05000263/FIN-2009007-02: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 13: Line 13:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71111.21
| Inspection procedure = IP 71111.21
| Inspector = A Dunlop, A Stone, C Brown, H Campbell, J Bozga, L Jones, M Munir, N Feliz,_Adomo S, Kobylarza Stone, C Brown, H Campbell, J Bozga, L Jones, M Munir, N Adorno, S Edmonds, S Kobylarz, A Dunlop
| Inspector = A Dunlop, A Stone, C Brown, H Campbell, J Bozga, L Jones, M Munir, N Feliz Adomo, S Kobylarza, Stonec Brown, H Campbell, J Bozga, L Jones, M Munir, N Adorno, S Edmonds, S Kobylarz, A Dunlop
| CCA = P.2
| CCA = P.2
| INPO aspect = PI.2
| INPO aspect = PI.2
| description = The inspectors identified an NCV of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, having very low safety-significance for the failure to restore the emergency service water (ESW) piping supports to their design specifications. Specifically, although the licensee identified the existence of gaps between the ESW piping supports and the baseplates, the licensee failed to recognize that this condition did not meet seismic Category 1 design basis requirements. As a result, corrective actions were not implemented. The licensee entered this issue into its corrective action program and restored the supports to their design specifications.   
| description = The inspectors identified an NCV of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, having very low safety-significance for the failure to restore the emergency service water (ESW) piping supports to their design specifications. Specifically, although the licensee identified the existence of gaps between the ESW piping supports and the baseplates, the licensee failed to recognize that this condition did not meet seismic Category 1 design basis requirements. As a result, corrective actions were not implemented. The licensee entered this issue into its corrective action program and restored the supports to their design specifications.   
}}
}}

Latest revision as of 19:39, 20 February 2018

02
Site: Monticello Xcel Energy icon.png
Report IR 05000263/2009007 Section 1R21
Date counted Dec 31, 2009 (2009Q4)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.21
Inspectors (proximate) A Dunlop
A Stone
C Brown
H Campbell
J Bozga
L Jones
M Munir
N Feliz Adomo
S Kobylarza
Stonec Brown
H Campbell
J Bozga
L Jones
M Munir
N Adorno
S Edmonds
S Kobylarz
A Dunlop
CCA P.2, Evaluation
INPO aspect PI.2
Finding closed by
IR 05000263/2009007 (6 January 2010)
'