ML19324C456: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 21: | Line 21: | ||
i | i | ||
,, M General Offices | ,, M General Offices | ||
* Seleen Street. Berlin. Connecticut | * Seleen Street. Berlin. Connecticut r 7O# yin a. swe~ P.0, BOX 270 ! | ||
ew eei= %e. cw= HARTFORD. CONNECTICUT 06141-0270 L L ; [$ [,'gg8,"", (203) 665 6000 t | |||
r 7O# yin a. swe~ P.0, BOX 270 ! | November 6, 1989 , | ||
ew eei= %e. cw= HARTFORD. CONNECTICUT 06141-0270 L L ; [$ [,'gg8,"", (203) 665 6000 | |||
t | |||
MP-13697 I Re: 10CFR50.71(a) | MP-13697 I Re: 10CFR50.71(a) | ||
U.S. Nuclear Regulatory Commission Document Control Desk , | |||
U.S. Nuclear Regulatory Commission | |||
Washington, D.C. 20555 l | Washington, D.C. 20555 l | ||
; | ; | ||
Line 37: | Line 31: | ||
==Reference:== | ==Reference:== | ||
Facility Operating License No. NPF-49 f Docket No. 50-423 Dear Sir In accordance with reporting requirements of technical specifica-tions Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 89-11 covering operation for the month of October is hereby forwarded. | Facility Operating License No. NPF-49 f Docket No. 50-423 Dear Sir In accordance with reporting requirements of technical specifica-tions Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 89-11 covering operation for the month of October is hereby forwarded. | ||
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l | Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l | ||
; | ; | ||
A | A | ||
.( ' | .( ' | ||
l Ste h n E. Sc ce Station Superintendent Millstone Nuclear Power Station Attachment cc: W.T. Russell, Region I Administrator W.J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,2 &3 D.H. Jaffe, NRC Project Manager, Millstone Unit No. 3 i | l Ste h n E. Sc ce Station Superintendent Millstone Nuclear Power Station Attachment cc: W.T. Russell, Region I Administrator W.J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,2 &3 D.H. Jaffe, NRC Project Manager, Millstone Unit No. 3 i | ||
8911170119 991o33 pgy gDR ADOCK 05o00423 PDC i g l | 8911170119 991o33 pgy gDR ADOCK 05o00423 PDC i g l | ||
:::::: IRC O!!!AtlpG SfATOS tiP0tf C08Filf tD !! !!ACf01 IBG!N!!!!IG ::::::: | :::::: IRC O!!!AtlpG SfATOS tiP0tf C08Filf tD !! !!ACf01 IBG!N!!!!IG ::::::: | ||
: 1. D00!if.... 50 423- Of!!AtlpG$f1103 | : 1. D00!if.... 50 423- Of!!AtlpG$f1103 | ||
: 2. REP 0tfilG fit 10D.. 00f0 Bit 1989 001 AGE +Outlit 10015.. 0.0 +f45.0 :145.0 t 3. OflLiti C0ffACf.................A. L. ILB3 203 444 5388 ::::::::::::: | : 2. REP 0tfilG fit 10D.. 00f0 Bit 1989 001 AGE +Outlit 10015.. 0.0 +f45.0 :145.0 t 3. OflLiti C0ffACf.................A. L. ILB3 203 444 5388 ::::::::::::: | ||
Line 66: | Line 48: | ||
: 9. IF CEARGl$ 00001 AB0ft Slict LAST IIFO!!, !!AS0ES Alt... .. ... | : 9. IF CEARGl$ 00001 AB0ft Slict LAST IIFO!!, !!AS0ES Alt... .. ... | ||
