ML20073B082: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:I' Memng N
{{#Wiki_filter:I' Memng N Alabama Power Company 600 North 18th street Post Office Box 2641 Bermingham, Alabama 35291 '
* Alabama Power Company 600 North 18th street Post Office Box 2641 Bermingham, Alabama 35291 '
' Telephone 205 783-6081 F. L Clayton, Jr.
            ' Telephone 205 783-6081 F. L Clayton, Jr.
Sensor Vice President ggg gp Flintndge Buildsng the sonshorn L*xtnc systent April 5,1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
Sensor Vice President Flintndge Buildsng ggg gp the sonshorn L*xtnc systent April 5,1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:         Mr. S. A. Varga Joseph M. Ferley Nuclear Plant - Units l' and 2 Licensing Items Requesting NRC Approval Gentlemen:
20555 Attention:
Mr. S. A. Varga Joseph M. Ferley Nuclear Plant - Units l' and 2 Licensing Items Requesting NRC Approval Gentlemen:
Attached for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13,-1983.
Attached for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13,-1983.
This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval.
This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval.
If you have any questions, please advise.
If you have any questions, please advise.
Yours very truly,
Yours very truly,
                                                        . L. Clayto , Jr. !
. L. Clayto, Jr.
FLCJ r/GGY:lsh-D39 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. ' J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. - B radford I
FLCJ r/GGY:lsh-D39 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. ' J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. - B radford I
      $7kEIo P-j                                                         [,
$7kEIo j
[,
P-


i ATTA09 W                             Page 1 STA1US F LICD611E ITB6 IEllllRIE MC APm0R AFRII. 5,191B 1
i ATTA09 W Page 1 STA1US F LICD611E ITB6 IEllllRIE MC APm0R AFRII. 5,191B FROPOSED ACRM.
FROPOSED     ACRM. EQf_ SLID AFCo         AFCo       IRC SIDETTAL     SIMITTAL APIRO R     ACIUt. IRC       TAC ITEM                         MIE         - MIE       MTE     APIRD R IRTE     10.
EQf_ SLID AFCo AFCo IRC SIDETTAL SIMITTAL APIRO R ACIUt. IRC TAC ITEM MIE
: 1. Movable Contml Rod Assenblies for     02-22-10     03-04-83   09-01-83               49951 FiP 1 and 2 (T.S. 3/4.1.3)                                                           49952
- MIE MTE APIRD R IRTE 10.
: 2. Charcoal Filters for FfP i and 2       03-01-83     03-04-83   09-01-83               49953 (T.S.4.7.7,4.7.8ard4.9.14)                                                           49954
: 1. Movable Contml Rod Assenblies for 02-22-10 03-04-83 09-01-83 49951 FiP 1 and 2 (T.S. 3/4.1.3) 49952
: 3. Rier Water Systan for FNP 1 ard 2       N/A       12-30-82   07-01-83               49374 (T.S.3/4.7.5)                                                                       49375
: 2. Charcoal Filters for FfP i and 2 03-01-83 03-04-83 09-01-83 49953 (T.S.4.7.7,4.7.8ard4.9.14) 49954
: 4. Diesel Generator Owrload Test for       N/A       08-03-82   07-01 4               49374 FNP 1 ard 2 (T.S. 4.8.1.1.2.c.5)                   12-30-82                         49375
: 3. Rier Water Systan for FNP 1 ard 2 N/A 12-30-82 07-01-83 49374 (T.S.3/4.7.5) 49375
: 5. BIT Reduction for FfP 1 and 2           N/A       12-30-82   03-31-83 03-15-83     N/A (T.S.3/4.5.4)                                     03-04-83 03-18 4
: 4. Diesel Generator Owrload Test for N/A 08-03-82 07-01 4 49374 FNP 1 ard 2 (T.S. 4.8.1.1.2.c.5) 12-30-82 49375
: 6. Turtire Valm Surveillance for FNP 2     N/A       10-08-82   12-01-82 tRC letter   48973 (T.S.3/4.3.4)                                     12-10-82             of 12-30-82 01-18-83             stated that myiev will take one year. APCo appeal under tRC con-sideration.
: 5. BIT Reduction for FfP 1 and 2 N/A 12-30-82 03-31-83 03-15-83 N/A (T.S.3/4.5.4) 03-04-83 03-18 4
: 7. RCS Pmssum Isolation Valms               N/A       08-10-82   07-01-EG               48714 for Fif 1 ard 2 (T.S. 3/4.4.7.2                   12-23-82                         48715 ard 3/4.4.7.3)
: 6. Turtire Valm Surveillance for FNP 2 N/A 10-08-82 12-01-82 tRC letter 48973 (T.S.3/4.3.4) 12-10-82 of 12-30-82 01-18-83 stated that myiev will take one year. APCo appeal under tRC con-sideration.
: 8. Mechanical Srubber Functional Test       N/A       11-05-82   12-01-82 01-31-(B     N/A Exmption for FfP 1 (T.S.4.7.9.e)
: 7. RCS Pmssum Isolation Valms N/A 08-10-82 07-01-EG 48714 for Fif 1 ard 2 (T.S. 3/4.4.7.2 12-23-82 48715 ard 3/4.4.7.3)
: 9. Waste Gas Hydmgen/0xygen Analyzer     06-01-10               12-01-83 for FNP 1 and 2 (T.S. Table 4.3-9) 10   ISI/IST Licersing Pmgram
: 8. Mechanical Srubber Functional Test N/A 11-05-82 12-01-82 01-31-(B N/A Exmption for FfP 1 (T.S.4.7.9.e)
: 9. Waste Gas Hydmgen/0xygen Analyzer 06-01-10 12-01-83 for FNP 1 and 2 (T.S. Table 4.3-9) 10 ISI/IST Licersing Pmgram
: a. Unit 1 Irservice Irspection (ISI)
: a. Unit 1 Irservice Irspection (ISI)
Pmgram for ASW Code Class 1, 2 ard 3 Capomnts
Pmgram for ASW Code Class 1, 2 ard 3 Capomnts
: 1. Relief Requests on essel       N/A       04-17-81   09-01-83               48559 cladding examinatiors                     01-10-83
: 1. Relief Requests on essel N/A 04-17-81 09-01-83 48559 cladding examinatiors 01-10-83
                                                                                                      \
\\


