ML041820340: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Page 1 of 6 Appendix C   Job Performance Measure       Form ES-C-1       Worksheet  
{{#Wiki_filter:Appendix C                               Job Performance Measure                         Form ES-C-1 Worksheet Facility:   Davis-Besse ________ _                             Task No: _115-036-01-0100_________
 
Task Title: Calculate a Shutdown Margin with 2 Stuck Rods______________________________
Facility:     Davis-Besse ________ _     Task No: _115-036-01-0100_________
Task Title:   Calculate a Shutdown Margin with 2 Stuck Rods______________________________
K/A  
K/A  


==Reference:==
==Reference:==
001-A4.11 3.5/4.1   Job Performance Measure No: _RO A_
001-A4.11 3.5/4.1                               Job Performance Measure No: _RO A_
Examinee:                                   __     NRC Examiner: ___________________
Examinee:                             __                       NRC Examiner: ___________________
Facility Evaluator: ______________   Date: ___________________________                
Facility Evaluator: ______________                             Date: ___________________________
 
Method of testing:
Method of testing:
Simulated Performance _______________   Actual Performance ____X
Simulated Performance _______________                           Actual Performance ____X______
______  Classroom ________________ Simulator ______X_________ Plant ___________
Classroom ________________               Simulator ______X_________           Plant ___________
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: The Plant is in Mode 3 following a Reactor trip. Two control rods failed to insert on the Reactor trip. The START program is NOT available. The plant is at 100 EFPD, Boron Concentration is 2390 ppmB, Tave is 532ºF, Transient Poison Worth is -0.27% K/K, Reactivity worth of Anomaly is -0.13% K/K, Boron Correction Factor is 0.96.
Initial Conditions: The Plant is in Mode 3 following a Reactor trip. Two control rods failed to insert on the Reactor trip. The START program is NOT available. The plant is at 100 EFPD, Boron Concentration is 2390 ppmB, Tave is 532ºF, Transient Poison Worth is -0.27% K/K, Reactivity worth of Anomaly is -0.13% K/K, Boron Correction Factor is 0.96.
Task Standard: Calculate Shutdown Margin with 2 stuck control rods  
Task Standard: Calculate Shutdown Margin with 2 stuck control rods Required Materials: Calculator General  
 
Required Materials: Calculator General  


==References:==
==References:==
DB-NE-06202, Reactivity Balance Calculations, DB-NE-06201, Reactor Operators Curve Book, and Core Operating Limits Report  
DB-NE-06202, Reactivity Balance Calculations, DB-NE-06201, Reactor Operators Curve Book, and Core Operating Limits Report Initiating Cue: The Unit Supervisor directs you to perform a Shutdown Margin Calculation in accordance with DB-NE-06202, Reactivity Balance Calculations.
Time Critical Task: No Validation Time: 29 Minutes Page 1 of 6


Initiating Cue: The Unit Supervisor directs you to perform a Shutdown Margin Calculation in accordance with DB-NE-06202, Reactivity Balance Calculations.
Initiating Cue The Plant is in Mode 3 following a Reactor trip. Two control rods failed to insert on the Reactor trip. The START program is NOT available.
Time Critical Task: No  Validation Time: 29 Minutes Page 2 of 6 Initiating Cue The Plant is in Mode 3 following a Reactor trip. Two control rods failed to insert on the Reactor trip. The START program is NOT available. Burnup: 100 EFPD Boron Concentration: 2390 ppmB Tave: 532ºF. Transient Poison Worth: -0.27% K/K Reactivity worth of Anomaly: -0.13% K/K Boron Correction Factor: 0.96.  
Burnup: 100 EFPD Boron Concentration: 2390 ppmB Tave: 532ºF.
Transient Poison Worth: -0.27% K/K Reactivity worth of Anomaly: -0.13% K/K Boron Correction Factor: 0.96.
The Unit Supervisor directs you to perform a Shutdown Margin Calculation in accordance with DB-NE-06202, Reactivity Balance Calculations.
Page 2 of 6


The Unit Supervisor directs you to perform a Shutdown Margin Calculation in accordance with DB-NE-06202, Reactivity Balance Calculations.
PERFORMANCE INFORMATION (Denote critical steps with a check mark)
Page 3 of 6 PERFORMANCE INFORMATION (Denote critical steps with a check mark)
___________________________________________________________________________
___________________________________________________________________________
: 1. Performance Step: Determine minimum boron to ensure 1% K/K SDM. ____ Standard: From figure 6C, determine value of 2320 to 2340 ppmB and enter on Attachment 10.
: 1. Performance Step: Determine minimum boron to ensure 1% K/K SDM.
Comment: Actual value should be 2325 pmmB.  
____
 