I/A 10.POWIIlif!LTOWHICIIISit!Cf!P,IFAIT(plfput)...............R/A | I/A 10.POWIIlif!LTOWHICIIISit!Cf!P,IFAIT(plfput)...............R/A | ||
: 11.!!AS0RFORttsfilCfl08,IFAlf...1/A | : 11.!!AS0RFORttsfilCfl08,IFAlf...1/A B0ffi !!AtTODAft CC30LAfiftTODAft I | ||
B0ffi !!AtTODAft CC30LAfiftTODAft | |||
I | |||
!!.10CISIIIIP0tf!BGFit!0D 745.0 1,216.0 30,912.0 | !!.10CISIIIIP0tf!BGFit!0D 745.0 1,216.0 30,912.0 | ||
: 13. ICE!!I0F100tS781!!ACTORWASCliflCAL 745.0 5,452.6 24,412.4 14.!!!Cf01!!S!!TtSIDTDONFB00tS 0.0 29.0 723.9 15,50015 Giltlif01OHLift 145.0 5,375.1 13,922.3 16.tilf!!SilftSEUtlat200t$ 0.0 0.0 0.0 17.GROSSfittlltIIIRGIGli!!ATID(EWI) 2,503,05!.0 17,651,552.0 79,199,693.4 18.GROSSELECillCAl,IllRGTGilllAftD(HWE) 858,645.0 6,019,186.5 27,219,180.0 19, 5tf ILICfilCAL tittGT G!st!Af tD (BWI) 823,719.5 5,737,981.9 26,016,243.8 20.DilfStiflCIFACf01 100.0 13.7 77.4 21.UlltATAILA!!LiffFACTOR 100.0 13.7 ff4 | : 13. ICE!!I0F100tS781!!ACTORWASCliflCAL 745.0 5,452.6 24,412.4 14.!!!Cf01!!S!!TtSIDTDONFB00tS 0.0 29.0 723.9 15,50015 Giltlif01OHLift 145.0 5,375.1 13,922.3 16.tilf!!SilftSEUtlat200t$ 0.0 0.0 0.0 17.GROSSfittlltIIIRGIGli!!ATID(EWI) 2,503,05!.0 17,651,552.0 79,199,693.4 18.GROSSELECillCAl,IllRGTGilllAftD(HWE) 858,645.0 6,019,186.5 27,219,180.0 19, 5tf ILICfilCAL tittGT G!st!Af tD (BWI) 823,719.5 5,737,981.9 26,016,243.8 20.DilfStiflCIFACf01 100.0 13.7 77.4 21.UlltATAILA!!LiffFACTOR 100.0 13.7 ff4 | ||
Line 79: | Line 57: | ||
. ,.yg,. ,.v; .c ; v s- ; | . ,.yg,. ,.v; .c ; v s- ; | ||
, lg 0 ', '%' , | , lg 0 ', '%' , | ||
, 4 | , 4 s.- | ||
s.- | |||
Y, , , . - ' AVERAGE 1%ILY INIT KWER LEVEL , | Y, , , . - ' AVERAGE 1%ILY INIT KWER LEVEL , | ||
4 DOCKET NO. 50-423 , | |||
4 | |||
DOCKET NO. 50-423 , | |||
' (NIT tiilintnne tinit 3- | ' (NIT tiilintnne tinit 3- | ||
" ~ | " ~ | ||
. . DATE 11-01-1932 | . . DATE 11-01-1932 f , OCHPLETED BY 1. L. ft.u.c tes.4441368'- | ||
f , OCHPLETED BY 1. L. ft.u.c tes.4441368'- | |||
, W' f | , W' f | ||
[' !!KNTH OCTLTER, IRY AVERAG6 DAILY KMER LEVEL IRY- AVERAGE DAILY K MER LEVEL (MWE-NET) (MWE-!ET) ' | |||
[' !!KNTH OCTLTER, IRY AVERAG6 DAILY KMER LEVEL IRY- AVERAGE DAILY K MER LEVEL | |||
(MWE-NET) (MWE-!ET) ' | |||
i | i | ||
,.1 1.130= 16 1.126- > | ,.1 1.130= 16 1.126- > | ||
2 941 17 1.121 3 781 18 1.121 ' | 2 941 17 1.121 3 781 18 1.121 ' | ||
'4 1.124 -19 - 1 A84 5 1.124 20 1.123 6 1.12G 21 1.123 , | '4 1.124 -19 - 1 A84 5 1.124 20 1.123 6 1.12G 21 1.123 , | ||
Line 116: | Line 73: | ||
9 1.128 24- 1.125 10 '1.127 25 1.127 11 1.125 26 :1.127 | 9 1.128 24- 1.125 10 '1.127 25 1.127 11 1.125 26 :1.127 | ||
' I- r - > | ' I- r - > | ||
12 1.124 _ 27 1 125 | 12 1.124 _ 27 1 125 13 1.124 28 1.127 t | ||
13 1.124 28 1.127 t | |||
14~ ~1.123 29 1.128 15- 1.124 30 1.127_ | 14~ ~1.123 29 1.128 15- 1.124 30 1.127_ | ||
, 31 1.128 m | , 31 1.128 m | ||
J 1 | J 1 | ||
a | a | ||
1 4 | |||
