ML19209C621: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 21: Line 21:
14                          LICENSL    NUf16EH                        25      26      LICLPut TYPE JJ I~          8 9            LICIf6t l COOL                    15 8
14                          LICENSL    NUf16EH                        25      26      LICLPut TYPE JJ I~          8 9            LICIf6t l COOL                    15 8
CON'T
CON'T
                        '
                         $',7c'c [Lj@[015 10 l0 [0 13 l3 18 l@[0                                            19          1l4j7l9J@l1lnl1l,l7loj@
                         $',7c'c [Lj@[015 10 l0 [0 13 l3 18 l@[0                                            19          1l4j7l9J@l1lnl1l,l7loj@
74      5      HE PORT DAT E          CJ 1            B                    00            61            COaf T NUV0th                  68    6')        EVENT D AT t!
74      5      HE PORT DAT E          CJ 1            B                    00            61            COaf T NUV0th                  68    6')        EVENT D AT t!
t vent orsCn!PTION AND PHOP Allt E CONSEQUENCES h o      7 On September 14, 1979, during flode 1 operation, the high steam line differential                                                                                            j
t vent orsCn!PTION AND PHOP Allt E CONSEQUENCES h o      7 On September 14, 1979, during flode 1 operation, the high steam line differential                                                                                            j
       ,    ,      ; pressure loop 2 channel II bistable (P-1484-2) failed to trip during the performance j Since the channel was placed in the tripped condi- j g      ,) { the monthly surveillance test.
       ,    ,      ; pressure loop 2 channel II bistable (P-1484-2) failed to trip during the performance j Since the channel was placed in the tripped condi- j g      ,) { the monthly surveillance test.
j g , ,, j j tion and loop 2 high steam line differential pressure channels III and IV remained                                                                                          j g gperable, the health and safety of the general public were not jeopardized.                                                                                                Reporta g
j g , ,, j j tion and loop 2 high steam line differential pressure channels III and IV remained                                                                                          j g gperable, the health and safety of the general public were not jeopardized.                                                                                                Reporta g t,    ,
                                                                                                                                                                                                        .
t,    ,
ble pursuant to T.S. 6.9.1.9.b.                                                                                                                                              ;
ble pursuant to T.S. 6.9.1.9.b.                                                                                                                                              ;
I DEliD I                                                                                                                                                                                        80 C DE                CO E        SLPCC E                    CO9PCNENT CODE                        SUBC D'E        S B    E o      9                          11 lB !@ (_Ej@ l G l@ l I l fi l S T l R lU lO Lcj@ I zl @                                18          19              2d 8                      9            10        11            12              13 7
I DEliD I                                                                                                                                                                                        80 C DE                CO E        SLPCC E                    CO9PCNENT CODE                        SUBC D'E        S B    E o      9                          11 lB !@ (_Ej@ l G l@ l I l fi l S T l R lU lO Lcj@ I zl @                                18          19              2d 8                      9            10        11            12              13 7
Line 48: Line 45:
                                                                                                                                   @l                                                            60 1            9                14            11 PfHSONNEl IXPOSUHES NUP.*B E H            TYPE        DESCHt P TION "
                                                                                                                                   @l                                                            60 1            9                14            11 PfHSONNEl IXPOSUHES NUP.*B E H            TYPE        DESCHt P TION "
l lil 7] 10 l0 C l@lZ @l                                      f1A PEHSONNE L INJU ifs NUVBf H              DESCntPflON YA                                                                                                                                  l 1
l lil 7] 10 l0 C l@lZ @l                                      f1A PEHSONNE L INJU ifs NUVBf H              DESCntPflON YA                                                                                                                                  l 1
i s 8  9 10 10 0l@l      11        12 80 L OSS OF OH D AMA(>E TO F ACILIT Y T4PE        D E SCillP T ION              v l1l9)lZl@lw                                                ftA                                                                                            1169
i s 8  9 10 10 0l@l      11        12 80 L OSS OF OH D AMA(>E TO F ACILIT Y T4PE        D E SCillP T ION              v l1l9)lZl@lw                                                ftA                                                                                            1169 1 1r 2 so l
                                                                                                                                                              . - - -
1 1r 2 so l
   ,            u .,
   ,            u .,
                                                                                                                                                                        ""'"" ""
                          """ ''
is .U[r DEIcn'PrlON O                                                                          : 910160+3 F                                        IIlIll            I i l l r.7 12 l H] {,fLjhl                                            flA                                                                                        l      l 68 69                                BJ ;
is .U[r DEIcn'PrlON O                                                                          : 910160+3 F                                        IIlIll            I i l l r.7 12 l H] {,fLjhl                                            flA                                                                                        l      l 68 69                                BJ ;
7          8 9            10 W    R. Cartwri ht                                                .n.    . 703-894-5151                                ?
7          8 9            10 W    R. Cartwri ht                                                .n.    . 703-894-5151                                ?