          =
=
ATTAD M Nf                               Pap 2 STATUS & LI&MSIIG ITD6 EIllRIIG nC ArnowL AFRIL 5,1983 PH0 POSED     ACIWL       EI)ESTED APCo         Nto           nc SIMITTAL     SIMITTAL     APPROWL       ACTIML MC     TAC ITIM                         MTE           MTE         MTE         APFR0mL MTE   10.
ATTAD M Nf Pap 2 STATUS & LI&MSIIG ITD6 EIllRIIG nC ArnowL AFRIL 5,1983 PH0 POSED ACIWL EI)ESTED APCo Nto nc SIMITTAL SIMITTAL APPROWL ACTIML MC TAC ITIM MTE MTE MTE APFR0mL MTE 10.
: 2. Relief Requests on hdm-       01-18-83     28-83     09-01-83                 49547 static test requirurents
: 2. Relief Requests on hdm-01-18-83 28-83 09-01-83 49547 static test requirurents
: b. Unit 2 Imervice Impection (ISI) Pmgram for A9E Code Class 1, 2 and 3 Cmponents l             1. Revision 0 Relief Requests         N/A     07-25 4     09-01-83
: b. Unit 2 Imervice Impection (ISI) Pmgram for A9E Code Class 1, 2 and 3 Cmponents l
: 2. Relief Requests on wssel           N/A     01-10-83     09-01-83                 49373 cladding examimtiom
: 1. Revision 0 Relief Requests N/A 07-25 4 09-01-83
: 3. Relief Request on hdmstatic 01-18-83         01-28-83     09-01-83 test requirutents
: 2. Relief Requests on wssel N/A 01-10-83 09-01-83 49373 cladding examimtiom
: c. Unit 1 Imervice Testing (IST) t             Program for AMSE Code Class 1, 2 l             and 3 Corrporents l
: 3. Relief Request on hdmstatic 01-18-83 01-28-83 09-01-83 test requirutents
: 1. Revision 2 Relief Requests         N/A     04-21-80     03-15 4       OVERDlE   11277
: c. Unit 1 Imervice Testing (IST) t Program for AMSE Code Class 1, 2 l
: 2. Revision 3 Relief Requests         N/A     07-16-81     03-15-83     OEDlE     11277
and 3 Corrporents l
: 3. Revision 4 Relief Requests         N/A     10-25-82     03 8     .0 H DLE   11277
: 1. Revision 2 Relief Requests N/A 04-21-80 03-15 4 OVERDlE 11277
: 2. Revision 3 Relief Requests N/A 07-16-81 03-15-83 OEDlE 11277
: 3. Revision 4 Relief Requests N/A 10-25-82 03 8
.0 H DLE 11277
: d. Unit 2 Imervice Testing (IST)
: d. Unit 2 Imervice Testing (IST)
Pmgram for A9E Code Class 1, 2 and 3 Caponents
Pmgram for A9E Code Class 1, 2 and 3 Caponents
: 1. Revision 0 Relief Requests         N/A     03-12-W     02-15-83     OEDlE     47051
: 1. Revision 0 Relief Requests N/A 03-12-W 02-15-83 OEDlE 47051
: 2. Revision 1 Relief Requests         N/A     03-17-82     02-15-83     OEDLE     47051
: 2. Revision 1 Relief Requests N/A 03-17-82 02-15-83 OEDLE 47051
: 3. Revision 2 Relief Requests         N/A     08-06-82     02-15 4       OEDlE     47051
: 3. Revision 2 Relief Requests N/A 08-06-82 02-15 4 OEDlE 47051
: 11. Spent Fuel Pool Storage Additiom             N/A     03-19-82     11 &                 48219 for FNP 1                                                         05-01-83 (revised reed date) l
: 11. Spent Fuel Pool Storage Additiom N/A 03-19-82 11 &
: 12. Charxp 18 Month Interval to Refueling 04-01-83       04-05-83     10-01-83
48219 for FNP 1 05-01-83 (revised reed date) l
: 12. Charxp 18 Month Interval to Refueling 04-01-83 04-05-83 10-01-83


