ML24176A019: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: | {{#Wiki_filter:From: Andrew Miller Sent: Thursday, June 20, 2024 4:06 PM To: Mary Lou Dunzik-Gougar Cc: Holly Cruz (She/Her/Hers); Duane Hardesty (He/Him/His); Linh Tran; Larry Foulkrod | ||
==Subject:== | ==Subject:== | ||
Line 23: | Line 23: | ||
==Dear Dr. Dunzik-Gougar:== | ==Dear Dr. Dunzik-Gougar:== | ||
By {{letter dated|date=February 13, 2023|text=letter dated February 13, 2023}}, Agencywide Documents Access and Management System Accession No. ML23074A066, as supplemented by letter(s) dated June 15, 2023 and April 26, 2024 (ML23174A104 and ML24137A307, respectively), Idaho State University (ISU) submitted a license amendment request (LAR) for the ISU research reactor facility. The current proposed LAR would: (1) Removal of Channel 2 low scram. (2) Removal of the exception statement from Technical Specifications Section 3.2.d. (3) | By {{letter dated|date=February 13, 2023|text=letter dated February 13, 2023}}, Agencywide Documents Access and Management System Accession No. ML23074A066, as supplemented by letter(s) dated June 15, 2023 and April 26, 2024 (ML23174A104 and ML24137A307, respectively), Idaho State University (ISU) submitted a license amendment request (LAR) for the ISU research reactor facility. The current proposed LAR would: (1) Removal of Channel 2 low scram. (2) Removal of the exception statement from Technical Specifications Section 3.2.d. (3) | ||
Removal of Unit A and Unit B from Technical Specifications Table 3.1. (4) Correction of the $/second reactivity insertion limit number in Technical Specifications Section 3.2.b. | Removal of Unit A and Unit B from Technical Specifications Table 3.1. (4) Correction of the $/second reactivity insertion limit number in Technical Specifications Section 3.2.b. | ||
Line 32: | Line 31: | ||
Andrew Miller, Project Manager Non-power Production and Utilization Facility Licensing Branch (UNPL) | Andrew Miller, Project Manager Non-power Production and Utilization Facility Licensing Branch (UNPL) | ||
Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation, USNRC Phone: | Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation, USNRC Phone: (301) 415-1080 | ||
Hearing Identifier: | Hearing Identifier: NRR_DRMA Email Number: 2528 | ||
Mail Envelope Properties | Mail Envelope Properties (SA1PR09MB774216ABB5F664C8EAC097F7E3C82) | ||
==Subject:== | ==Subject:== | ||
Update to NRC Review Schedule for ISU LAR Sent Date: | Update to NRC Review Schedule for ISU LAR Sent Date: 6/20/2024 4:06:01 PM Received Date: 6/20/2024 4:06:00 PM From: Andrew Miller | ||
Created By: | Created By: Andrew.Miller@nrc.gov | ||
Recipients: | Recipients: | ||
Line 51: | Line 50: | ||
Tracking Status: None | Tracking Status: None | ||
Post Office: | Post Office: SA1PR09MB7742.namprd09.prod.outlook.com | ||
Files | Files Size Date & Time MESSAGE 1577 6/20/2024 4:06:00 PM | ||
Options Priority: | Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:}} |
Latest revision as of 13:05, 4 October 2024
ML24176A019 | |
Person / Time | |
---|---|
Site: | Idaho State University |
Issue date: | 06/20/2024 |
From: | Miller A NRC/NRR/DANU |
To: | Dunzik-Gougar M Idaho State University |
References | |
Download: ML24176A019 (2) | |
Text
From: Andrew Miller Sent: Thursday, June 20, 2024 4:06 PM To: Mary Lou Dunzik-Gougar Cc: Holly Cruz (She/Her/Hers); Duane Hardesty (He/Him/His); Linh Tran; Larry Foulkrod
Subject:
Update to NRC Review Schedule for ISU LAR
Dear Dr. Dunzik-Gougar:
By letter dated February 13, 2023, Agencywide Documents Access and Management System Accession No. ML23074A066, as supplemented by letter(s) dated June 15, 2023 and April 26, 2024 (ML23174A104 and ML24137A307, respectively), Idaho State University (ISU) submitted a license amendment request (LAR) for the ISU research reactor facility. The current proposed LAR would: (1) Removal of Channel 2 low scram. (2) Removal of the exception statement from Technical Specifications Section 3.2.d. (3)
Removal of Unit A and Unit B from Technical Specifications Table 3.1. (4) Correction of the $/second reactivity insertion limit number in Technical Specifications Section 3.2.b.
The purpose of this letter is to inform you of a schedule update to the review of the LAR, in light of receiving the last supplement on May 16, 2024. Based on current staff review schedules, the NRC staff now expects to complete its review and make a final determination on the LAR by September 26, 2024.
This estimate could change due to several factors, such as a need for additional RAI(s) and an unanticipated addition of scope to the review. The NRC staff will promptly communicate any additional schedule changes that would extend the expected completion date.
- Thanks,
Andrew Miller, Project Manager Non-power Production and Utilization Facility Licensing Branch (UNPL)
Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation, USNRC Phone: (301) 415-1080
Hearing Identifier: NRR_DRMA Email Number: 2528
Mail Envelope Properties (SA1PR09MB774216ABB5F664C8EAC097F7E3C82)
Subject:
Update to NRC Review Schedule for ISU LAR Sent Date: 6/20/2024 4:06:01 PM Received Date: 6/20/2024 4:06:00 PM From: Andrew Miller
Created By: Andrew.Miller@nrc.gov
Recipients:
"Holly Cruz (She/Her/Hers)" <Holly.Cruz@nrc.gov>
Tracking Status: None "Duane Hardesty (He/Him/His)" <Duane.Hardesty@nrc.gov>
Tracking Status: None "Linh Tran" <Linh.Tran@nrc.gov>
Tracking Status: None "Larry Foulkrod" <larryfoulkrod@isu.edu>
Tracking Status: None "Mary Lou Dunzik-Gougar" <mldunzikgougar@isu.edu>
Tracking Status: None
Post Office: SA1PR09MB7742.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 1577 6/20/2024 4:06:00 PM
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: