IR 05000003/2023401: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
== | ==REGION I== | ||
HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, INDIAN POINT ENERGY CENTER UNITS 1, 2, AND 3 - NRC SECURITY DECOMMISSIONING INSPECTION REPORT NOS. 05000003/ | 475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406-1415 | ||
May 10, 2023 | |||
Kelly Trice President HDI Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 | |||
SUBJECT: HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, INDIAN POINT ENERGY CENTER UNITS 1, 2, AND 3 - NRC SECURITY DECOMMISSIONING INSPECTION REPORT NOS. 05000003/2023 401, 05000247/2023 401, | |||
AND 05000286/2023 401 | |||
==Dear Kelly Trice:== | ==Dear Kelly Trice:== | ||
Line 28: | Line 35: | ||
Based on the results of this inspection, no violations were identified. | Based on the results of this inspection, no violations were identified. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC s Rules of Practice, a copy of thi s letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Current NRC regulations and guidance are included on the NRCs website at www.nrc.gov ; | |||
select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC s website at www.nrc.gov ; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under Related Information). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Ke n Hussar at 610- 337-5084 if you have any questions regarding this matter. | |||
Sincerely, Daniel Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security | |||
Docket Nos: 50- 003, 50-247, 50-286 License Nos: DPR-5, DPR-26, DPR-64 | |||
===Enclosure:=== | ===Enclosure:=== | ||
Inspection Report Nos.: 05000003/ | Inspection Report Nos.: 05000003/2023 401, 05000247/2023 401, 05000286/2023 401 | ||
REGION I== | REGION I== | ||
INSPECTION REPORT Docket Nos. 05000003, 05000247, and 05000286 License Nos. DPR-5, DPR-26, and DPR-64 Report Nos. 05000003/ | INSPECTION REPORT | ||
Facility: | |||
Docket Nos. 05000003, 05000247, and 05000286 | |||
License Nos. DPR-5, DPR-26, and DPR-64 | |||
Report Nos. 05000003/2023 401, 05000247/2023 401, and 05000286/2023 401 | |||
Enterprise Identifier: I-2023-401- 0061 | |||
Licensee: Holtec Decommissioning International, LLC (HDI) | |||
Facility: Indian Point Energy Center, Units 1, 2, and 3 | |||
Location: Buchanan, NY. | |||
Inspection Dates: April 17-19, 2023 | |||
Inspectors: Ken Hussar, Senior Physical Security Inspector Tom Eck, Physical Security Inspector | |||
Approved by: Daniel Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security | |||
Enclosure EXECUTIVE | |||
=SUMMARY= | |||
Holtec Decommissioning International, LLC (HDI) Indian Point Energy Center Units 1, 2, and 3 NRC Inspection Report Nos. 05000003/2023 401, | |||
05000247/2023 401, and 05000286/2023 401 | |||
This report covers an announced security decommissioning program core inspection of the physical protection program at the Indian Point Energy Center - Units 1, 2, and 3 performed April 17-19, 2023. The objective of the inspection was to determine if activities involving the physical protection program, associated with the samples inspected, provide assurance that the licensees program is designed and implemented in a manner that protects against the design basis threat (DBT) of radiological sabotage. The U.S. Nuclear Regulatory Commissions (NRCs) oversight of the security of a decommissioning nuclear power reactor is described in Inspection Procedure (IP) 81200, Security. Additionally, for reactors that have permanently shut down and entered decommissioning, violations of regulatory requirements are evaluated using the traditional enforcement process described in the NRCs Enforcement Policy. Under traditional enforcement, violations of more than minor significance are assigned a severity level (SL) ranging from I (most significant) to IV (least significant). | |||
Based on the results of this inspection, no violations were identified. | Based on the results of this inspection, no violations were identified. | ||
Line 51: | Line 82: | ||
=REPORT DETAILS= | =REPORT DETAILS= | ||
Inspection Scope Inspection activities were conducted using the appropriate portions of the IPs in effect at the beginning of the inspection unless otherwise noted. At the time of this inspection, approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2202 Appendix A, Security Core Inspection Program. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | Inspection Scope | ||
Inspection activities were conducted using the appropriate portions of the IPs in effect at the beginning of the inspection unless otherwise noted. | |||
At the time of this inspection, approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2202 Appendix A, Security Core Inspection Program. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | |||