ATTMMENT                                 Page 3 STATUS & LICDtSIE ITD6 IEJJIRIfG E #MOK APRIL 5, 1983 PRWOSED         ACTIE     EQESTE AFCo           #co         tac                                 l SAMITTM.       SAMITTM.   #PIOK         EllK fGC         TAC     l ITIM                       MTE           MTE       MTE       #RO K MTE           10.
ATTMMENT Page 3 STATUS & LICDtSIE ITD6 IEJJIRIfG E #MOK APRIL 5, 1983 PRWOSED ACTIE EQESTE AFCo
: 13. Meteorological Towr Surveillance for 02-01-83         01-24-83   % 01-83 FtP1and2(T.S.3/4.3.3.4) 14   In-Core Thisles for FtP 1 and 2           N/A*         N/A       N/A       N/A             N/A (T.S.3.3.3.2)
#co tac SAMITTM.
SAMITTM.
#PIOK EllK fGC TAC ITIM MTE MTE MTE
#RO K MTE 10.
: 13. Meteorological Towr Surveillance for 02-01-83 01-24-83
% 01-83 FtP1and2(T.S.3/4.3.3.4) 14 In-Core Thisles for FtP 1 and 2 N/A*
N/A N/A N/A N/A (T.S.3.3.3.2)
: 15. Safety Evaluatims for Next Fuel Peloads:
: 15. Safety Evaluatims for Next Fuel Peloads:
: a. Unit I lbflow Pbdification           N/A         08-16-82     tyA         tyA         tyA
: a. Unit I lbflow Pbdification N/A 08-16-82 tyA tyA tyA
: b. Unit 1 Cycle 5                     03-14-83       03-17-83     tyA         N/A         N/A
: b. Unit 1 Cycle 5 03-14-83 03-17-83 tyA N/A N/A
: c. Unit 2 Cycle 318 ftnth Fuel       09-01-83                     tyA         tyA         N/A Cycle
: c. Unit 2 Cycle 318 ftnth Fuel 09-01-83 tyA tyA N/A Cycle
: 16. F4H and Positive tbderator Tmper-       08-01-83                 02-01-84 ature Coefficient
: 16. F4H and Positive tbderator Tmper-08-01-83 02-01-84 ature Coefficient
: 17. Cmtainment Spray                           tyA**         N/A       N/A         N/A         tyA
: 17. Cmtainment Spray tyA**
: 18. Tectnical Specification Optimization       tyA           tyA       N/A         N/A         N/A Rs. tinghouse 0,riers Grtxp
N/A N/A N/A tyA
: 19. Safety Related Battery Changes         04-15-83                 10-15-83
: 18. Tectnical Specification Optimization tyA tyA N/A N/A N/A Rs. tinghouse 0,riers Grtxp
: 20. Rod Swap Test During L w Power         03-01-83       03-01-83     N/A         N/A         N/A Physics Testing
: 19. Safety Related Battery Changes 04-15-83 10-15-83
: 21. Rod Drop Timing During Low Power           tyA*           N/A       tyA         tyA         N/A PhysicsTesting
: 20. Rod Swap Test During L w Power 03-01-83 03-01-83 N/A N/A N/A Physics Testing
: 22. Alto Rod Contml Above 90% Power             N/A       01-11-83   04-01-83     03-24-83       N/A for Unit 2, Cycle 2 and tinit 1,                   09-14-82   12-01-82 Cycle 5
: 21. Rod Drop Timing During Low Power tyA*
: 23. thit 2 Licensing Deletion Anendnent 01-12-83           01-07-83       N/A         N/A         N/A Clarification Letter
N/A tyA tyA N/A PhysicsTesting
: 24. FSAR lbdate                           07-01-83                     tyA         N/A         N/A
: 22. Alto Rod Contml Above 90% Power N/A 01-11-83 04-01-83 03-24-83 N/A for Unit 2, Cycle 2 and tinit 1, 09-14-82 12-01-82 Cycle 5
: 23. thit 2 Licensing Deletion Anendnent 01-12-83 01-07-83 N/A N/A N/A Clarification Letter
: 24. FSAR lbdate 07-01-83 tyA N/A N/A
: 25. Mninistrative Changes
: 25. Mninistrative Changes
: a. Accunulator and ECCS Subsysten     02-01-83       02-01-83 09-01-83                   49184 for FtP 1 and 2 (T.S. 4.5.1.1                                                         49185 (c) and 4.5.2.(a))                                                                   04-16-83
: a. Accunulator and ECCS Subsysten 02-01-83 02-01-83 09-01-83 49184 for FtP 1 and 2 (T.S. 4.5.1.1 49185 (c) and 4.5.2.(a))
04-16-83
* Docunentation of need for this mquest is under preparation.
* Docunentation of need for this mquest is under preparation.
    **APCo has detennined that a change to the Tectnical Specifications on the containment spray prps is not needed at this tine.
**APCo has detennined that a change to the Tectnical Specifications on the containment spray prps is not needed at this tine.
L
L


