ML20134A557: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 29: Line 29:
==Dear Mr. Sholly:==
==Dear Mr. Sholly:==


This is in response to your letter dated September 27, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), documents
This is in response to your {{letter dated|date=September 27, 1985|text=letter dated September 27, 1985}}, in which you requested, pursuant to the Freedom of Information Act (F0IA), documents
;          concerning the recent visit of the Caseload Forecast Panel to Seabrook, Unit 1.
;          concerning the recent visit of the Caseload Forecast Panel to Seabrook, Unit 1.
The documents listed on the enclosed Appendix A are enclosed.
The documents listed on the enclosed Appendix A are enclosed.

Latest revision as of 19:53, 14 December 2021

Responds to FOIA Request for Documents Re Recent Visit of Caseload Forecast Panel to Facility.App a Documents Encl. App B Documents Available in Pdr.Action on Request Complete
ML20134A557
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/29/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sholly S
MHB TECHNICAL ASSOCIATES
Shared Package
ML20134A558 List:
References
FOIA-85-669 NUDOCS 8511070408
Download: ML20134A557 (3)


Text

-

w t-olb

  • - # ,'-,,jo, ,

Uf0TED STATES

! <> NUCLEAR REGULATORY COMMISSION g ;p WASHINGTON, 0. C. 20555

%, ...../

XI 3 9 1%

Docket No. 50-443 Mr. Steve Sholly MHB Technical Associates 1723 Hamilton Avenue, Suite K IN RESPONSE REFER San Jose, CA 95125 TO F01A-85-669

Dear Mr. Sholly:

This is in response to your letter dated September 27, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), documents

concerning the recent visit of the Caseload Forecast Panel to Seabrook, Unit 1.

The documents listed on the enclosed Appendix A are enclosed.

The documents listed on the enclosed Appendix B are already available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555. We are enclosing a copy of a notice that provides charges and procedures for obtaining copies of records from the PDR.

This completes action on your request.

S' cerely

[

.ta .

. M. Felton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated m

8511070408 851029 PDR FOIA SHOLLY85-669 PDR

Re: F01A-85-669 APPENDIX A

1. Undated Notes taken by V. Nerses (6 pages)
2. Undated First draft of meeting summary (1 page).
3. Undated Second draft of meeting summary (1 page)
4. Undated Handouts at meeting with licensee (3 pages)

Re: F01A-85-669 APPENDIX B

1. 08/10/85 Letter to Knighton from Thomas, re: Information Data Package to Support NRC Caseload Forecast 850904-06 (PDR/AD0CK/50-443A 8508220145)
2. 09/23/85 " Summary of NRC Caseload Forecast Panel Meeting and Site Visit to Assess Construction Completion Schedule" re: Seabrook, Unit 1 (PDR/ADOCK/50-443A 8509300514)