.
Virginia Eicctric and Power Company North Anna Power Station, Unit #1                         
Virginia Eicctric and Power Company North Anna Power Station, Unit #1                         



Latest revision as of 05:13, 2 February 2020

LER 79-119/03L-0:on 790914,high Steam Line Differential Pressure Loop 2 Channel II Bistable Failed to Trip During Surveillance Test.Caused by Loose Lead on Signal Comparator Card.Card Replaced & New One Calibr
ML19209C621
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/12/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19209C617 List:
References
LER-79-119-03L, LER-79-119-3L, NUDOCS 7910160497
Download: ML19209C621 (2)


Text

U. S. NUCLE AR R' GUL ATORY COMMISSION NRC FORM 366 (7 77)

LICENSEE EVENT REPORT CONTROL RLOCK; l l l l l l l (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6 o i IV IA lll la IS 11 l@l0101-10 01 Oj_0_LO I - 1010 @l 4 I l l 1 11 L1J@lSI L AI T $6l@

14 LICENSL NUf16EH 25 26 LICLPut TYPE JJ I~ 8 9 LICIf6t l COOL 15 8

CON'T

$',7c'c [Lj@[015 10 l0 [0 13 l3 18 l@[0 19 1l4j7l9J@l1lnl1l,l7loj@

74 5 HE PORT DAT E CJ 1 B 00 61 COaf T NUV0th 68 6') EVENT D AT t!

t vent orsCn!PTION AND PHOP Allt E CONSEQUENCES h o 7 On September 14, 1979, during flode 1 operation, the high steam line differential j

, ,  ; pressure loop 2 channel II bistable (P-1484-2) failed to trip during the performance j Since the channel was placed in the tripped condi- j g ,) { the monthly surveillance test.

j g , ,, j j tion and loop 2 high steam line differential pressure channels III and IV remained j g gperable, the health and safety of the general public were not jeopardized. Reporta g t, ,

ble pursuant to T.S. 6.9.1.9.b.  ;

I DEliD I 80 C DE CO E SLPCC E CO9PCNENT CODE SUBC D'E S B E o 9 11 lB !@ (_Ej@ l G l@ l I l fi l S T l R lU lO Lcj@ I zl @ 18 19 2d 8 9 10 11 12 13 7

HEFO7T FIE VISIO N SE QUEfJT s AL OCCUH RF r:CL

,_EVF NT YE AH HtrOHT NO CODE TYPL NO.

LE R F O ,gg;O l7l9l [--J 1l1l9l l/l 1013 l l30 Ll l-l l 0]

24 26 21 23 23 Ji 32

_ 21 22 JJ TAKEi A Tl J O Pt JT f* 1 O HOUHS 22 St i i bit F i 4 L 3. PLI P.i t F T LH Lc_jgt zjg [3'szlg [zl@ 10l0l0 0[

31

[43 Y l@ l42ff l@ l43ff l@ lW l1 [2 l0 f@

44 4/

7J 34 J6) 4 f)

CAUSE DESCHIPTION AND CORRECTIVE ACTIONS h i o 1The bistable failed because of a loose lead on the signal coyarator card. After the li li j l channel was placed in the tripped condition, the comarator car _d_was replaced and -the__]

j,j,j inew card was calibrated. The periodic test was then reperformed with satisfactory 1 j

i 3 tresults.

I Li l41 I 83 7 8 9

%POWCH OT HER ST ATU3 DISC f Y DISCOVLRY DESC5tiPisON ST JS lBl@[ Surveillance Test l lil5I[Ej@ 0l3l4l@] flA l AC11Vl1Y CONifNT HRE ASLD M hcl E ASE LOC ATION OF HELE ASE @

li lcl 8[z_J @ [ ZJ @ l f1A AMOUNT Or ACTIVITY 44 l flA 45

@l 60 1 9 14 11 PfHSONNEl IXPOSUHES NUP.*B E H TYPE DESCHt P TION "

l lil 7] 10 l0 C l@lZ @l f1A PEHSONNE L INJU ifs NUVBf H DESCntPflON YA l 1

i s 8 9 10 10 0l@l 11 12 80 L OSS OF OH D AMA(>E TO F ACILIT Y T4PE D E SCillP T ION v l1l9)lZl@lw ftA 1169 1 1r 2 so l

, u .,

is .U[r DEIcn'PrlON O  : 910160+3 F IIlIll I i l l r.7 12 l H] {,fLjhl flA l l 68 69 BJ ;

7 8 9 10 W R. Cartwri ht .n. . 703-894-5151  ?

Virginia Eicctric and Power Company North Anna Power Station, Unit #1

Attachment:

Pagt 1 of 1 Docket No. 50-338 Report No. LER 79-119 /03L-0 Description of Event on September 14, 1979, during steady state operation at 34" power, the high steam line differential pressure loop 2 channel II histable (P-1484-2) f ailed to trip while performing the nonthly surveillance test. The channel was placed in the tripped condition and declared inoperable.

Probable Consequences of Occurrence Stean line pressure indication is used to initiate a safety injection when two out of three channels (II, III, and IV) indicate a low line pressure as compared to both other lines. Since the af fected channel war, placed in the tripped condition and loop 2 high stean line differential pressure channels III and IV remained operable, the health and safety of the general public were not affected.

Cause of Occurrence The reason the histable did not trip was because the comparator card had a loose lead which connected to a normally energized terminal.

Inmediate Corrective Action The affected channel was placed in the tripped condition and the defective c omparator card was replaced. The new card was then calibratec and the periodic test reperformed satisfactorily.

Scheduled Corrective Action No scheduled corrective action is required.

Actions Taken to Prevent Recurrence No further actions are required.

1168 153