Standard: From figure 6C, determine value of 2320 to 2340 ppmB and enter on Attachment 10.
Comment: Actual value should be 2325 pmmB.
____________________________________________________________________________
____________________________________________________________________________
: 2. Performance Step: Determine value of corrected boron concentration.
: 2. Performance Step: Determine value of corrected boron concentration.
____
____
Standard: Divide the RCS boron concentration (2325 ppmB) by the Boron Correction Factor (.96) to obtain a value of 2416 to 2438 ppmB.
Standard: Divide the RCS boron concentration (2325 ppmB) by the Boron Correction Factor
(.96) to obtain a value of 2416 to 2438 ppmB.
Comment: Actual value should be 2325 ppmB divided by 0.96 for a final value of 2422 ppmB.
Comment: Actual value should be 2325 ppmB divided by 0.96 for a final value of 2422 ppmB.
____________________________________________________________________________
____________________________________________________________________________
: 3. Performance Step: Enter the value of Reactivity Worth Anomaly.
: 3. Performance Step: Enter the value of Reactivity Worth Anomaly.
____ Standard: Enter a value of -0.13 %K/K, from the initial conditions.
____
Standard: Enter a value of -0.13 %K/K, from the initial conditions.
Comment: None
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 4. Performance Step: Determine corrected RCS boron concentration.  
: 4. Performance Step: Determine corrected RCS boron concentration.
 
____
____  Standard: Multiply the RCS boron of 2390 ppmB by the Boron Correction Factor of 0.96 for a final value of 2294.4 ppmB.  
Standard: Multiply the RCS boron of 2390 ppmB by the Boron Correction Factor of 0.96 for a final value of 2294.4 ppmB.
 
Comment: None
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 5. Performance Step: Determine Differential Boron Worth
: 5. Performance Step: Determine Differential Boron Worth
____ Standard: From Figure 5A determine a value of -0.00612 to -0.00616 %K/K/ppmB using the corrected RCS boron concentration of 2294.4 ppmB and enter on Attachment 10.
____
Standard: From Figure 5A determine a value of -0.00612 to -0.00616 %K/K/ppmB using the corrected RCS boron concentration of 2294.4 ppmB and enter on Attachment 10.
Comment: Actual value of -.00614 %K/K/ppmB.
Comment: Actual value of -.00614 %K/K/ppmB.
____________________________________________________________________________
____________________________________________________________________________
Page 4 of 6
Page 3 of 6
 
____________________________________________________________________________
____________________________________________________________________________
: 6. Performance Step: Determine the corrected Anomaly Worth
: 6. Performance Step: Determine the corrected Anomaly Worth
____ Standard: Divide the Reactivity Worth Anomaly (-0.13 %K/K) by the Differential Boron Worth (-0.00612 to -0.00616 %K/K/ppmB) to obtain a value of 21.1 to 21.3 Comment: Actual value of 21.17  
____
 
Standard: Divide the Reactivity Worth Anomaly (-0.13 %K/K) by the Differential Boron Worth (-
0.00612 to -0.00616 %K/K/ppmB) to obtain a value of 21.1 to 21.3 Comment: Actual value of 21.17
____________________________________________________________________________
____________________________________________________________________________
: 7. Performance Step: Determine Transient Poison Boron Equivalent
: 7. Performance Step: Determine Transient Poison Boron Equivalent
____
____
Standard: Multiply Transient Poison Worth (-0.27) and Transient Poison Conversion Factor (85) then divide by the Boron Correction Factor (.96) to obtain a value of 23.9. Enter on Attachment 10. Comment: None
Standard: Multiply Transient Poison Worth (-0.27) and Transient Poison Conversion Factor (85) then divide by the Boron Correction Factor (.96) to obtain a value of 23.9. Enter on Attachment 10.
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 8. Performance Step: Determine minimum boron concentration to ensure 1% Shutdown Valve.
: 8. Performance Step: Determine minimum boron concentration to ensure 1% Shutdown Valve.
____ Standard: Calculate minimum boron for 1% SDV on Attachment 10 to obtain a value of 2274 to 2285 ppmB.  
____
 
Standard: Calculate minimum boron for 1% SDV on Attachment 10 to obtain a value of 2274 to 2285 ppmB.
Comment: Actual value of 2377 ppmB.
Comment: Actual value of 2377 ppmB.
____________________________________________________________________________
____________________________________________________________________________
Terminating Cues: This JPM is complete.
Terminating Cues: This JPM is complete.
 
Page 4 of 6
Page 5 of 6 VERIFICATION OF COMPLETION Job Performance Measure No. ____RO  A
______  Examinee's Name:                       
 
Examiner's Name:


VERIFICATION OF COMPLETION Job Performance Measure No. ____RO A______
Examinee's Name:
Examiner's Name:
Date performed:
Date performed:
Facility Evaluator:
Facility Evaluator:
Number of attempts:  
Number of attempts:
 
Time to complete:
Time to complete:  
 
Question Documentation:
Question Documentation:
Question:____________________________________________________________________
Question:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Response:___________________________________________________________________
Response:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Result: SAT or UNSAT Examiner's signature and date: _______________________________   __________
Result: SAT or UNSAT  
Page 5 of 6
 
