SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 20, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING THE ANNUAL UPDATE DATED AUGUST 17, 2015, TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)  
 
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 20, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING THE ANNUAL UPDATE DATED AUGUST 17, 2015, TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)  


The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on August 20, 2015, to discuss and clarify the applicant's annual update to the license renewal application, particularly with regards to the aging management of electrical cable penetration components.  
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on August 20, 2015, to discuss and clarify the applicant's annual update to the license renewal application, particularly with regards to the aging management of electrical cable penetration components.  
Line 33: Line 35:
The applicant had an opportunity to comment on this summary.  
The applicant had an opportunity to comment on this summary.  


Sincerely,  
Sincerely,  /RA/  Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation  
   /RA/  Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation  


Docket Nos. 50-327 and 50-328  
Docket Nos. 50-327 and 50-328  
Line 45: Line 46:


==SUBJECT:==
==SUBJECT:==
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 20, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING THE ANNUAL UPDATE  DATED AUGUST 17, 2015,TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)  
 
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 20, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING THE ANNUAL UPDATE  DATED AUGUST 17, 2015,TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)  


The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on August 20, 2015, to discuss and clarify the applicant's annual update to the license renewal application, particularly with regards to the aging management of electrical cable penetration components.  
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on August 20, 2015, to discuss and clarify the applicant's annual update to the license renewal application, particularly with regards to the aging management of electrical cable penetration components.  
Line 53: Line 56:


Sincerely,  
Sincerely,  
  /RA/        Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328  
  /RA/        Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328  


Line 65: Line 67:


==SUBJECT:==
==SUBJECT:==
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 20, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING THE ANNUAL UPDATE  DATED AUGUST 17, 2015 TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)  
 
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 20, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING THE ANNUAL UPDATE  DATED AUGUST 17, 2015 TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)  


DISTRIBUTION
DISTRIBUTION
Line 83: Line 87:
PARTICIPANTS AFFILIATION Emmanuel Sayoc U.S. Nuclear Regulatory Commission (NRC) Clifford Doutt NRC Dennis Lundy Tennessee Valley Authority (TVA) Don Goodin TVA Dave Mosby Enercon Steve Hale Enercon Roger Rucker Enercon Alan Cox Enercon  
PARTICIPANTS AFFILIATION Emmanuel Sayoc U.S. Nuclear Regulatory Commission (NRC) Clifford Doutt NRC Dennis Lundy Tennessee Valley Authority (TVA) Don Goodin TVA Dave Mosby Enercon Steve Hale Enercon Roger Rucker Enercon Alan Cox Enercon  


ENCLOSURE 2 SUMMARY OF TELEPHONE CONFERENCE CALL SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION AUGUST 20, 2015 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on August 20, 2015, to discuss and clarify the applicant's annual update to the Sequoyah Nuclear Plant, Units 1 and 2 license renewal application (LRA), particularly with regards to the aging management of electrical cable penetration components. In accordance to 10 CFR 54.21(b), TVA submitted the second annual update to the LRA.
ENCLOSURE 2  
 
==SUMMARY==
OF TELEPHONE CONFERENCE CALL SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION AUGUST 20, 2015 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on August 20, 2015, to discuss and clarify the applicant's annual update to the Sequoyah Nuclear Plant, Units 1 and 2 license renewal application (LRA), particularly with regards to the aging management of electrical cable penetration components. In accordance to 10 CFR 54.21(b), TVA submitted the second annual update to the LRA.
As discussed during the telephone conference, penetrations SQN-1-PENE-302-0026-S  and SQN-1-PENE-302-0040-S were removed from the 10 CFR 50.49 environmental qualification (EQ) program as part of a plant modification, as these penetrations do not contain any safety-related electrical equipment and that the sole safety-related function for these penetrations is to maintain containment pressure boundary integrity. Therefore, these penetrations were removed from the EQ program and will continue to be maintained in accordance with the 10 CFR 50 Appendix J leak rate program.  
As discussed during the telephone conference, penetrations SQN-1-PENE-302-0026-S  and SQN-1-PENE-302-0040-S were removed from the 10 CFR 50.49 environmental qualification (EQ) program as part of a plant modification, as these penetrations do not contain any safety-related electrical equipment and that the sole safety-related function for these penetrations is to maintain containment pressure boundary integrity. Therefore, these penetrations were removed from the EQ program and will continue to be maintained in accordance with the 10 CFR 50 Appendix J leak rate program.  



Revision as of 23:27, 8 July 2018

August 20, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and TVA
ML15236A067
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/09/2015
From: Sayoc E C
License Renewal Projects Branch 1
To:
Sayoc E C, NRR, DLR,415-4084
References
TAC MF0481, TAC MF0482
Download: ML15236A067 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 9, 2015

LICENSEE: Tennessee Valley Authority

FACILITY: Sequoyah Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 20, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING THE ANNUAL UPDATE DATED AUGUST 17, 2015, TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on August 20, 2015, to discuss and clarify the applicant's annual update to the license renewal application, particularly with regards to the aging management of electrical cable penetration components.

provides a listing of the participants and Enclosure 2 contains a brief description clarification items during the call.

