ML20066D388: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:'
Revision 1 - 1/8/82        O OPERATING DATA REPORT DOCKET NO.      50-346 DATE    Januarv 8, 1982 CO31PLETED BY      Bilal Sarsour TELEPliONE    (419) 259-5000, Ext. 251 OPERATING STATUS D vis-Besse    Unit 1                          Notes
: 1. Unit Name:
: 2. Reporting Period:            "1Y'
: 3. Licensed Thermal Power (>!Wil:          2772
: 4. Nameplate Rating (Gross alWe):            925
: 5. Design Electrical Rating (Net 31We):      906
: 6. 51aximum Dependable Capacity (Gross 31We):          918                                                  -
1
: 7. Slaximum Dependable Capacity (Net Slwe):            874
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
: 9. Power Lesel To Which Restricted,If Any (Net 51We):              None.
: 10. Reasons For Restrictions. If Any:
This alonth              Yr.-to.Date        Cumulative II. Ilours In Reporting Period                                    744                  5,087            26.328
: 12. Number Of 11ours Reactor Was Critical                          271.4                3.297            13.379.6
: 13. Reactor Resene Shutdown Hours                                    39.8                    74.6          2,553.2
: 14. Ilours Generator On.Line                                      267.6                3,146.6          12.488.9
: 15. Unit Resene Shutdown flours                                      0                      0            1.731.4
: 16. Gross Thermal Energy Generated (31Wil)                  642,660            7,034,943            28,123,445 1
: 17. Gross E!cetrical Energy Generated (SIWil)                212.015_,_.        2.350.398            9.377.551__
IS. Net Electrical Energy Generated (31WH)                  193.927            2.196.512            8.730.361
: 19. Unit Senice Factor                                              36.0                    61.9              47.4
: 20. Unit Availability Factor                                        36.0                    61.9              54.0
: 21. Unit Capacity Factor (Using SIDC Net)                            29.3                    48.5                37.9
: 22. Unit Capacity Factor (Using DER Net)                            28.8                    47.7              36.6
: 23. Unit Forced Outage Rate                                        '64.0                    32.0              26.9
: 24. Shutdowns Scheduled Over Next 6 31onths (Type.Date,and Duration of Each):
: 25. If Shut Down At Ertd Of Report Period. Estimated Date of Startup:              August 14. 1981
: 26. Units in Test Status iPrior to Commercial OP eration):                        Forecast              Achiesed INITI A L CRITICA LITY INITI AL ELECTRICITY CO\1\lERCI A L OPER ATION 8211110313 820108 PDR ADOCK 05000346                                                                                              (uga R                            PDR
                                                                                      .-            .--                        .}}

Latest revision as of 15:45, 21 December 2020

to Monthly Operating Rept for Jul 1981
ML20066D388
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1982
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20066D281 List:
References
NUDOCS 8211110313
Download: ML20066D388 (1)


Text

'

Revision 1 - 1/8/82 O OPERATING DATA REPORT DOCKET NO. 50-346 DATE Januarv 8, 1982 CO31PLETED BY Bilal Sarsour TELEPliONE (419) 259-5000, Ext. 251 OPERATING STATUS D vis-Besse Unit 1 Notes

1. Unit Name:
2. Reporting Period: "1Y'
3. Licensed Thermal Power (>!Wil: 2772
4. Nameplate Rating (Gross alWe): 925
5. Design Electrical Rating (Net 31We): 906
6. 51aximum Dependable Capacity (Gross 31We): 918 -

1

7. Slaximum Dependable Capacity (Net Slwe): 874
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
9. Power Lesel To Which Restricted,If Any (Net 51We): None.
10. Reasons For Restrictions. If Any:

This alonth Yr.-to.Date Cumulative II. Ilours In Reporting Period 744 5,087 26.328

12. Number Of 11ours Reactor Was Critical 271.4 3.297 13.379.6
13. Reactor Resene Shutdown Hours 39.8 74.6 2,553.2
14. Ilours Generator On.Line 267.6 3,146.6 12.488.9
15. Unit Resene Shutdown flours 0 0 1.731.4
16. Gross Thermal Energy Generated (31Wil) 642,660 7,034,943 28,123,445 1
17. Gross E!cetrical Energy Generated (SIWil) 212.015_,_. 2.350.398 9.377.551__

IS. Net Electrical Energy Generated (31WH) 193.927 2.196.512 8.730.361

19. Unit Senice Factor 36.0 61.9 47.4
20. Unit Availability Factor 36.0 61.9 54.0
21. Unit Capacity Factor (Using SIDC Net) 29.3 48.5 37.9
22. Unit Capacity Factor (Using DER Net) 28.8 47.7 36.6
23. Unit Forced Outage Rate '64.0 32.0 26.9
24. Shutdowns Scheduled Over Next 6 31onths (Type.Date,and Duration of Each):
25. If Shut Down At Ertd Of Report Period. Estimated Date of Startup: August 14. 1981
26. Units in Test Status iPrior to Commercial OP eration): Forecast Achiesed INITI A L CRITICA LITY INITI AL ELECTRICITY CO\1\lERCI A L OPER ATION 8211110313 820108 PDR ADOCK 05000346 (uga R PDR

.- .-- .