000263/2011008(DRS) | |||
w/Attachment: Supplemental Information | |||
cc w/encl: | |||
S. Coker, NSIR/DSO/DDSO/ST | |||
C. Johnson, NSIR | |||
J. Trapp, Region I | |||
M. Ernstes, RII | |||
M. Hay, RIV | |||
cc w/o encl: Distribution via ListServ | |||
OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
OFFICIAL USE ONL | |||
Y - SECURITY-RELATED INFORMATION | |||
T. O'Connor -2- Office at the Monticello Nuclear Generating Plant. In addition, if you disagree with the cross | |||
-cutting aspect assigned to any finding in this report, you should provide a response within 30 | |||
days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region | |||
III, and the NRC Resident Inspector at the Monticello Nuclear Generating Plant. | |||
In accordance with 10 | |||
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | /RA/ | ||
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 Nonpublic Enclosure: Inspection Report 05000263/2011008(DRS) | Robert C. Daley, Chief | ||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | Engineering Branch 3 | ||
Division of Reactor Safety | |||
Docket No. 50 | |||
-263 License No. DPR | |||
-22 Nonpublic Enclosure | |||
: Inspection Report 05000263/2011008(DRS) | |||
w/Attachment: Supplemental Information | |||
cc w/encl: | |||
S. Coker, NSIR/DSO/DDSO/ST | |||
C. Johnson, NSIR | |||
J. Trapp, Region I | |||
M. Ernstes, RII | |||
M. Hay, RIV | |||
cc w/o encl: | |||
Distribution via ListServ | |||
DISTRIBUTION | |||
: See next page | |||
DOCUMENT NAME: | |||
G:\DRSIII\DRS\Work in Progress | |||
\-MONT 2011 408 OUO | |||
--Cover Letter GMH.docx | |||
-Publicly Available | |||
Sensitive -Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | |||
OFFICE RIII RIII NAME DSzwarc for GMHausman:ls | |||
RDaley DATE 08/23/11 08/23/11 OFFICIAL RECORD COPY | |||
OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
Letter to Mr. Timothy J. O'Connor from Mr. Robert C. Daley dated August | |||
23, 2011. SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT | |||
TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000 263/201 1 008(DRS) DISTRIBUTION | |||
: Daniel Merzke | |||
RidsNrrDorlLpl3 | |||
-1 Resource | |||
RidsNrrPMMonticello | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Steven Orth | |||
Jared Heck | |||
Allan Barker Carole Ariano | |||
Linda Linn | |||
DRPIII DRSIII Patricia Buckley | |||
Tammy Tomczak | |||
ROPreports Resource | |||
}} | }} |
Revision as of 11:09, 3 August 2018
ML11235A906 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 08/23/2011 |
From: | Daley R C Engineering Branch 3 |
To: | O'Connor T Northern States Power Co |
References | |
IR-11-408 | |
Download: ML11235A906 (4) | |
See also: IR 05000263/2011408
Text
OFFICIAL USE ONL
Y - SECURITY-RELATED INFORMATION
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532
-4352 OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
August 23, 2011
Mr. Timothy
J. O'Connor
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000 263/201 1-4 08(DRS) Dear Mr. O'Connor: On July 15, 2011 , the U.S. Nuclear Regulatory Commission (NRC) completed a triennial fire protection inspection at your Monticello Nuclear Generating Plant. The enclosed inspection report documents the inspection results, which were discussed on July 15, 2011, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to your preparedness to handle large fires or explosions by verifying you continue to meet the requirements of your B.5.b license condition and Title
10, Code of Federal Regulations
(CFR) Part 50.54 (hh)(2). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, one
NRC-identified finding of very low safety significance was identified. The finding involved a violation of NRC requirements. The finding did have a cross
-cutting aspect in the area of Human Performance within the resources component because the licensee did not develop and provide accurate procedures. However, because of the very low safety significance, and because the issue was entered into
your corrective action program, the NRC is treating th
e issue as a Non-Cited Violation
(NCV) in accordance with Section
2.3.2 of the NRC Enforcement Policy.
If you contest the subject or severity of th
is NCV, you should provide a response within 30
days of the date of this inspection report, with the basis for your denial, to the U.S.
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with
a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission
- Region III, 2443 Warrenville Road, Suite
210, Lisle, IL 60532
-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled.
OFFICIAL USE
ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONL
Y - SECURITY-RELATED INFORMATION
T. O'Connor -2- Office at the Monticello Nuclear Generating Plant. In addition, if you disagree with the cross
-cutting aspect assigned to any finding in this report, you should provide a response withi n 30 days of the date of this inspection report, with the basis for your disagreement, to the
Regional Administrator, Region
III, and the NRC Resident Inspector at the Monticello Nuclear Generating Plant
. In accordance with 10
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/ Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket No. 50
-263 License No. DPR-22 Nonpublic Enclosure
w/Attachment: Supplemental Information
cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST
C. Johnson, NSIR
J. Trapp, Region I
M. Ernstes, RII
M. Hay, RIV
cc w/o encl: Distribution via ListServ
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
OFFICIAL USE ONL
Y - SECURITY-RELATED INFORMATION
T. O'Connor -2- Office at the Monticello Nuclear Generating Plant. In addition, if you disagree with the cross
-cutting aspect assigned to any finding in this report, you should provide a response within 30
days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region
III, and the NRC Resident Inspector at the Monticello Nuclear Generating Plant.
In accordance with 10
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket No. 50
-263 License No. DPR
-22 Nonpublic Enclosure
w/Attachment: Supplemental Information
cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST
C. Johnson, NSIR
J. Trapp, Region I
M. Ernstes, RII
M. Hay, RIV
cc w/o encl:
Distribution via ListServ
DISTRIBUTION
- See next page
DOCUMENT NAME:
G:\DRSIII\DRS\Work in Progress
\-MONT 2011 408 OUO
--Cover Letter GMH.docx
-Publicly Available
Sensitive -Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII NAME DSzwarc for GMHausman:ls
RDaley DATE 08/23/11 08/23/11 OFFICIAL RECORD COPY
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
Letter to Mr. Timothy J. O'Connor from Mr. Robert C. Daley dated August
23, 2011. SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000 263/201 1 008(DRS) DISTRIBUTION
RidsNrrDorlLpl3
-1 Resource
RidsNrrPMMonticello
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII DRSIII Patricia Buckley
ROPreports Resource