ML17318A528: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML17326A433
| number = ML17326A433
| issue date = 12/27/1979
| issue date = 12/27/1979
| title = Forwards LERs 79-063/03L-0 & 79-064/03L-0
| title = LER 79-064/03L-0:on 791201,during Investigation of High Steam Generator Level Indication for Channel 1 Loop 4, Transmitter Blp 141 Found Out of Spec.Caused by Unknown Defect.Unit Sent to Manufacturer.Investigation Ongoing
| author name = Delong S
| author name = Delong S
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Line 21: Line 21:
| number = ML17326A432
| number = ML17326A432
| issue date = 12/27/1979
| issue date = 12/27/1979
| title = Forwards LERs 79-063/03L-0 & 79-064/03L-0
| title = LER 79-063/03L-0:on 791127,in Mode 1,both Boric Acid Transfer Pumps Were Made Inoperable.Caused Intentionally to Unplug Branch Line That Had Solidified
| author name = Lease R
| author name = Lease R
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG

Latest revision as of 08:12, 7 March 2020

Forwards LERs 79-063/03L-0 & 79-064/03L-0
Date released: 05/31/2018 Download: ML17318A528


LER 79-064/03L-0:on 791201,during Investigation of High Steam Generator Level Indication for Channel 1 Loop 4, Transmitter Blp 141 Found Out of Spec.Caused by Unknown Defect.Unit Sent to Manufacturer.Investigation Ongoing
ML17326A433
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/27/1979
From: Delong S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A433 (2)
LER 79-063/03L-0:on 791127,in Mode 1,both Boric Acid Transfer Pumps Were Made Inoperable.Caused Intentionally to Unplug Branch Line That Had Solidified
ML17326A432
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/27/1979
From: Lease R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A432 (2)
Forwards LERs 79-063/03L-0 & 79-064/03L-0
ML17318A527
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/27/1979
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17318A527 (2)