ML24043A044: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:GE   Hitachi Nuclear                   Energy
{{#Wiki_filter:GE Hitachi Nuclear Energy
* HITACHI Scott     P. Murray Mana                       ger,   Facility Licen sing
* HITACHI Scott P. Murray Mana ger, Facility Licen sing


3901   Ca     stle Hayne                         Road P.O. Bo       x       7 80 M240026                                                                                                                                           W         ilmington               , NC 284 02 USA February                                             12 , 2024                                                                                   T (910)   8 19- 5950 scott . m       u       rray@ge.c               o       m U                 .S   . Nuclear             Regulatory                   Commission Attn: Document                                             Control       Desk Washington                                         , D . C.     20555-001 10 CFR     50.90
3901 Ca stle Hayne Road P.O. Bo x 7 80 M240026 W ilmington, NC 284 02 USA February 12, 2024 T (910) 8 19-5950 scott. m u rray@ge.c o m U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001 10 CFR 50.90


==Subject:==
==Subject:==
GEH     License   Amendment                                       Request   Modification-           Permanent                             Cessation       of the GE Nuclear         Test Reactor               (NTR)     and                         Possession                 Only         Authorization
GEH License Amendment Request Modification-Permanent Cessation of the GE Nuclear Test Reactor (NTR) and Possession Only Authorization


References       :                                         1)                                       NRC     License       R-33,     Docket       0500073,     General       Electric Hitachi (GEH)   Nuclear           Test Reactor                 (NTR)
References : 1) NRC License R-33, Docket 0500073, General Electric Hitachi (GEH) Nuclear Test Reactor (NTR)
: 2)                                     GEH     License   Amendment                                       Request -                     Permanent                             Cessation       of the GE   Nuclear Test Reactor               (NTR)     and                         Possession                 Only         Authorization     , 10/6/23 (ML23279A110)
: 2) GEH License Amendment Request - Permanent Cessation of the GE Nuclear Test Reactor (NTR) and Possession Only Authorization, 10/6/23 (ML23279A110)
: 3)                                     Letter, S. Murray                       (GEH)   to   NRC     Document                                         Control       Desk, "GEH     Response                     to     NRC Request   for Additional Information                             , 12/15/23   (ML23349A047)
: 3) Letter, S. Murray (GEH) to NRC Document Control Desk, "GEH Response to NRC Request for Additional Information, 12/15/23 (ML23349A047)
: 4)                                   GEH/NRC       Possession-Only                           License     Audit Meeting, 2/8/24 GE   Hitachi Nuclear             Energy                 Americas             LLC   (GEH)     is withdrawing   a           commitment                               made                       in           the NTR possession-only                                         license amendment                                               request (Reference         2)     and                       offers this explanation                                 .
: 4) GEH/NRC Possession-Only License Audit Meeting, 2/8/24 GE Hitachi Nuclear Energy Americas LLC (GEH) is withdrawing a commitment made in the NTR possession-only license amendment request (Reference 2) and offers this explanation.
In             paragraph                         2 , bullet 3, GEH   stated that the control               room                             console                             key           will be             placed         in the off position, removed                   , and                             be               locked       in   a           secured             location                 away                                             from       the facility. This commitment                           was discussed     during     a           meeting   between                       the NRC     and                           GEH     (Reference       4)     as           not             necessary                                 because                                               it will not               be               possible to           start the reactor         or     otherwise affect reactivity in the reactor       from       the console under                 the possession               -only                       license for the following reasons                         :
In paragraph 2, bullet 3, GEH stated that the control room console key will be placed in the off position, removed, and be locked in a secured location away from the facility. This commitment was discussed during a meeting between the NRC and GEH (Reference 4) as not necessary because it will not be possible to start the reactor or otherwise affect reactivity in the reactor from the console under the possession -only license for the following reasons :
: 1.                     Safety   and                         control               rods   will be             fully inserted and                         restrained from         any                                 movement.                                       This is according                               to technical   specifications 3.2 . 1, 4 .2 . 1,       and                           5.3 .1.
: 1. Safety and control rods will be fully inserted and restrained from any movement. This is according to technical specifications 3.2. 1, 4.2. 1, and 5.3.1.
: 2.                           Manual                                 poison                     sheets (MPS)   w         ill be               installed, locked     in           place       , and                     the keys         for the MPS will be removed                   from       the facility.           This is according                                   to   technical   specifications 3.2   .2 , 4 .2 .2 , and                         5.3 . 1.
: 2. Manual poison sheets (MPS) w ill be installed, locked in place, and the keys for the MPS will be removed from the facility. This is according to technical specifications 3.2.2, 4.2.2, and 5.3. 1.
Please proceed             with issuance                       of the amended                                     possession                   only                     license conditions               that GEH   accepted on                         December                                 15 , 2023   (Reference         3)   . Contact                         me             If you                                     have             any                                 questions         or     concerns                                         regarding this request.
Please proceed with issuance of the amended possession only license conditions that GEH accepted on December 15, 2023 (Reference 3). Contact me If you have any questions or concerns regarding this request.
I declare   under                 penalty             of perjury that the foregoing           is true and                         correct.
I declare under penalty of perjury that the foregoing is true and correct.