DOCKET NO. 50-423 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FL. 'Ix1uur 3 OCTOBER 193S_ DATE 1:.-02-89 COMPLETED BE A. EIMS TELEPHONE (203) 444-5388 No. Date Type Dura- Reason Method of Licensee System Component cause and Corrective (1) tion (2) Shut down Event Code Code Action to Prevent Hours Reactor (3) Rept No. Prevent Recurrence NONE 1: F- Forced S: Schedules 2: Reasons: | |||
1 | |||
4 | |||
A-Equipment Failure (Explain) 3: Method 1-Manual 4: Exhibitfor Preparation of Data G - Instructions B-Maintenance or Test 2-Manual Scram Entry Sheets for Lic9nsee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-Ol61) | A-Equipment Failure (Explain) 3: Method 1-Manual 4: Exhibitfor Preparation of Data G - Instructions B-Maintenance or Test 2-Manual Scram Entry Sheets for Lic9nsee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-Ol61) | ||
E-Operator Training 8: License Exam previous month F-Administrative 5-Power Reduction 5: Exhibit 1 - Same Source G-Operational Error (Explain) (Duration 9-Other =0 (Explain)) | E-Operator Training 8: License Exam previous month F-Administrative 5-Power Reduction 5: Exhibit 1 - Same Source G-Operational Error (Explain) (Duration 9-Other =0 (Explain)) | ||
H-Other | H-Other | ||
, .. REPUELING INFORMATION REQUEST l e | , .. REPUELING INFORMATION REQUEST l e | ||
c e, , | c e, , | ||
OCTOBER 1989 ; | OCTOBER 1989 ; | ||
i l | i l | ||
: 1. Name of facility: Millstone 3. | : 1. Name of facility: Millstone 3. | ||
: 2. Scheduled date for next refueling shutdown: ' | : 2. Scheduled date for next refueling shutdown: ' | ||
November 17. 1990. i r | November 17. 1990. i r | ||
: 3. Scheduled date for restart following refueling: - | : 3. Scheduled date for restart following refueling: - | ||
Line 163: | Line 97: | ||
H/A l | H/A l | ||
: 5. Scheduled date for submitting licensing action and supporting information. l ULhz | : 5. Scheduled date for submitting licensing action and supporting information. l ULhz | ||
: 6. Important licensing considerations associated with refueling, l o.g., new of different fuel design or supplier, unreviewed | : 6. Important licensing considerations associated with refueling, l o.g., new of different fuel design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures: | ||
design of performance analysis methods, significant changes in fuel design, new operating procedures: | |||
HZA | HZA | ||
: 7. The number of fuel assemblies (a) in the core and (b) in the ' | : 7. The number of fuel assemblies (a) in the core and (b) in the ' | ||
Line 178: | Line 110: | ||
End of cycle 5. | End of cycle 5. | ||
t | t | ||
__}} | __}} |
Revision as of 01:09, 1 February 2020
ML19324C456 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 10/31/1989 |
From: | Elms A, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
MP-13697, NUDOCS 8911170119 | |
Download: ML19324C456 (5) | |
Text
~
,1
..; ,
i
,, M General Offices
- Seleen Street. Berlin. Connecticut r 7O# yin a. swe~ P.0, BOX 270 !