i ATTACMNT                           Page 4 STATIS (F LICD61E ITBE REQJRIIG mC APmon AFRIL 5,19tB RUEED         /CTIN. ESESTED APCo         NCo       NtC Sl1MITTAL   SAMITTM. APm0WE. ACitML NIC   TAC ITEM                         MTE           MTE       MTE     APHIOK MTE     10.
i ATTACMNT Page 4 STATIS (F LICD61E ITBE REQJRIIG mC APmon AFRIL 5,19tB RUEED
: b. Gereric Letter 82-17 on Audit of       N/A       10-25-82 09 0             49068 Enenyncy Plan for FW 1 and 2                                                   49069 (T.S.6.5.2.8.e)
/CTIN.
: c. Mechanical ard Hydraulic Srubber 06-01-0                   09 8 Lists for FW 1 and Hydraulic Srubber List for FNP 2 (T.S.
ESESTED APCo NCo NtC Sl1MITTAL SAMITTM.
APm0WE.
ACitML NIC TAC ITEM MTE MTE MTE APHIOK MTE 10.
: b. Gereric Letter 82-17 on Audit of N/A 10-25-82 09 0 49068 Enenyncy Plan for FW 1 and 2 49069 (T.S.6.5.2.8.e)
: c. Mechanical ard Hydraulic Srubber 06-01-0 09 8 Lists for FW 1 and Hydraulic Srubber List for FNP 2 (T.S.
Table 3.7-4b)
Table 3.7-4b)
: d. Adrainistratim Changes fo; FW       03-01-83     02-01-0   09 8             49184 1 and 2:                                                                       49185
: d. Adrainistratim Changes fo; FW 03-01-83 02-01-0 09 8 49184 1 and 2:
49185
: 1) Fire Detectors Table 3.3-12
: 1) Fire Detectors Table 3.3-12
: 2) Rm Isolation 4.5.2.d.1
: 2) Rm Isolation 4.5.2.d.1
Line 95: Line 117:
: 5) Service Water Battery 4.8.2.5.2(d)
: 5) Service Water Battery 4.8.2.5.2(d)
: 6) Onynization Chart Fig 2re 6.2-2
: 6) Onynization Chart Fig 2re 6.2-2
        *N/A per iten 3 sutxnittal
*N/A per iten 3 sutxnittal
: e. Unit 2 Pressurizer Semor Table     03-01-83     02-01-83 09 0             49185 (T.S.3.3.3.7)
: e. Unit 2 Pressurizer Semor Table 03-01-83 02-01-83 09 0 49185 (T.S.3.3.3.7)
: f. Unit 1 Refueling Outage Change:     03 8     02-01-83 09-01-83             49184 Contairnent Vert
: f. Unit 1 Refueling Outage Change:
: g. Turtire Building Hydraulic             N/A       12-10-82 09-10-8             49287 Srubbers for FW 2
03 8 02-01-83 09-01-83 49184 Contairnent Vert
: h. Incorporation of Liceming           N/A       11-24-82 09-01-83 Requirererts for FW 2
: g. Turtire Building Hydraulic N/A 12-10-82 09-10-8 49287 Srubbers for FW 2 h.
: 1) FNP 2 Liceme Condition                                                     49479 2.C.(17) - Cortairvent Vert Line
Incorporation of Liceming N/A 11-24-82 09-01-83 Requirererts for FW 2
: 1) FNP 2 Liceme Condition 49479 2.C.(17) - Cortairvent Vert Line
: 2) Mechanical Stubber List for FW 2 (T.S. Table 3.7-4b)
: 2) Mechanical Stubber List for FW 2 (T.S. Table 3.7-4b)
: 3) FW 2 Liceme Condition                                                       48687 2.C.(19)(b) - Cortairnert Owrturrert Prutection
: 3) FW 2 Liceme Condition 48687 2.C.(19)(b) - Cortairnert Owrturrert Prutection
: i. _ Organization Charxp to Offsite     .N/A       11-1 M 2 09-01-83             49184 Maragenert for FW 1 ard 2.                                                     49185 L                                                                                             ]
: i. _ Organization Charxp to Offsite
.N/A 11-1 M 2 09-01-83 49184 Maragenert for FW 1 ard 2.
49185
]
L


