| event date = 09/06/2003 11:51 EDT
| event date = 09/06/2003 11:51 EDT
| last update date = 09/06/2003
| last update date = 09/06/2003
| title = Hpci Declared Inoperable Due To Loss Of The 480V Bus.
| title = Hpci Declared Inoperable Due to Loss of the 480V Bus.
| event text = While operating at 100% power, the plant sustained a loss of the 480 bus "B1".  As a result of the loss of power, HPCI has been isolated due to the inability to auto isolate on a primary containment isolation signal.  The SBGT was initiated to restore building ventilation.  The Reactor Water Clean Up System was manually isolated due to the loss of power.  The "A" recirculation pump tripped as a result of the loss of power.  The loss of the 480V bus is being investigated at this time.
| event text = While operating at 100% power, the plant sustained a loss of the 480 bus "B1".  As a result of the loss of power, HPCI has been isolated due to the inability to auto isolate on a primary containment isolation signal.  The SBGT was initiated to restore building ventilation.  The Reactor Water Clean Up System was manually isolated due to the loss of power.  The "A" recirculation pump tripped as a result of the loss of power.  The loss of the 480V bus is being investigated at this time.
The NRC Resident Inspector was notified.
The NRC Resident Inspector was notified.

Latest revision as of 21:25, 1 March 2018

ENS 40138 +/-
Where
Pilgrim
Massachusetts (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Time - Person (Reporting Time:+6.33 h0.264 days <br />0.0377 weeks <br />0.00867 months <br />)
Opened: Mcdonnell
22:11 Sep 6, 2003
NRC Officer: Chauncey Gould
Last Updated: Sep 6, 2003
40138 - NRC Website