ew eei= %e. cw= HARTFORD. CONNECTICUT 06141-0270 L L ; [$ [,'gg8,"", (203) 665 6000 t
November 6, 1989 ,
MP-13697 I Re: 10CFR50.71(a)
U.S. Nuclear Regulatory Commission Document Control Desk ,
Washington, D.C. 20555 l
Reference:
Facility Operating License No. NPF-49 f Docket No. 50-423 Dear Sir In accordance with reporting requirements of technical specifica-tions Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 89-11 covering operation for the month of October is hereby forwarded.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l
A
.( '
l Ste h n E. Sc ce Station Superintendent Millstone Nuclear Power Station Attachment cc: W.T. Russell, Region I Administrator W.J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,2 &3 D.H. Jaffe, NRC Project Manager, Millstone Unit No. 3 i
8911170119 991o33 pgy gDR ADOCK 05o00423 PDC i g l
- IRC O!!!AtlpG SfATOS tiP0tf C08Filf tD !! !!ACf01 IBG!N!!!!IG :::::::
- 1. D00!if.... 50 423- Of!!AtlpG$f1103
- 2. REP 0tfilG fit 10D.. 00f0 Bit 1989 001 AGE +Outlit 10015.. 0.0 +f45.0 :145.0 t 3. OflLiti C0ffACf.................A. L. ILB3 203 444 5388 :::::::::::::
I' 4. LICtISID TIttB AL ?0 Nit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 411 :BILLSf0pt*
- 5. RAutFLAf t RAtlpG (GROSS 86t ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,253 IV 05173 :
L 6. DESIGI ILICf tlCAl, I AfilG ( plf IWE) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,153.6 :::::::::::::
( , 1, RAI! BOB DEFIRDAllt CATAClff (GROSS BWI)........................ 1,184.2
[ 8. BA!!I0E Dti!IDABLt CAlltiff (It! BWI).......................... 1,131.0
- 9. IF CEARGl$ 00001 AB0ft Slict LAST IIFO!!, !!AS0ES Alt... .. ...
I/A 10.POWIIlif!LTOWHICIIISit!Cf!P,IFAIT(plfput)...............R/A
- 11.!!AS0RFORttsfilCfl08,IFAlf...1/A B0ffi !!AtTODAft CC30LAfiftTODAft I
!!.10CISIIIIP0tf!BGFit!0D 745.0 1,216.0 30,912.0
- 13. ICE!!I0F100tS781!!ACTORWASCliflCAL 745.0 5,452.6 24,412.4 14.!!!Cf01!!S!!TtSIDTDONFB00tS 0.0 29.0 723.9 15,50015 Giltlif01OHLift 145.0 5,375.1 13,922.3 16.tilf!!SilftSEUtlat200t$ 0.0 0.0 0.0 17.GROSSfittlltIIIRGIGli!!ATID(EWI) 2,503,05!.0 17,651,552.0 79,199,693.4 18.GROSSELECillCAl,IllRGTGilllAftD(HWE) 858,645.0 6,019,186.5 27,219,180.0 19, 5tf ILICfilCAL tittGT G!st!Af tD (BWI) 823,719.5 5,737,981.9 26,016,243.8 20.DilfStiflCIFACf01 100.0 13.7 77.4 21.UlltATAILA!!LiffFACTOR 100.0 13.7 ff4
!!.DilfCAPAC!ffFACTOR(US!IGEDCE!!) 97.2 69.2 13.1
- 23. 071f CAPACiff FACf01 (DSlpG L!t Iff) 95.8 (8.2 13.0 I
- 14.DiffFORCID001AGIIAtt 0.0 8.0 9.2 25.011fFORCIDDVfAGIE00tS 0.0 468.2 2,416.2 SIOfDOWISSCIIDDLIDOft!I!!!S!!B0ifES(ff?!,IAft,ANDD0taf!050F1108).............