ATTA09ENT                           Pay 5 STARE F LICD61tG IT96 IEINIRIIG lac APinown.
ATTA09ENT Pay 5 STARE F LICD61tG IT96 IEINIRIIG lac APinown.
AIRIL 5,1983 ROFQSED       ACilML   IEQESTED Alto         AFCo       pac SllMITTM. SIMITTAL APim0ML   ACRML NtC     TAC ITEM                         MTE         ETE       MIE     APRIDWL MTE   10.
AIRIL 5,1983 ROFQSED ACilML IEQESTED Alto AFCo pac SllMITTM.
: 1. Adninistratie Charrys                 N/A           02 0 09-01-83             49184 49185
SIMITTAL APim0ML ACRML NtC TAC ITEM MTE ETE MIE APRIDWL MTE 10.
: 1. Adninistratie Charrys N/A 02 0 09-01-83 49184 49185
: a. Engineered Safety Actuation Systen Irstruiertation ACTION Statetert 20 Error
: a. Engineered Safety Actuation Systen Irstruiertation ACTION Statetert 20 Error
: b. Security Plan Audit Frequency
: b. Security Plan Audit Frequency
: c. Envirornertal QJalification (FiP 1)
: c. Envirornertal QJalification (FiP 1)
: d. Augterted Law Pcwer Test Program (FNP 2) 1}}
: d. Augterted Law Pcwer Test Program (FNP 2) 1}}

