ML20205E094: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:r                                                .
CoNTAINS 2.7'40 INToRMATIONMATCMAL T gn. orig    .
UNITE 3 ST ATES
: p.          .o' NUCLEAR REGULATORY COMMISSION
                                    " "                < REGION 11 '
["                n                                                ,
    $                ,j                        101 MARIETTA STREET.N.Wi.
* 2                          ATLANTA. GEORGI A 30323 AUG 0 6.1986 Report No. 70-1113/86-16                                                ;
Docket No. 70-1113                                                        License No. SNM-1097 Licensee: General Electric Company Nuclear Fuel and Components Manufacturing Wilmington, NC 28402 Date of Inspection: July 21-25, 1986 Inspector:
I[6b    6 Date Signed lyD. W. Jonss, Statistidian Approved by:              RW E. J. McAlpine, Chief, Waterial Control and 2/5/f6 Date Signed Accountability Section, Nuclear Materials Safety and Safeguards Branch, Division of Radiation Safety and Safeguards
 
==SUMMARY==
 
Scope: Areas examined during this routine, unannounced inspection included followup on inspector identified problems and unresolved items, and records and reports.
Results: One violation was identified - failure to submit a material status report.
8608180240 860806 PDR      ADOCK 07001113 C                        PDR A57$YhII[ygwirs o}}

Latest revision as of 00:23, 30 December 2020

Partially Withheld Insp Rept 70-1113/86-16 on 860721-25 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Submit Matl Status Rept
ML20205E094
Person / Time
Site: 07001113
Issue date: 08/06/1986
From: David Jones, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19292F772 List:
References
70-1113-86-16, NUDOCS 8608180240
Download: ML20205E094 (1)


Text

r .

CoNTAINS 2.7'40 INToRMATIONMATCMAL T gn. orig .

UNITE 3 ST ATES

p. .o' NUCLEAR REGULATORY COMMISSION

" " < REGION 11 '

[" n ,

$ ,j 101 MARIETTA STREET.N.Wi.

  • 2 ATLANTA. GEORGI A 30323 AUG 0 6.1986 Report No. 70-1113/86-16  ;

Docket No. 70-1113 License No. SNM-1097 Licensee: General Electric Company Nuclear Fuel and Components Manufacturing Wilmington, NC 28402 Date of Inspection: July 21-25, 1986 Inspector:

I[6b 6 Date Signed lyD. W. Jonss, Statistidian Approved by: RW E. J. McAlpine, Chief, Waterial Control and 2/5/f6 Date Signed Accountability Section, Nuclear Materials Safety and Safeguards Branch, Division of Radiation Safety and Safeguards

SUMMARY

Scope: Areas examined during this routine, unannounced inspection included followup on inspector identified problems and unresolved items, and records and reports.

Results: One violation was identified - failure to submit a material status report.

8608180240 860806 PDR ADOCK 07001113 C PDR A57$YhII[ygwirs o