R/A IFC0it!NTLTSHUfDOWI,ISflElf!DStilf0PDAft. ..I/A L.
. ,.yg,. ,.v; .c ; v s- ;
, lg 0 ', '%' ,
, 4 s.-
Y, , , . - ' AVERAGE 1%ILY INIT KWER LEVEL ,
4 DOCKET NO. 50-423 ,
' (NIT tiilintnne tinit 3-
" ~
. . DATE 11-01-1932 f , OCHPLETED BY 1. L. ft.u.c tes.4441368'-
, W' f
[' !!KNTH OCTLTER, IRY AVERAG6 DAILY KMER LEVEL IRY- AVERAGE DAILY K MER LEVEL (MWE-NET) (MWE-!ET) '
i
,.1 1.130= 16 1.126- >
2 941 17 1.121 3 781 18 1.121 '
'4 1.124 -19 - 1 A84 5 1.124 20 1.123 6 1.12G 21 1.123 ,
7 __ 1 122 22 1.123 8- 1.125 23 1.122 , -
9 1.128 24- 1.125 10 '1.127 25 1.127 11 1.125 26 :1.127
' I- r - >
12 1.124 _ 27 1 125 13 1.124 28 1.127 t
14~ ~1.123 29 1.128 15- 1.124 30 1.127_
, 31 1.128 m
J 1
a
1 4
DOCKET NO. 50-423 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FL. 'Ix1uur 3 OCTOBER 193S_ DATE 1:.-02-89 COMPLETED BE A. EIMS TELEPHONE (203) 444-5388 No. Date Type Dura- Reason Method of Licensee System Component cause and Corrective (1) tion (2) Shut down Event Code Code Action to Prevent Hours Reactor (3) Rept No. Prevent Recurrence NONE 1: F- Forced S: Schedules 2: Reasons:
A-Equipment Failure (Explain) 3: Method 1-Manual 4: Exhibitfor Preparation of Data G - Instructions B-Maintenance or Test 2-Manual Scram Entry Sheets for Lic9nsee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-Ol61)
E-Operator Training 8: License Exam previous month F-Administrative 5-Power Reduction 5: Exhibit 1 - Same Source G-Operational Error (Explain) (Duration 9-Other =0 (Explain))
H-Other
, .. REPUELING INFORMATION REQUEST l e
c e, ,
OCTOBER 1989 ;
i l
- 1. Name of facility: Millstone 3.
- 2. Scheduled date for next refueling shutdown: '
November 17. 1990. i r
- 3. Scheduled date for restart following refueling: -
J,gnuary 15. 1991 l
- 4. Will refueling of resumption of operation thereafter require l a technical specification change or other license amendments?
H/A l
- 5. Scheduled date for submitting licensing action and supporting information. l ULhz
- 6. Important licensing considerations associated with refueling, l o.g., new of different fuel design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures:
HZA
- 7. The number of fuel assemblies (a) in the core and (b) in the '
spent fuel storage pool:
(a): 122, (b): 11.Q {
- 8. The present licensed spent fuel pool storage capacity and the sir.e of any increase in licensed storage capacity that han .
been requested or is planned, in number of fuel assemblios:
i Er9sent size - 756.
No increase reauested. ,
- 9. The projected date of the last refueling that can be dis-charged to the spent fuel pool assuming the present licensed capacity:
End of cycle 5.
t
__