ML19341D708: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 23: Line 23:
                                                                                               '' *    **0""*"*"'
                                                                                               '' *    **0""*"*"'
GEORGE L. ING ALLS                                                              JCSEPH R. SCHMIEDER vtCa CuaanMAN Posgcant
GEORGE L. ING ALLS                                                              JCSEPH R. SCHMIEDER vtCa CuaanMAN Posgcant
                                                                                                 ,        a cwaar RiCMARD M. F LY N N
                                                                                                 ,        a cwaar RiCMARD M. F LY N N RoSERr i. MitLoNzi                              April 3, 1981                      ,yp,=, e;*'**'^)",=y===v pRgggRICK R. CLARIC                              JPN-81-24                          ome==
                                                                                          ''"
RoSERr i. MitLoNzi                              April 3, 1981                      ,yp,=, e;*'**'^)",=y===v
* pRgggRICK R. CLARIC                              JPN-81-24                          ome==
THOMASR.FREY Director of Nuclear Reactor Regulation                                      ;',"gan(ca "aj,=,'"'
THOMASR.FREY Director of Nuclear Reactor Regulation                                      ;',"gan(ca "aj,=,'"'
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 s
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 s
Q '"'I /        g Attention:        Mr. Thomas A. Ippolito, Chief                  g        4=f (f 1
Q '"'I /        g Attention:        Mr. Thomas A. Ippolito, Chief                  g        4=f (f 1
Operating Reactors Branch No. 2                f; '                  y Division of Licensing                              .
Operating Reactors Branch No. 2                f; '                  y Division of Licensing                              .
                                                                                                                      .
g.
g.
                                                                                      -
pI L O y 79O k ~8
pI L O y 79O k ~8
                                                                                                                    -


==Subject:==
==Subject:==
Line 46: Line 40:
It should be pointed out that failure of a single pump in either the floor or equipment sump subsystems does not result in failure
It should be pointed out that failure of a single pump in either the floor or equipment sump subsystems does not result in failure
                         ~
                         ~
of monitoring of Reactor Coolant leakage.              The requested changes clarify that it is the equipmenc drain cump monitoring or the floor _ drain semp monitoring subsystems which must be operable, not both redundar t components of the subsystems, as stated in the current Technical Specifications.            The proposed changes are shown
of monitoring of Reactor Coolant leakage.              The requested changes clarify that it is the equipmenc drain cump monitoring or the floor _ drain semp monitoring subsystems which must be operable, not both redundar t components of the subsystems, as stated in the current Technical Specifications.            The proposed changes are shown in Attachment.I and the results of the Safety Evaluation are given in Attachmenc II.
'
in Attachment.I and the results of the Safety Evaluation are given in Attachmenc II.
The Authority has classified this application for amendment to the operating license as Class III.              Enclosed is a check
The Authority has classified this application for amendment to the operating license as Class III.              Enclosed is a check
       ~ 810408 0 DC>
       ~ 810408 0 DC>
1.-.-  ..
1.-.-  ..
                                            - - -                - - -  --
                                                                                  .  .                      .  .


        . .._- -  .    . . .
     ;. .      1 4
     ;. .      1 4
                                                        ,
in the amount of $4,000 as the filing fee per 10CFR 170.22, which the Authority paya under protest pending a final deter-mination of the legality of the fee schedule.
in the amount of $4,000 as the filing fee per 10CFR 170.22, which the Authority paya under protest pending a final deter-mination of the legality of the fee schedule.
1                                                        Very truly yours,
1                                                        Very truly yours, J)
                                                    '
J)
J. B.l4    Y%j Bayne s  Senior Vice President
J. B.l4    Y%j Bayne s  Senior Vice President
!                                                      ~ Nuclear Generation
!                                                      ~ Nuclear Generation
  ,
                       .cc:      Mr. J. Linville Resident Inspector P. O. Box 41 Lycoming, New York 13093 l
                       .cc:      Mr. J. Linville Resident Inspector P. O. Box 41 Lycoming, New York 13093 l
i t
i t
:
l
l
[
[
!
:
     ~
     ~
f k
f k
_ _ ,
_.  .E*-
_.  .E*-
_
g 1 --}}
g 1 --}}

Latest revision as of 08:04, 31 January 2020

Forwards Application to Amend App a of Ol,Changing Tech Specs Re Drywell Sump Monitoring Sys
ML19341D708
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/03/1981
From:
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML19341D709 List:
References
JPN-81-24, NUDOCS 8104080470
Download: ML19341D708 (2)


Text

y . 1 POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLUMeus CIRCLE NEW YORK. N. Y. loo 19 SERRY (2121 397.6200 G EOR,G,E T openanno crricae TRUSTEES JOHN w. SOSTQN JOHN S.CVSON

" "" Pos sea e o eteron

* **0""*"*"'

GEORGE L. ING ALLS JCSEPH R. SCHMIEDER vtCa CuaanMAN Posgcant

, a cwaar RiCMARD M. F LY N N RoSERr i. MitLoNzi April 3, 1981 ,yp,=, e;*'**'^)",=y===v pRgggRICK R. CLARIC JPN-81-24 ome==

THOMASR.FREY Director of Nuclear Reactor Regulation  ;',"gan(ca "aj,=,'"'

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 s

Q '"'I / g Attention: Mr. Thomas A. Ippolito, Chief g 4=f (f 1

Operating Reactors Branch No. 2 f; ' y Division of Licensing .

g.

pI L O y 79O k ~8

Subject:

James A. FitzPatrick Nuclear Power Plant sA Docket No. 50-333 u.* ga' ,D 99 Proposed Change to the Technical Specific s N Relating to Drywell Sump Monitoring System - h \h m

Dear Sir:

Enclosed for filing are three (3) signed originals and nineteen (19) copies of a document entitled, ." Application for Amendment to Operating License", together with forty (40) copies of Actachment I and II thereto, comprising a statement of the proposed changes to the Technical Specifications and the associated Safety Evaluation.

This application seeks to amend Appendix A of the operating License. This proposed change is requested in order to make 4.6.D and 3.6.D.2 on pages 141 and 142 consistent with the i Bases on page 151 of the Technical Specifications. The proposed change is also needed to clarify that the intent is to provide monitoring of Reactor Coolant leakage and the redundant monitoring is provided by the containment continuous monitoring systems.

It should be pointed out that failure of a single pump in either the floor or equipment sump subsystems does not result in failure

~

of monitoring of Reactor Coolant leakage. The requested changes clarify that it is the equipmenc drain cump monitoring or the floor _ drain semp monitoring subsystems which must be operable, not both redundar t components of the subsystems, as stated in the current Technical Specifications. The proposed changes are shown in Attachment.I and the results of the Safety Evaluation are given in Attachmenc II.

The Authority has classified this application for amendment to the operating license as Class III. Enclosed is a check

~ 810408 0 DC>

1.-.- ..

. . 1 4

in the amount of $4,000 as the filing fee per 10CFR 170.22, which the Authority paya under protest pending a final deter-mination of the legality of the fee schedule.

1 Very truly yours, J)

J. B.l4 Y%j Bayne s Senior Vice President

! ~ Nuclear Generation

.cc: Mr. J. Linville Resident Inspector P. O. Box 41 Lycoming, New York 13093 l

i t

l

[

~

f k

_. .E*-

g 1 --