ML20206M098: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 13: | Line 13: | ||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | ||
| page count = 1 | | page count = 1 | ||
| project = TAC:60094 | |||
| stage = Other | |||
}} | }} | ||
| Line 25: | Line 27: | ||
==SUBJECT:== | ==SUBJECT:== | ||
AMENDMENT NO. 115 TO THE TROJAN NUCLEAR PLANT TECHNICAL SPECIFICATIONS By letter dated May 29, 1986, Amendment No. 115 to Facility Operating License NPF-1 for the Trojan Nuclear Plant was issued with two administrative errors. | AMENDMENT NO. 115 TO THE TROJAN NUCLEAR PLANT TECHNICAL SPECIFICATIONS By {{letter dated|date=May 29, 1986|text=letter dated May 29, 1986}}, Amendment No. 115 to Facility Operating License NPF-1 for the Trojan Nuclear Plant was issued with two administrative errors. | ||
In the amendment, page 3/4 1-19 was errantly issued as page 3/4 1-18a and page B 3/4 1-3 was issued without incorporating the changes made by Amendment No. | In the amendment, page 3/4 1-19 was errantly issued as page 3/4 1-18a and page B 3/4 1-3 was issued without incorporating the changes made by Amendment No. | ||
114. | 114. | ||
Revision as of 06:13, 6 December 2021
| ML20206M098 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 06/24/1986 |
| From: | Chan T Office of Nuclear Reactor Regulation |
| To: | Withers B PORTLAND GENERAL ELECTRIC CO. |
| References | |
| TAC-60094, NUDOCS 8607010059 | |
| Download: ML20206M098 (1) | |
Text
- _ _ _ _ _ _ _ _ _ ._
June 24; 1986
, Docket No. 50-344 DISTRIBUTION
H. Thompson N. Thompson S. Varga OELD L. Harmon l E. Jordan B. Grimes J. Partlow l Mr. Bart D. Withers T. Barnhart(4) W. Jones l Vice President thclear- E. Butcher F0B ACRS(10) l Portland General Electric Company OPA LFMB T. Chan K. Johnston i 121 S.W. Salmon Street C. Vogan Portland, Oregon 97204
Dear Mr. Withers:
SUBJECT:
AMENDMENT NO. 115 TO THE TROJAN NUCLEAR PLANT TECHNICAL SPECIFICATIONS By letter dated May 29, 1986, Amendment No. 115 to Facility Operating License NPF-1 for the Trojan Nuclear Plant was issued with two administrative errors.
In the amendment, page 3/4 1-19 was errantly issued as page 3/4 1-18a and page B 3/4 1-3 was issued without incorporating the changes made by Amendment No.
114.
Copies of the corrected pages are enclosed. We apologiz for any T
inconvenience our errors may have caused.
Terence L. Chen, P oject Manager PWR Project Direct rate No. 3 Division of PWR Licensing-A, NRR
Enclosure:
As stated cc w/encicsure:
See next page 1 ~ ~
PAD-3 N PAD-3 11/ Ti-3 '
C. Vogan K. Johnston;bs T. Chan a 06/gV86 06h1/86 06//f/86 ,6 f I
e607010059 860624 4 DR ADOCK 0500
_ . .