Sincec ;:=vt m ~
Sincec ;:=vt m ~


s~~ay                                                       , Manager                                                                                                   ~
s~~ay, Manager ~
Facility Licensing
Facility Licensing


cc:                   NRC     Region               IV               Administrator J.       D. Parrott, USNRC/NMSS/DUWP/RDB J . M.       Borromeo,                                   Branch                       Chief, USNRC/NRR/DANU/UNPL G   . A.     Wertz, USNRC/NRR/DANU/UNPL SPM   24-011}}
cc: NRC Region IV Administrator J. D. Parrott, USNRC/NMSS/DUWP/RDB J. M. Borromeo, Branch Chief, USNRC/NRR/DANU/UNPL G. A. Wertz, USNRC/NRR/DANU/UNPL SPM 24-011}}

Latest revision as of 15:19, 5 October 2024

GEH License Amendment Request Modification- Permanent Cessation of the GE Nuclear Test Reactor (Ntr) and Possession Only Authorization
ML24043A044
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 02/12/2024
From: Murray S
GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
M240026
Download: ML24043A044 (1)


Text

GE Hitachi Nuclear Energy

  • HITACHI Scott P. Murray Mana ger, Facility Licen sing

3901 Ca stle Hayne Road P.O. Bo x 7 80 M240026 W ilmington, NC 284 02 USA February 12, 2024 T (910) 8 19-5950 scott. m u rray@ge.c o m U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001 10 CFR 50.90

Subject:

GEH License Amendment Request Modification-Permanent Cessation of the GE Nuclear Test Reactor (NTR) and Possession Only Authorization

References : 1) NRC License R-33, Docket 0500073, General Electric Hitachi (GEH) Nuclear Test Reactor (NTR)

2) GEH License Amendment Request - Permanent Cessation of the GE Nuclear Test Reactor (NTR) and Possession Only Authorization, 10/6/23 (ML23279A110)
3) Letter, S. Murray (GEH) to NRC Document Control Desk, "GEH Response to NRC Request for Additional Information, 12/15/23 (ML23349A047)
4) GEH/NRC Possession-Only License Audit Meeting, 2/8/24 GE Hitachi Nuclear Energy Americas LLC (GEH) is withdrawing a commitment made in the NTR possession-only license amendment request (Reference 2) and offers this explanation.

In paragraph 2, bullet 3, GEH stated that the control room console key will be placed in the off position, removed, and be locked in a secured location away from the facility. This commitment was discussed during a meeting between the NRC and GEH (Reference 4) as not necessary because it will not be possible to start the reactor or otherwise affect reactivity in the reactor from the console under the possession -only license for the following reasons :

1. Safety and control rods will be fully inserted and restrained from any movement. This is according to technical specifications 3.2. 1, 4.2. 1, and 5.3.1.
2. Manual poison sheets (MPS) w ill be installed, locked in place, and the keys for the MPS will be removed from the facility. This is according to technical specifications 3.2.2, 4.2.2, and 5.3. 1.

Please proceed with issuance of the amended possession only license conditions that GEH accepted on December 15, 2023 (Reference 3). Contact me If you have any questions or concerns regarding this request.

I declare under penalty of perjury that the foregoing is true and correct.

Sincec ;:=vt m ~

s~~ay, Manager ~

Facility Licensing

cc: NRC Region IV Administrator J. D. Parrott, USNRC/NMSS/DUWP/RDB J. M. Borromeo, Branch Chief, USNRC/NRR/DANU/UNPL G. A. Wertz, USNRC/NRR/DANU/UNPL SPM 24-011