ML17326A335: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 6: | Line 6: | ||
| number = ML17326A337 | | number = ML17326A337 | ||
| issue date = 11/07/1979 | | issue date = 11/07/1979 | ||
| title = | | title = LER 79-053/03L-0:on 791012,loop 3 Channel 4 Steam Generator Level Failed.Caused by Faulty Containment Cable Penetration. Penetration Feedthrough Switched to Spare Penetration & New Feedthrough Checked for Operability | ||
| author name = Delong S | | author name = Delong S | ||
| author affiliation = INDIANA MICHIGAN POWER CO. | | author affiliation = INDIANA MICHIGAN POWER CO. |
Latest revision as of 05:05, 7 March 2020
Date released: 05/31/2018 | Download: ML17326A335 |
---|---|
ML17326A337 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 11/07/1979 |
From: | Delong S INDIANA MICHIGAN POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML17326A337 (2) | |
ML17326A334 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 11/07/1979 |
From: | Shaller D INDIANA MICHIGAN POWER CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
TASK-OS, TASK-RS-902-4 | |
Download: ML17326A334 (2) | |