Access Control for Decommissioning Nuclear Power Reactors, IP 81200.02 | Access Control for Decommissioning Nuclear Power Reactors, IP 81200.02 | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors evaluated the access control program through completion of a minimum of 50% of the inspection requirements. The inspectors conducted walk-downs of protected area portals, last access control, and building walls/ceilings/floors that were part of the protected area barrier, observed vehicle searches, personnel searches, and material searches, reviewed security key and core accountabilities, reviewed procedures for implementation of the two-man rule, alarm response, and access controls. | The inspectors evaluated the access control program through completion of a minimum of 50% of the inspection requirements. | ||
The inspectors conducted walk-downs of protected area portals, last access control, and building walls/ceilings/floors that were part of the protected area barrier, observed vehicle searches, personnel searches, and material searches, reviewed security key and core accountabilities, reviewed procedures for implementation of the two-man rule, alarm response, and access controls. | |||
===Access Control for Decommissioning Nuclear Power Reactors (1 Sample)=== | ===Access Control for Decommissioning Nuclear Power Reactors (1 Sample)=== | ||
Line 68: | Line 107: | ||
===2. Access Authorization for Decommissioning Nuclear Power Reactors, IP 81200.01=== | ===2. Access Authorization for Decommissioning Nuclear Power Reactors, IP 81200.01=== | ||
====a. Inspection Scope==== | |||
The inspectors evaluated the access authorization program through completion of a minimum of 50% of the inspection requirements. The inspectors reviewed acc ess authorization procedures, unescorted access personnel files, and interviewed access authorization personnel. | |||
Access Authorization for Decommissioning Nuclear Power Reactors (1 Sample) | |||
02.01 a - g, 02.02 a - l, 02.04 a - d, 02.06. | 02.01 a - g, 02.02 a - l, 02.04 a - d, 02.06. | ||
====b. Observations and Findings==== | ====b. Observations and Findings==== | ||
Inspectors reviewed the physical security plan, implementing procedures, and a representative sample of access authorization personnel files. The inspectors verified through the review of a sample of access authorization personnel files that the licensees access authorization program provides assurance for individuals | Inspectors reviewed the physical security plan, implementing procedures, and a representative sample of access authorization personnel files. The inspectors verified through the review of a sample of access authorization personnel files that the licensees access authorization program provides assurance for individuals gran ted unescorted access and maintains unescorted access, are trustworthy, reliable and do not constitute an unreasonable risk to public health and safety or the common defense and security. | ||
====c. Conclusions==== | ====c. Conclusions==== | ||
The access authorization program at the Indian Point Energy Center, Units 1, 2, and 3, was in accordance with requirements, appropriately developed, and was being effectively implemented in a manner that protects against the DBT of radiological sabotage. No violations were identified. | The access authorization program at the Indian Point Energy Center, Units 1, 2, and 3, was in accordance with requirements, appropriately developed, and was being effectively implemented in a manner that protects against the DBT of radiological sabotage. No violations were identified. | ||
Security Plan Changes for Decommissioning Nuclear Power Reactors, IP 81200.09 | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors evaluated the security plan changes through completion of the following | The inspectors evaluated the security plan changes through completion of the following inspection elements. | ||
===Security Plan Changes for Decommissioning Nuclear Power Reactors (1 Sample)=== | ===Security Plan Changes for Decommissioning Nuclear Power Reactors (1 Sample)=== | ||
Since the last NRC inspection of this program area, Security Plan Revision 27 | Since the last NRC inspection of this program area, Security Plan Revision 27 w as implemented based on Hotecs determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changes continue to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan. | ||
However, this review does not constitute formal NRC approval of the changes. | However, this review does not constitute formal NRC approval of the changes. | ||
Line 100: | Line 139: | ||
===Exit Meeting Summary=== | ===Exit Meeting Summary=== | ||
On April 19, 2023, the inspectors presented the inspection results to Richard Burroni, Site Vice President, and other members of the licensees staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report. | On April 19, 2023, the inspectors presented the inspection results to Richard Burroni, Site Vice President, and other members of the licensees staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report. | ||
Line 108: | Line 146: | ||
==KEY POINTS OF CONTACT== | ==KEY POINTS OF CONTACT== | ||
