ENS 46875: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/23/2011 22:00 CDT
| event date = 05/23/2011 22:00 CDT
| last update date = 05/24/2011
| last update date = 05/24/2011
| title = Offsite Notification Due To An Oil Spill
| title = Offsite Notification Due to an Oil Spill
| event text = On May 23, 2011, at 2200 CDT, the station needed to notify the State of Nebraska, Department of Environmental Quality and the National Response Center due to an oil leak from the stations lube oil system.  A quantity of oil spilled into the turbine building basement and an undetermined amount drained to the turbine building sump which discharges to the Missouri River.  Some amount of oil was discharged to the river, which resulted in discoloration and a visible sheen noted on river sampling. Per Fort Calhoun Nuclear Station's National Pollutant Discharge Elimination System (NPDES) permit, the notifications will be made and samples will be taken for off site analysis to determine the quantity discharged involved.  Also, the oil quantity in the turbine building sump (out fall L02) is expected to have exceeded 20 ppm oil and grease which does violate the State NPDES permit NE00000418.
| event text = On May 23, 2011, at 2200 CDT, the station needed to notify the State of Nebraska, Department of Environmental Quality and the National Response Center due to an oil leak from the stations lube oil system.  A quantity of oil spilled into the turbine building basement and an undetermined amount drained to the turbine building sump which discharges to the Missouri River.  Some amount of oil was discharged to the river, which resulted in discoloration and a visible sheen noted on river sampling. Per Fort Calhoun Nuclear Station's National Pollutant Discharge Elimination System (NPDES) permit, the notifications will be made and samples will be taken for off site analysis to determine the quantity discharged involved.  Also, the oil quantity in the turbine building sump (out fall L02) is expected to have exceeded 20 ppm oil and grease which does violate the State NPDES permit NE00000418.
This notification is being made in accordance with 10 CFR 50.72(b)(2)(xi), 4 hour non-emergency notification due to a notifications being made to Government [Agencies] (State of Nebraska, Department of Environmental Quality and the National Response Center).
This notification is being made in accordance with 10 CFR 50.72(b)(2)(xi), 4 hour non-emergency notification due to a notifications being made to Government [Agencies] (State of Nebraska, Department of Environmental Quality and the National Response Center).

Latest revision as of 22:07, 1 March 2018

ENS 46875 +/-
Where
Fort Calhoun Omaha Public Power District icon.png
Nebraska (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-3.32 h-0.138 days <br />-0.0198 weeks <br />-0.00455 months <br />)
Opened: Scott Moeck
23:41 May 23, 2011
NRC Officer: Vince Klco
Last Updated: May 24, 2011
46875 - NRC Website