Latest revision as of 04:06, 15 December 2024

Forwards Status of All Licensing Items Identified in Util .Status Provided on Monthly Basis & Updated to Include Any Addl Submittals Requesting NRC Approval
ML20073B082
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/05/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8304110939
Download: ML20073B082 (6)


Text

I' Memng N Alabama Power Company 600 North 18th street Post Office Box 2641 Bermingham, Alabama 35291 '

' Telephone 205 783-6081 F. L Clayton, Jr.

Sensor Vice President ggg gp Flintndge Buildsng the sonshorn L*xtnc systent April 5,1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. S. A. Varga Joseph M. Ferley Nuclear Plant - Units l' and 2 Licensing Items Requesting NRC Approval Gentlemen:

Attached for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13,-1983.

This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval.

If you have any questions, please advise.

Yours very truly,

. L. Clayto, Jr.

FLCJ r/GGY:lsh-D39 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. ' J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. - B radford I

$7kEIo j

[,

P-

i ATTA09 W Page 1 STA1US F LICD611E ITB6 IEllllRIE MC APm0R AFRII. 5,191B FROPOSED ACRM.

EQf_ SLID AFCo AFCo IRC SIDETTAL SIMITTAL APIRO R ACIUt. IRC TAC ITEM MIE

- MIE MTE APIRD R IRTE 10.

1. Movable Contml Rod Assenblies for 02-22-10 03-04-83 09-01-83 49951 FiP 1 and 2 (T.S. 3/4.1.3) 49952
2. Charcoal Filters for FfP i and 2 03-01-83 03-04-83 09-01-83 49953 (T.S.4.7.7,4.7.8ard4.9.14) 49954
3. Rier Water Systan for FNP 1 ard 2 N/A 12-30-82 07-01-83 49374 (T.S.3/4.7.5) 49375
4. Diesel Generator Owrload Test for N/A 08-03-82 07-01 4 49374 FNP 1 ard 2 (T.S. 4.8.1.1.2.c.5) 12-30-82 49375
5. BIT Reduction for FfP 1 and 2 N/A 12-30-82 03-31-83 03-15-83 N/A (T.S.3/4.5.4) 03-04-83 03-18 4
6. Turtire Valm Surveillance for FNP 2 N/A 10-08-82 12-01-82 tRC letter 48973 (T.S.3/4.3.4) 12-10-82 of 12-30-82 01-18-83 stated that myiev will take one year. APCo appeal under tRC con-sideration.
7. RCS Pmssum Isolation Valms N/A 08-10-82 07-01-EG 48714 for Fif 1 ard 2 (T.S. 3/4.4.7.2 12-23-82 48715 ard 3/4.4.7.3)
8. Mechanical Srubber Functional Test N/A 11-05-82 12-01-82 01-31-(B N/A Exmption for FfP 1 (T.S.4.7.9.e)
9. Waste Gas Hydmgen/0xygen Analyzer 06-01-10 12-01-83 for FNP 1 and 2 (T.S. Table 4.3-9) 10 ISI/IST Licersing Pmgram
a. Unit 1 Irservice Irspection (ISI)

