Byron Generating Station Units 1 and 2 Independent Design Inspection NRC Inspection Report No. 50-454/84-32 References (a):          June 11, 1984 letter from Cordell Reed to R. C. DeYoung.
Byron Generating Station Units 1 and 2 Independent Design Inspection NRC Inspection Report No. 50-454/84-32 References (a):          {{letter dated|date=June 11, 1984|text=June 11, 1984 letter}} from Cordell Reed to R. C. DeYoung.
(b):      June 29, 1984 letter from Cordell Reed R.C. DeYoung.
(b):      {{letter dated|date=June 29, 1984|text=June 29, 1984 letter}} from Cordell Reed R.C. DeYoung.


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==

Latest revision as of 14:45, 23 September 2022

Advises of Completion of Bechtel 840831 Final Design Review Rept,Per Insp Rept 50-454/84-32.Rept Confirms Adequacy of Three Plant Sys Designs & Sufficiency of Sargent & Lundy Design Control Measures.Util Rept Encl
ML20107K891
Person / Time
Site: Byron Constellation icon.png
Issue date: 08/16/1984
From: Reed C
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20107K894 List:
References
909N, NUDOCS 8502280436
Download: ML20107K891 (1)


Text

,

N Commonwealth E'* son l

O ) One First National Plaza, Chicago, Ilknots C' Address Reply to Post Office Box 767

/

V

/N[

\ Chicago, lilinois 60690 August 16, 1984 Mr. James-G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Byron Generating Station Units 1 and 2 Independent Design Inspection NRC Inspection Report No. 50-454/84-32 References (a): June 11, 1984 letter from Cordell Reed to R. C. DeYoung.

(b): June 29, 1984 letter from Cordell Reed R.C. DeYoung.

Dear Mr. Keppler:

This is to notify the NRC of the completion of the independent J design review (IDR) of Byron Station. The final report of this project,

" Byron Station Independent Design Review for Commonwec1th Edison Company, Final Report," August 1984, Bechtel Power Corporation, Volumes 1-4, is being provided under separate cover.

The results of this study and the conclusions of the IDR team were reviewed with the NRC in Bethesda on August 14, 1984. As described there, the IDR has confirmed the overall design adequacy of three key plant systems and the general sufficiency of Sargent & Lundy's design control measures. We are pleased that the IDR team believes their work provides additional assurance of the overall adequacy of the Byron design.

Representatives of Bechtel, Sargent & Lundy, Westinghouse, and

) Commonwealth Edison will be made available at your convenience to discuss this report. Further inquiries should be directed to Dennis Farrar or Tom Tramm.

I Copies of the final IDR report have been provided directly to Messrs. John F. Streeter, J. Nelson Grace, and L. N. 01shan. Additional i

copies are available if needed. One signed original and fifteen copies l of this letter are provided.

Very truly yours, i

8502200436 840816 PDR ADOCK 05000454

(^ W ( ( [syg%

G PDR i Cordell Reed [fA (( O /i Vice President i t i

t 1*

AUG 17 E64 9090N