ML20066D388: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:' | ||
Revision 1 - 1/8/82 O OPERATING DATA REPORT DOCKET NO. 50-346 DATE Januarv 8, 1982 CO31PLETED BY Bilal Sarsour TELEPliONE (419) 259-5000, Ext. 251 OPERATING STATUS D vis-Besse Unit 1 Notes | |||
: 1. Unit Name: | |||
: 2. Reporting Period: "1Y' | |||
: 3. Licensed Thermal Power (>!Wil: 2772 | |||
: 4. Nameplate Rating (Gross alWe): 925 | |||
: 5. Design Electrical Rating (Net 31We): 906 | |||
: 6. 51aximum Dependable Capacity (Gross 31We): 918 - | |||
1 | |||
: 7. Slaximum Dependable Capacity (Net Slwe): 874 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons: | |||
: 9. Power Lesel To Which Restricted,If Any (Net 51We): None. | |||
: 10. Reasons For Restrictions. If Any: | |||
This alonth Yr.-to.Date Cumulative II. Ilours In Reporting Period 744 5,087 26.328 | |||
: 12. Number Of 11ours Reactor Was Critical 271.4 3.297 13.379.6 | |||
: 13. Reactor Resene Shutdown Hours 39.8 74.6 2,553.2 | |||
: 14. Ilours Generator On.Line 267.6 3,146.6 12.488.9 | |||
: 15. Unit Resene Shutdown flours 0 0 1.731.4 | |||
: 16. Gross Thermal Energy Generated (31Wil) 642,660 7,034,943 28,123,445 1 | |||
: 17. Gross E!cetrical Energy Generated (SIWil) 212.015_,_. 2.350.398 9.377.551__ | |||
IS. Net Electrical Energy Generated (31WH) 193.927 2.196.512 8.730.361 | |||
: 19. Unit Senice Factor 36.0 61.9 47.4 | |||
: 20. Unit Availability Factor 36.0 61.9 54.0 | |||
: 21. Unit Capacity Factor (Using SIDC Net) 29.3 48.5 37.9 | |||
: 22. Unit Capacity Factor (Using DER Net) 28.8 47.7 36.6 | |||
: 23. Unit Forced Outage Rate '64.0 32.0 26.9 | |||
: 24. Shutdowns Scheduled Over Next 6 31onths (Type.Date,and Duration of Each): | |||
: 25. If Shut Down At Ertd Of Report Period. Estimated Date of Startup: August 14. 1981 | |||
: 26. Units in Test Status iPrior to Commercial OP eration): Forecast Achiesed INITI A L CRITICA LITY INITI AL ELECTRICITY CO\1\lERCI A L OPER ATION 8211110313 820108 PDR ADOCK 05000346 (uga R PDR | |||
.- .-- .}} |
Latest revision as of 15:45, 21 December 2020
ML20066D388 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 01/08/1982 |
From: | Sarsour B TOLEDO EDISON CO. |
To: | |
Shared Package | |
ML20066D281 | List: |
References | |
NUDOCS 8211110313 | |
Download: ML20066D388 (1) | |
Text
'
Revision 1 - 1/8/82 O OPERATING DATA REPORT DOCKET NO. 50-346 DATE Januarv 8, 1982 CO31PLETED BY Bilal Sarsour TELEPliONE (419) 259-5000, Ext. 251 OPERATING STATUS D vis-Besse Unit 1 Notes
- 1. Unit Name:
- 2. Reporting Period: "1Y'
- 3. Licensed Thermal Power (>!Wil: 2772
- 4. Nameplate Rating (Gross alWe): 925
- 5. Design Electrical Rating (Net 31We): 906
- 6. 51aximum Dependable Capacity (Gross 31We): 918 -
1
- 7. Slaximum Dependable Capacity (Net Slwe): 874
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
- 9. Power Lesel To Which Restricted,If Any (Net 51We): None.
- 10. Reasons For Restrictions. If Any:
This alonth Yr.-to.Date Cumulative II. Ilours In Reporting Period 744 5,087 26.328
- 12. Number Of 11ours Reactor Was Critical 271.4 3.297 13.379.6
- 13. Reactor Resene Shutdown Hours 39.8 74.6 2,553.2
- 14. Ilours Generator On.Line 267.6 3,146.6 12.488.9
- 15. Unit Resene Shutdown flours 0 0 1.731.4
- 16. Gross Thermal Energy Generated (31Wil) 642,660 7,034,943 28,123,445 1
- 17. Gross E!cetrical Energy Generated (SIWil) 212.015_,_. 2.350.398 9.377.551__
IS. Net Electrical Energy Generated (31WH) 193.927 2.196.512 8.730.361
- 19. Unit Senice Factor 36.0 61.9 47.4
- 20. Unit Availability Factor 36.0 61.9 54.0
- 21. Unit Capacity Factor (Using SIDC Net) 29.3 48.5 37.9
- 22. Unit Capacity Factor (Using DER Net) 28.8 47.7 36.6
- 23. Unit Forced Outage Rate '64.0 32.0 26.9
- 24. Shutdowns Scheduled Over Next 6 31onths (Type.Date,and Duration of Each):
- 25. If Shut Down At Ertd Of Report Period. Estimated Date of Startup: August 14. 1981
- 26. Units in Test Status iPrior to Commercial OP eration): Forecast Achiesed INITI A L CRITICA LITY INITI AL ELECTRICITY CO\1\lERCI A L OPER ATION 8211110313 820108 PDR ADOCK 05000346 (uga R PDR
.- .-- .