ML20236S369: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 4
| page count = 4
| project = TAC:65479
| stage = Approval
}}
}}


Line 25: Line 27:
==SUBJECT:==
==SUBJECT:==
TECHNICAL SPECIFICATIONS FOR CYCLE 15 OPERATION (TAC NO 65479)
TECHNICAL SPECIFICATIONS FOR CYCLE 15 OPERATION (TAC NO 65479)
Re:        daddam Neck Plant The Comisuion has issued the enclosed Amendment No. 97 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated June 1,1987 as modified by letter dated July 22, 1987.
Re:        daddam Neck Plant The Comisuion has issued the enclosed Amendment No. 97 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated June 1,1987 as modified by {{letter dated|date=July 22, 1987|text=letter dated July 22, 1987}}.
The amendment supports operation of the haddam Neck Plant for Cycle 15 and          i reflects major efforts in upgrading design-basis accident analyses and in          (
The amendment supports operation of the haddam Neck Plant for Cycle 15 and          i reflects major efforts in upgrading design-basis accident analyses and in          (
reformatting the existing technical specifications as part of the planned conversion to the Westinghouse standard technical specifications.
reformatting the existing technical specifications as part of the planned conversion to the Westinghouse standard technical specifications.

Latest revision as of 22:11, 19 March 2021

Forwards Amend 97 to License DPR-61 & Safety Evaluation. Amend Supports Operation of Plant for Cycle 15 & Reflects Major Efforts in Upgrading design-basis Accident Analyses & Reformatting Tech Specs Per Westinghouse STS
ML20236S369
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/12/1987
From: Frank Akstulewicz
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20236S372 List:
References
TAC-65479, NUDOCS 8711250109
Download: ML20236S369 (4)


Text

.

!(paccog ko UNITED STATES NUCLEAR REGULATORY COMMISSION

r. j W ASHINGTON, D. C. 20%5 8 November 12, 1987 k...H ..f Docket No.: 50-213 Mr. Edward J. Mroczka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connectirot 06141-0270

Dear Mr. Mroczka:

SUBJECT:

TECHNICAL SPECIFICATIONS FOR CYCLE 15 OPERATION (TAC NO 65479)

Re: daddam Neck Plant The Comisuion has issued the enclosed Amendment No. 97 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated June 1,1987 as modified by letter dated July 22, 1987.

The amendment supports operation of the haddam Neck Plant for Cycle 15 and i reflects major efforts in upgrading design-basis accident analyses and in (

reformatting the existing technical specifications as part of the planned conversion to the Westinghouse standard technical specifications.

More specifically, the license amendment deletes existing Technical Specifica-tions 3.15, " Reactivity Anomalies"; 3.16. " Isothermal Coefficient of Reactivity";

3.18, " Power Distribution Monitoring and Control"; and 3.20, " Reactor Coolant {

System Flow, Temperature and Pressure." The information contained in those j specifications has been reorganized along with additional limiting conditions of l operation, action statements and surveillance requirements, which are consistent l with the Westinghouse standard technical specifications, into revised Technical l Specifications 3.3, " Reactor Coolant System Operational Components"; 3.10, {

" Reactivity Control"; and 3.17 " Limiting Linear Heat Generation Rate"; as required, to ensure completeness with the previous existing technical specifica-tion. One new specification (3.24. "Special Test Exceptions") has been added to formalize the special test exceptions required to perform various startup physics tests.

In addition, existing technical specifications in sections 1.0, " Definitions";

2.2, " Safety Limits"; 2.4, " Maximum Safety Settings - Protective Instruments-tion"; 3.11. " Containment"; 3.13, " Refueling"; 3.5, " Chemical and Volume Control l System"; 3.7, " Minimum Water Volume and Boron Concentration in the Refueling Water Storage Tank"; and 4.9, " Main Steam Isolation Valves" have been revised to account for the revised design basis analysis in support of the safe operation of the Haddam Neck Plant for Cycle 15.

8711250109 871112 3 ADOCK 0500 gDR

_ _ - - - - - - - - - - - - - - - - - - )

Edward J. Mroczka i A copy of the Safety Evaluation is enclosed. A Notice of Issuance will be included in;the Commission's next regular biweekly Federal Register notice.

Sincerely, M[

Francis M.Rstulewicz, Jr, Project Manager Integrated Safety Assessment Project Directorate Division of. Reactor. Projects - III, IV,.V and Special Projects- ,

l

Enclosures:

1. Amendment No. to License No. DPR-61
2. Safety Evaluation  !

cc w/ enclosures: 1 See next'page DISTRIBUTION JeHEPWF* EJordan NRC/ Local PDR JPartlow ISAPD File TBarnhart (4)

DCrutchfield WJones FSchroeder ACRS(10)

MShuttleworth WHodges FAkstulewicz DHagen OGC-Beth EButcher ARM /LFMB GPA/PA i

  1. M LA:

MSh D

leworth:bd PM:ISAPD /b FAksulew cz AD:ISAP gf MBoyle OGC-Bethesda 10/ /87 10/go/87 10/7p/87 10/ W 87 0FFICIAL RECORD COPY 4

M i

Edward J. Mroczka - 2'-

1 A copy of the Safety Evaluation.is enclosed. A Notice of Issuance will be  ;

included in the Consnission's next regular biweekly Federal Register notice. '

Sincerely, (f)fh ~/ '4 Francis M. Akstulewicz, Jr. roject Manager Integrated Safety Assessment Project Directorate Division of Reactor Projects - III, IV, V l and Special Projects j

Enclosures:

1. Amendment No.97to License No. DPR-61
2. Safety Evaluation cc w/ enclosures:

See next page

i Mr. Edward J. Mroczka Haddam Neck Plant ,

Connecticut Yar.kee Atomic Power Company I cc: Gerald Garfield, Esquire Kevin McCarthy, Director l Day, Berry & Howard Radiation Control Unit i Counselors at Law Department of Environmental i City Place Protection Hartford, Connecticut 06103-3499 State Office Building j Hartford, Connecticut 06106 i Superintendent Richard M. Kacich, Manager Haddam Neck Plant Generation Facilities Licensing l RFD #1 Northeast Utilities Service Company Post Office Box 127E Post Office Box 270 East Hampton, Connecticut 06424 Hartford, Connecticut 06141-0270 Wayne D. Romberg Donald O. Nordquist, Director Vice President, Nuclear Operations Quality Services Department Northeast Utilities Service Company Northeast Utilities Service Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 Bradford S. Chase, Under Secretary Energy Division Office of Policy and Management 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC P. O. Box 116 East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

. _ _ - _ _ _ _ _ .