ML20197C030: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20197C030
| number = ML20197C030
| issue date = 10/07/1986
| issue date = 10/07/1986
| title = Ack Receipt Pf 860901 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-062/86-01.Responses to Violations A,B & C Acceptable.Denial of Violation D Unacceptable,Per Reasons in Encl 1.W/o Encl
| title = Ack Receipt Pf Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-062/86-01.Responses to Violations A,B & C Acceptable.Denial of Violation D Unacceptable,Per Reasons in Encl 1.W/o Encl
| author name = Walker R
| author name = Walker R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8610310160
| document report number = NUDOCS 8610310160
| title reference date = 09-01-1986
| document type = CORRESPONDENCE-LETTERS, NRC TO EDUCATIONAL INSTITUTION, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO EDUCATIONAL INSTITUTION, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1

Latest revision as of 23:35, 8 December 2021

Ack Receipt Pf Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-062/86-01.Responses to Violations A,B & C Acceptable.Denial of Violation D Unacceptable,Per Reasons in Encl 1.W/o Encl
ML20197C030
Person / Time
Site: University of Virginia
Issue date: 10/07/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mulder R
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
References
NUDOCS 8610310160
Download: ML20197C030 (1)


See also: IR 05000062/1986001

Text

W .

OflyON

OCT 0 71936

University of Virginia

/ ATTN: Dr. R. U. Mulder, Director

Reactor Facility

Charlottesville, VA 22901

Gentlemen:

SUBJECT: REPORT NO. 50-62/86-01

Thank you for your response of September 4,1986, to our Notice of Violation,

issued on July 30, 1986, concerning activitics conducted at your Pool Reactor

facility.

Your response to Violations A, B and C has been found to be acceptable and we

will evaluate the implementation of your corrective actions during future

inspections.

After careful consideration of the basis for your denial of Violation D, we have

concluded for the reasons given in Enclosure 1 to this letter, that the violation

occurred as stated in the Notice of Violation. Therefore, in accordance with the

requirements of 10 CFR 2.201, please submit to this office within 30 days of the

date of this letter a written statement describing steps which have been taken to

correct Violation D and the results achieved, corrective actions which will be

taken to avoid further violations, and the date when full compliance will be

achieved.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

We appreciate your cooperation in this matter.

Sincerely

Original Signed by

Luis A. Reyes /for

Roger D. Walker, Director

Division of Reactor Projects

Enclosure:

Staff Assessment of Licensee Response

to Notice of Violation

cc w/o encl:

License Fee Management Branch

bec w/ enc 1:

Document Control Desk

^

Connonwealth of Virginia

RII RII RII RII

m unt

1

omc RII(

>

RII4

IE

i m, et

BKpevsin:er CMHosey DCollins JPS;ohr

.

GJen s DVerrelli JCunni ham

09/J3/86 09p/86 09/Jf/86 09ff/86 % / 6 86 j$//,/86 09/f/86

9610310160 861007

PDR ADOCK 05000062

G PDR p c/ pp

, -_

-. . .- -