Personnel | |||
: [[contact::R. Burroni]], Site Vice President | : [[contact::R. Burroni]], Site Vice President | ||
: [[contact::D. Gagnon]], Holtec Fleet Security Director | : [[contact::D. Gagnon]], Holtec Fleet Security Director | ||
: [[contact::J. Swart]], IPEC Security Manager | : [[contact::J. Swart]], IPEC Security Manager | ||
LIST OF ITEMS OPEN, CLOSED, AND DISCUSSED | |||
Opened | |||
OPEN, CLOSED, AND DISCUSSED | None | ||
Opened and Closed | |||
None | None | ||
Closed | |||
None | None | ||
INSPECTION PROCEDURES USED | |||
IP 81200.01, Access Authorization for Decommissioning Nuclear Power Reactors | |||
IP 81200.02, Access Control for Decommissioning Nuclear Power Reactors | |||
IP 81200.09, Security Plan Changes for Decommissioning Power Reactors | |||
==DOCUMENTS REVIEWED== | ==DOCUMENTS REVIEWED== | ||
}} | }} |
Latest revision as of 18:01, 14 November 2024
ML23123A198 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 05/10/2023 |
From: | Daniel Schroeder Decommissioning, ISFSI, and Reactor Health Physics Branch |
To: | Trice K Holtec Decommissioning International |
References | |
IR 2023401 | |
Download: ML23123A198 (1) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406-1415
May 10, 2023
Kelly Trice President HDI Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104
SUBJECT: HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, INDIAN POINT ENERGY CENTER UNITS 1, 2, AND 3 - NRC SECURITY DECOMMISSIONING INSPECTION REPORT NOS. 05000003/2023 401, 05000247/2023 401,
Dear Kelly Trice:
On April 19, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the permanently shut down Indian Point Nuclear Energy Center Units 1, 2, and 3. On-site inspection was performed April 17-19, 2023. The inspection examined activities conducted under your licenses as they relate to security and compliance with the NRCs rules and regulations and with the conditions of your licenses. The inspectors reviewed select procedures and records, observed activities, interviewed site personnel, and performed site walk-downs. The NRC inspectors discussed the results of this inspection with Richard Burroni, Site Vice President, and other members of your staff on April 19, 2023. The results of this inspection are documented in the enclosed report.
Based on the results of this inspection, no violations were identified.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC s Rules of Practice, a copy of thi s letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Current NRC regulations and guidance are included on the NRCs website at www.nrc.gov ;
select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC s website at www.nrc.gov ; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under Related Information). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Ke n Hussar at 610- 337-5084 if you have any questions regarding this matter.
Sincerely, Daniel Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security
Docket Nos: 50- 003, 50-247, 50-286 License Nos: DPR-5, DPR-26, DPR-64
Enclosure:
Inspection Report Nos.: 05000003/2023 401, 05000247/2023 401, 05000286/2023 401
REGION I==
INSPECTION REPORT
Docket Nos. 05000003, 05000247, and 05000286
License Nos. DPR-5, DPR-26, and DPR-64
Report Nos. 05000003/2023 401, 05000247/2023 401, and 05000286/2023 401
Enterprise Identifier: I-2023-401- 0061
Licensee: Holtec Decommissioning International, LLC (HDI)
Facility: Indian Point Energy Center, Units 1, 2, and 3
Location: Buchanan, NY.
Inspection Dates: April 17-19, 2023
Inspectors: Ken Hussar, Senior Physical Security Inspector Tom Eck, Physical Security Inspector
Approved by: Daniel Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security
Enclosure EXECUTIVE
SUMMARY
Holtec Decommissioning International, LLC (HDI) Indian Point Energy Center Units 1, 2, and 3 NRC Inspection Report Nos. 05000003/2023 401,
05000247/2023 401, and 05000286/2023 401
This report covers an announced security decommissioning program core inspection of the physical protection program at the Indian Point Energy Center - Units 1, 2, and 3 performed April 17-19, 2023. The objective of the inspection was to determine if activities involving the physical protection program, associated with the samples inspected, provide assurance that the licensees program is designed and implemented in a manner that protects against the design basis threat (DBT) of radiological sabotage. The U.S. Nuclear Regulatory Commissions (NRCs) oversight of the security of a decommissioning nuclear power reactor is described in Inspection Procedure (IP) 81200, Security. Additionally, for reactors that have permanently shut down and entered decommissioning, violations of regulatory requirements are evaluated using the traditional enforcement process described in the NRCs Enforcement Policy. Under traditional enforcement, violations of more than minor significance are assigned a severity level (SL) ranging from I (most significant) to IV (least significant).