Pmgram for ASW Code Class 1, 2 ard 3 Capomnts

1. Relief Requests on essel N/A 04-17-81 09-01-83 48559 cladding examinatiors 01-10-83

\\

=

ATTAD M Nf Pap 2 STATUS & LI&MSIIG ITD6 EIllRIIG nC ArnowL AFRIL 5,1983 PH0 POSED ACIWL EI)ESTED APCo Nto nc SIMITTAL SIMITTAL APPROWL ACTIML MC TAC ITIM MTE MTE MTE APFR0mL MTE 10.

2. Relief Requests on hdm-01-18-83 28-83 09-01-83 49547 static test requirurents
b. Unit 2 Imervice Impection (ISI) Pmgram for A9E Code Class 1, 2 and 3 Cmponents l
1. Revision 0 Relief Requests N/A 07-25 4 09-01-83
2. Relief Requests on wssel N/A 01-10-83 09-01-83 49373 cladding examimtiom
3. Relief Request on hdmstatic 01-18-83 01-28-83 09-01-83 test requirutents
c. Unit 1 Imervice Testing (IST) t Program for AMSE Code Class 1, 2 l

and 3 Corrporents l

1. Revision 2 Relief Requests N/A 04-21-80 03-15 4 OVERDlE 11277
2. Revision 3 Relief Requests N/A 07-16-81 03-15-83 OEDlE 11277
3. Revision 4 Relief Requests N/A 10-25-82 03 8

.0 H DLE 11277

d. Unit 2 Imervice Testing (IST)

Pmgram for A9E Code Class 1, 2 and 3 Caponents

1. Revision 0 Relief Requests N/A 03-12-W 02-15-83 OEDlE 47051
2. Revision 1 Relief Requests N/A 03-17-82 02-15-83 OEDLE 47051
3. Revision 2 Relief Requests N/A 08-06-82 02-15 4 OEDlE 47051
11. Spent Fuel Pool Storage Additiom N/A 03-19-82 11 &

48219 for FNP 1 05-01-83 (revised reed date) l

12. Charxp 18 Month Interval to Refueling 04-01-83 04-05-83 10-01-83

ATTMMENT Page 3 STATUS & LICDtSIE ITD6 IEJJIRIfG E #MOK APRIL 5, 1983 PRWOSED ACTIE EQESTE AFCo

  1. co tac SAMITTM.

SAMITTM.

  1. PIOK EllK fGC TAC ITIM MTE MTE MTE
  1. RO K MTE 10.
13. Meteorological Towr Surveillance for 02-01-83 01-24-83

% 01-83 FtP1and2(T.S.3/4.3.3.4) 14 In-Core Thisles for FtP 1 and 2 N/A*

N/A N/A N/A N/A (T.S.3.3.3.2)

15. Safety Evaluatims for Next Fuel Peloads:
a. Unit I lbflow Pbdification N/A 08-16-82 tyA tyA tyA
b. Unit 1 Cycle 5 03-14-83 03-17-83 tyA N/A N/A
c. Unit 2 Cycle 318 ftnth Fuel 09-01-83 tyA tyA N/A Cycle
16. F4H and Positive tbderator Tmper-08-01-83 02-01-84 ature Coefficient
17. Cmtainment Spray tyA**

