ML19347B676: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:__  _    _. _._
{{#Wiki_filter:__  _    _. _._
k
k a    S f3 8 5
      .-
a    S f3 8 5
          -
2cco seccno..%.
2cco seccno..%.
N O M T.' @ u e22s                                              September 30, 1980 EF2-49,823 Mr. James C. Keppler Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Commission
N O M T.' @ u e22s                                              September 30, 1980 EF2-49,823 Mr. James C. Keppler Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road
    ,
799 Roosevelt Road
   .              Glen Ellyn, Illinois    60137
   .              Glen Ellyn, Illinois    60137
$               


==Subject:==
==Subject:==
Line 35: Line 29:
The final report on the non-seismic equipment installed over seismic                      ;
The final report on the non-seismic equipment installed over seismic                      ;
(reported per 50.55(e) requirements) cannot be submitted to you by Septem-                ,
(reported per 50.55(e) requirements) cannot be submitted to you by Septem-                ,
t.er 15,1980, as scheduled. This additional interim report is to provide                  l
t.er 15,1980, as scheduled. This additional interim report is to provide                  l you with the current status of this item.
                                                                                                          '
you with the current status of this item.
The problem was originally reported to Mr. J. Conklin of NRC Region III by Mr. R.W. Barr, Detroit Edison Project Quality Assurance Director, by tele-phone on January 18, 1980. It had been noted, at that tir.e, that non-seismic equipment was erected over and/or in close proximity to safety related equipment.
The problem was originally reported to Mr. J. Conklin of NRC Region III by Mr. R.W. Barr, Detroit Edison Project Quality Assurance Director, by tele-phone on January 18, 1980. It had been noted, at that tir.e, that non-seismic equipment was erected over and/or in close proximity to safety related equipment.
Edison Engineering has identified affected equipment as non-seismic pieces of HVAC duct located in the Reactor and Auxiliary Buildings. The problem                  I does not exist in the RHR complex, as all HVAC ductwork there has been seismically designed; nor does it exist in other Fermi 2 buildings such as the Turbine or Radwaste Buildings, as no safety related equipment is                  ;
Edison Engineering has identified affected equipment as non-seismic pieces of HVAC duct located in the Reactor and Auxiliary Buildings. The problem                  I does not exist in the RHR complex, as all HVAC ductwork there has been seismically designed; nor does it exist in other Fermi 2 buildings such as the Turbine or Radwaste Buildings, as no safety related equipment is                  ;
located there.                                                                            l Project Engineering has prepared a scope of work for the evaluation and                  i rectification of the duct, and this effort is now scheduled to begin some-
located there.                                                                            l Project Engineering has prepared a scope of work for the evaluation and                  i rectification of the duct, and this effort is now scheduled to begin some-time after January 1,1981.
                                                                                                          '
time after January 1,1981.
A final report should be submitted to you by March 16, 1981. If you have any questions concerning this matter, please contact Mr. H.A. Walker of our Construction Quality Assurance Organization.
A final report should be submitted to you by March 16, 1981. If you have any questions concerning this matter, please contact Mr. H.A. Walker of our Construction Quality Assurance Organization.
                                .
Very truly yours, b WW            /
Very truly yours, b WW            /
Edward Hines EH/ HAW /pn
Edward Hines EH/ HAW /pn
Line 50: Line 39:


     . b a
     . b a
Mr. James C. Keppler                        September 10, 1980 Page Two                                    EF2-49,823 cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Commission Washington D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Commission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan    48166
Mr. James C. Keppler                        September 10, 1980 Page Two                                    EF2-49,823 cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Commission Washington D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Commission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan    48166 l
              .
l 4
l l
i}}
4 i}}

Latest revision as of 01:54, 31 January 2020

Interim Deficiency Rept Re Nonseismic Equipment Installed Over Seismic.Edison Engineering Has Identified Affected Equipment as Nonseismic Pieces of Heating,Ventilation & Air Conditioning Duct.Final Rept Will Be Provided by 810316
ML19347B676
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/30/1980
From: Hines E
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-49-823, NUDOCS 8010150538
Download: ML19347B676 (2)


Text

__ _ _. _._

k a S f3 8 5

2cco seccno..%.

N O M T.' @ u e22s September 30, 1980 EF2-49,823 Mr. James C. Keppler Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road

. Glen Ellyn, Illinois 60137

Subject:

10CFR50.55(e) Report on Non-Seismic Equipment Installed Over Seismic. '

Dear Mr. Keppler:

l l

The final report on the non-seismic equipment installed over seismic  ;

(reported per 50.55(e) requirements) cannot be submitted to you by Septem- ,

t.er 15,1980, as scheduled. This additional interim report is to provide l you with the current status of this item.

The problem was originally reported to Mr. J. Conklin of NRC Region III by Mr. R.W. Barr, Detroit Edison Project Quality Assurance Director, by tele-phone on January 18, 1980. It had been noted, at that tir.e, that non-seismic equipment was erected over and/or in close proximity to safety related equipment.

Edison Engineering has identified affected equipment as non-seismic pieces of HVAC duct located in the Reactor and Auxiliary Buildings. The problem I does not exist in the RHR complex, as all HVAC ductwork there has been seismically designed; nor does it exist in other Fermi 2 buildings such as the Turbine or Radwaste Buildings, as no safety related equipment is  ;

located there. l Project Engineering has prepared a scope of work for the evaluation and i rectification of the duct, and this effort is now scheduled to begin some-time after January 1,1981.

A final report should be submitted to you by March 16, 1981. If you have any questions concerning this matter, please contact Mr. H.A. Walker of our Construction Quality Assurance Organization.

Very truly yours, b WW /

Edward Hines EH/ HAW /pn

" l Jo/T 8 Molsosas S,o 5 . _ _ _

. b a

Mr. James C. Keppler September 10, 1980 Page Two EF2-49,823 cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Commission Washington D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Commission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166 l