Based on the results of this inspection, no violations were identified.
REPORT DETAILS
Inspection Scope
Inspection activities were conducted using the appropriate portions of the IPs in effect at the beginning of the inspection unless otherwise noted.
At the time of this inspection, approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2202 Appendix A, Security Core Inspection Program.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Access Control for Decommissioning Nuclear Power Reactors, IP 81200.02
a. Inspection Scope
The inspectors evaluated the access control program through completion of a minimum of 50% of the inspection requirements.
The inspectors conducted walk-downs of protected area portals, last access control, and building walls/ceilings/floors that were part of the protected area barrier, observed vehicle searches, personnel searches, and material searches, reviewed security key and core accountabilities, reviewed procedures for implementation of the two-man rule, alarm response, and access controls.
Access Control for Decommissioning Nuclear Power Reactors (1 Sample)
02.01 a - e, 02.02 a - g, i - k, 02.03 a - d, f, h, 02.04 a, b, 02.05
b. Observations and Findings
Inspectors reviewed the physical security plan, implementing procedures, and a representative sample of documentation and records associated with the access control program. The inspectors verified through the review of the licensees access control program that only those personnel, material, and vehicles that have been properly screened are granted access to the Protected Areas and Vital Areas.
c. Conclusions
The access control program at the Indian Point Energy Center, Units 1, 2, and 3, was in accordance with requirements, appropriately developed, and was being effectively implemented in a manner that protects against the DBT of radiological sabotage. No violations were identified.
2. Access Authorization for Decommissioning Nuclear Power Reactors, IP 81200.01
a. Inspection Scope
The inspectors evaluated the access authorization program through completion of a minimum of 50% of the inspection requirements. The inspectors reviewed acc ess authorization procedures, unescorted access personnel files, and interviewed access authorization personnel.
Access Authorization for Decommissioning Nuclear Power Reactors (1 Sample)
02.01 a - g, 02.02 a - l, 02.04 a - d, 02.06.
b. Observations and Findings
Inspectors reviewed the physical security plan, implementing procedures, and a representative sample of access authorization personnel files. The inspectors verified through the review of a sample of access authorization personnel files that the licensees access authorization program provides assurance for individuals gran ted unescorted access and maintains unescorted access, are trustworthy, reliable and do not constitute an unreasonable risk to public health and safety or the common defense and security.
c. Conclusions
The access authorization program at the Indian Point Energy Center, Units 1, 2, and 3, was in accordance with requirements, appropriately developed, and was being effectively implemented in a manner that protects against the DBT of radiological sabotage. No violations were identified.
Security Plan Changes for Decommissioning Nuclear Power Reactors, IP 81200.09
a. Inspection Scope
The inspectors evaluated the security plan changes through completion of the following inspection elements.
Security Plan Changes for Decommissioning Nuclear Power Reactors (1 Sample)
Since the last NRC inspection of this program area, Security Plan Revision 27 w as implemented based on Hotecs determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changes continue to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan.
However, this review does not constitute formal NRC approval of the changes.
Therefore, these changes remain subject to future NRC inspection in their entirety.
b. Observations and Findings
No violations were identified.
c. Conclusions
The Indian Point Energy Center security plan changes did not result in a non-compliance or violation of regulatory requirements, an adverse impact to the licensees ability to detect, assess, interdict, and neutralize an adversarial force to protect against the DBT of radiological sabotage, or a site-specific vulnerability.
Exit Meeting Summary
On April 19, 2023, the inspectors presented the inspection results to Richard Burroni, Site Vice President, and other members of the licensees staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Personnel
- R. Burroni, Site Vice President
- D. Gagnon, Holtec Fleet Security Director
LIST OF ITEMS OPEN, CLOSED, AND DISCUSSED
Opened
None
Opened and Closed
None
Closed
None
INSPECTION PROCEDURES USED
IP 81200.01, Access Authorization for Decommissioning Nuclear Power Reactors
IP 81200.02, Access Control for Decommissioning Nuclear Power Reactors
IP 81200.09, Security Plan Changes for Decommissioning Power Reactors