N/A N/A N/A tyA

18. Tectnical Specification Optimization tyA tyA N/A N/A N/A Rs. tinghouse 0,riers Grtxp
19. Safety Related Battery Changes 04-15-83 10-15-83
20. Rod Swap Test During L w Power 03-01-83 03-01-83 N/A N/A N/A Physics Testing
21. Rod Drop Timing During Low Power tyA*

N/A tyA tyA N/A PhysicsTesting

22. Alto Rod Contml Above 90% Power N/A 01-11-83 04-01-83 03-24-83 N/A for Unit 2, Cycle 2 and tinit 1, 09-14-82 12-01-82 Cycle 5
23. thit 2 Licensing Deletion Anendnent 01-12-83 01-07-83 N/A N/A N/A Clarification Letter
24. FSAR lbdate 07-01-83 tyA N/A N/A
25. Mninistrative Changes
a. Accunulator and ECCS Subsysten 02-01-83 02-01-83 09-01-83 49184 for FtP 1 and 2 (T.S. 4.5.1.1 49185 (c) and 4.5.2.(a))

04-16-83

  • Docunentation of need for this mquest is under preparation.
    • APCo has detennined that a change to the Tectnical Specifications on the containment spray prps is not needed at this tine.

L

i ATTACMNT Page 4 STATIS (F LICD61E ITBE REQJRIIG mC APmon AFRIL 5,19tB RUEED

/CTIN.

ESESTED APCo NCo NtC Sl1MITTAL SAMITTM.

APm0WE.

ACitML NIC TAC ITEM MTE MTE MTE APHIOK MTE 10.

b. Gereric Letter 82-17 on Audit of N/A 10-25-82 09 0 49068 Enenyncy Plan for FW 1 and 2 49069 (T.S.6.5.2.8.e)
c. Mechanical ard Hydraulic Srubber 06-01-0 09 8 Lists for FW 1 and Hydraulic Srubber List for FNP 2 (T.S.

Table 3.7-4b)

d. Adrainistratim Changes fo; FW 03-01-83 02-01-0 09 8 49184 1 and 2:

49185

1) Fire Detectors Table 3.3-12
2) Rm Isolation 4.5.2.d.1
3) Riwr Water Sury 3/4.7.5*
4) Yant Fire Hydrant Table 3.7-7
5) Service Water Battery 4.8.2.5.2(d)
6) Onynization Chart Fig 2re 6.2-2
  • N/A per iten 3 sutxnittal
e. Unit 2 Pressurizer Semor Table 03-01-83 02-01-83 09 0 49185 (T.S.3.3.3.7)
f. Unit 1 Refueling Outage Change:

03 8 02-01-83 09-01-83 49184 Contairnent Vert

g. Turtire Building Hydraulic N/A 12-10-82 09-10-8 49287 Srubbers for FW 2 h.

Incorporation of Liceming N/A 11-24-82 09-01-83 Requirererts for FW 2

1) FNP 2 Liceme Condition 49479 2.C.(17) - Cortairvent Vert Line
2) Mechanical Stubber List for FW 2 (T.S. Table 3.7-4b)
3) FW 2 Liceme Condition 48687 2.C.(19)(b) - Cortairnert Owrturrert Prutection
i. _ Organization Charxp to Offsite

.N/A 11-1 M 2 09-01-83 49184 Maragenert for FW 1 ard 2.

49185

]

L

ATTA09ENT Pay 5 STARE F LICD61tG IT96 IEINIRIIG lac APinown.

AIRIL 5,1983 ROFQSED ACilML IEQESTED Alto AFCo pac SllMITTM.

SIMITTAL APim0ML ACRML NtC TAC ITEM MTE ETE MIE APRIDWL MTE 10.

1. Adninistratie Charrys N/A 02 0 09-01-83 49184 49185
a. Engineered Safety Actuation Systen Irstruiertation ACTION Statetert 20 Error
b. Security Plan Audit Frequency
c. Envirornertal QJalification (FiP 1)
d. Augterted Law Pcwer Test Program (FNP 2) 1