The applicant had an opportunity to comment on this summary.

Sincerely, /RA/ Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation

Docket Nos. 50-327 and 50-328

Enclosures:

1. List of Participants
2. Summary of Telephone Conference Call

cc: Listserv September 9, 2015 LICENSEE: Tennessee Valley Authority FACILITY: Sequoyah Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 20, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING THE ANNUAL UPDATE DATED AUGUST 17, 2015,TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on August 20, 2015, to discuss and clarify the applicant's annual update to the license renewal application, particularly with regards to the aging management of electrical cable penetration components.

provides a listing of the participants and Enclosure 2 contains a brief description clarification items during the call.

The applicant had an opportunity to comment on this summary.

Sincerely,

/RA/ Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328

Enclosures:

1. List of Participants
2. Summary of Telephone Conference Call cc: Listserv

DISTRIBUTION: See next page ADAMS Accession Number: ML15236A067

  • Concurred via e-mail OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR PM
RPB1:DLR NAME YEdmonds ESayoc YDiaz-Sanabria ESayoc DATE 9/ 01 /15 9/ 08 /15 9/ 08 /15 9/ 09 /15 OFFICIAL RECORD COPY

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 20, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING THE ANNUAL UPDATE DATED AUGUST 17, 2015 TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)

DISTRIBUTION

HARD COPY:

DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource

RidsNrrDlrRpb1 Resource

RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource


A. Boland, NRR/DORL/DIR

J. Trapp, NRR/DORL/ADDIR J. Danna, NRR/DLR/RPB2 E. Sayoc, NRR/DLR/RPB1 D. Drucker, NRR/DLR/RPB2 S. Helton, NRR/DORL/LPL2-2 A. Hon, NRR/DORL/LPL2-2 A. Gody, RII/DRS/DIR S. Walker, RII/DRS/EB3 A. Blamey, RII/DRP/RPB6 G. Smith, RII/DRP/RPB6 W. Deschaine, RII/DRP/RPB6 J. Pelchat, RII/Sr Regional Gov't Liaison Officer E. Lea, RII/Regional Gov't Liaison Officer D. Decker, OCA R. Hannah, OPA/PA-RII J. Ledford, OPA/

ENCLOSURE 1 TELEPHONE CONFERENCE CALL SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 20, 2015

PARTICIPANTS AFFILIATION Emmanuel Sayoc U.S. Nuclear Regulatory Commission (NRC) Clifford Doutt NRC Dennis Lundy Tennessee Valley Authority (TVA) Don Goodin TVA Dave Mosby Enercon Steve Hale Enercon Roger Rucker Enercon Alan Cox Enercon

ENCLOSURE 2

SUMMARY

OF TELEPHONE CONFERENCE CALL SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION AUGUST 20, 2015 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on August 20, 2015, to discuss and clarify the applicant's annual update to the Sequoyah Nuclear Plant, Units 1 and 2 license renewal application (LRA), particularly with regards to the aging management of electrical cable penetration components. In accordance to 10 CFR 54.21(b), TVA submitted the second annual update to the LRA.

As discussed during the telephone conference, penetrations SQN-1-PENE-302-0026-S and SQN-1-PENE-302-0040-S were removed from the 10 CFR 50.49 environmental qualification (EQ) program as part of a plant modification, as these penetrations do not contain any safety-related electrical equipment and that the sole safety-related function for these penetrations is to maintain containment pressure boundary integrity. Therefore, these penetrations were removed from the EQ program and will continue to be maintained in accordance with the 10 CFR 50 Appendix J leak rate program.

The LRA was revised to note that penetrations SQN-1-PENE-302-0026-S and SQN-1-PENE-302-0040-S are not within the scope of the EQ program and to clarify how aging effects are managed for these two penetrations.

During the telephone conference call the following key clarifications were made:

1) Insulated cables, connections in non-EQ penetrations including SQN-1-PENE-302-0026-S and SQN-1-PENE-302--0040-S continue to be within the scope of license renewal and are subject to AMR as identified in Table 2.5-1. The AMR results are reported in Table 3.6.2. 2) GALL Report AMP XI.E1 (non-EQ Insulated Cables and Connections) is the referenced GALL Report aging management program (AMP) (insulated cable and connection commodity group). 3) GALL Report AMP XI.E1 - non-EQ penetration electrical equipment (insulated cable and connections) are evaluated under this AMP. Accessible insulated cable and connection are inspected and also represent, with reasonable assurance, the inaccessible portion of the non-EQ penetration insulated cable and connections located in an adverse localized environment. 4) TVA agreed to Revise Section 2.5 to reflect the above clarifications.