| event date = 02/27/2005 11:58 CST
| event date = 02/27/2005 11:58 CST
| last update date = 02/27/2005
| last update date = 02/27/2005
| title = Technical Specification Required Shutdown Due To Loss Of Dc Battery Chargers
| title = Technical Specification Required Shutdown Due to Loss of Dc Battery Chargers
| event text = The following information was provided by the licensee via facsimile:
| event text = The following information was provided by the licensee via facsimile:
A Technical Specification (TS)-required plant shutdown was initiated on Point Beach Unit 2 at 11:58 a.m. CST on February 27, 2005.  The initiation of the unit shutdown was required by TS 3.8.4, Condition 13, due to the Completion Time of TS 3.8.4 Condition A not being met. Both units were operating at 100% power prior to the event.
A Technical Specification (TS)-required plant shutdown was initiated on Point Beach Unit 2 at 11:58 a.m. CST on February 27, 2005.  The initiation of the unit shutdown was required by TS 3.8.4, Condition 13, due to the Completion Time of TS 3.8.4 Condition A not being met. Both units were operating at 100% power prior to the event.

Latest revision as of 21:21, 1 March 2018

ENS 41447 +/-
Where
Point Beach NextEra Energy icon.png
Wisconsin (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-1.48 h-0.0617 days <br />-0.00881 weeks <br />-0.00203 months <br />)
Opened: Jack Gadzala
16:29 Feb 27, 2005
NRC Officer: Bill Huffman
Last Updated: Feb 27, 2005