Examiner's signature and date: _______________________________     __________  


Page 6 of 6 JPM RO A Simulator Instructions If performed on the simulator, this JPM can setup at any IC
JPM RO A Simulator Instructions If performed on the simulator, this JPM can setup at any IC Page 6 of 6


Page 1 of 8 Appendix C   Job Performance Measure       Form ES-C-1       Worksheet  
Appendix C                               Job Performance Measure                         Form ES-C-1 Worksheet Facility:   Davis-Besse ________ _                             Task No: _119-004-03-0400_________
 
Task Title: Control of Locked Valves During Post-Maintenance Testing______________________
Facility:     Davis-Besse ________ _     Task No: _119-004-03-0400_________
Task Title:   Control of Locked Valves During Post-Maintenance Testing______________________
K/A  
K/A  


==Reference:==
==Reference:==
GEN 2.2.12 3.0/3.4     Job Performance Measure No: _RO C Examinee:                                   __     NRC Examiner: ___________________
GEN 2.2.12 3.0/3.4                               Job Performance Measure No: _RO C Examinee:                             __                       NRC Examiner: ___________________
Facility Evaluator: ______________   Date: ___________________________                
Facility Evaluator: ______________                             Date: ___________________________
 
Method of testing:
Method of testing:
Simulated Performance ______X________   Actual Performance __________
Simulated Performance ______X________                           Actual Performance __________
Classroom ________________ Simulator _______X_________ Plant __________
Classroom ________________               Simulator _______X_________         Plant __________
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.  
Initial Conditions: Maintenance has completed a packing adjustment on valve DH2736, DH Aux.
 
Spray Throttle Valve, to stop a packing leak per Order 200001155.
Task Standard: Stroke and time DH2736 and make the appropriate locked valve log entries.
Task Standard: Stroke and time DH2736 and make the appropriate locked valve log entries.
Required Materials: Pump and Valve Basis Document, Stop watch and Locked Valve Log  
Required Materials: Pump and Valve Basis Document, Stop watch and Locked Valve Log General


General
==References:==
DB-PF-03272, Post Maintenance Valve Test, DB-OP-00008, Operation and Control of Locked Valves Initiating Cue: The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve.
An equipment operator is standing by in the Auxiliary Building.
The Locked Valve Log is in the Control Room.
The Shift Manager has completed the first 8 columns in the Locked Valve Log.
Time Critical Task: No Validation Time: 25 Minutes Page 1 of 8


==References:==
Initiating Cues Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.
DB-PF-03272, Post Maintenance Valve Test, DB-OP-00008, Operation and Control of Locked Valves Initiating Cue: The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete  The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve. An equipment operator is standing by in the Auxiliary Building. The Locked Valve Log is in the Control Room. The Shift Manager has completed the first 8 columns in the Locked Valve Log.
The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2.
Time Critical Task: No  Validation Time: 25 Minutes Page 2 of 8 Initiating Cues Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.
DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve.
The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve. An equipment operator is standing by in the Auxiliary Building. The Locked Valve Log is in the Control Room.
An equipment operator is standing by in the Auxiliary Building.
The Locked Valve Log is in the Control Room.
The Shift Manager has completed the first 8 columns in the Locked Valve Log.
The Shift Manager has completed the first 8 columns in the Locked Valve Log.
Page 3 of 8 PERFORMANCE INFORMATION (Denote critical steps with a check mark)
Page 2 of 8
 
PERFORMANCE INFORMATION (Denote critical steps with a check mark)
____________________________________________________________________________
____________________________________________________________________________
: 1. Performance step: Complete section 3.2 of DB-PF-03272                                                      
: 1. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Check Verify section 3.1 is complete Comment: None
 
Standard: Check Verify section 3.1 is complete Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 2. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Verify a RWP is available Comment: None Cue: (If asked) A special RWP is not required for this test.
: 2. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Verify a RWP is available Comment: None Cue: (If asked) A special RWP is not required for this test.
____________________________________________________________________________
____________________________________________________________________________
: 3. Performance step: Obtain stroke times from the Pump and Valve Basis Document and record on Attachment 2  
: 3. Performance step: Obtain stroke times from the Pump and Valve Basis Document and record on Attachment 2
 
____
____
Standard: Enter the maximum close time of 59.70 seconds, the maximum open time of 59.62 seconds, the expected close time range of 33.83 seconds to 45.77 seconds and the expected open time range of 33.78 seconds to 45.71 seconds in step 3.2.3 of DB-PF-03272
Standard: Enter the maximum close time of 59.70 seconds, the maximum open time of 59.62 seconds, the expected close time range of 33.83 seconds to 45.77 seconds and the expected open time range of 33.78 seconds to 45.71 seconds in step 3.2.3 of DB-PF-03272 Comment: None
 
____________________________________________________________________________
Comment: None
: 4. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Obtain Shift Manager's permission to perform the test Comment: None Cue: (If asked) the Shift Manager has given permission to stroke test DH 2736
____________________________________________________________________________
____________________________________________________________________________
: 4. Performance step: Complete section 3.2 of DB-PF-03272                                                     
: 5. Performance step: Record test equipment data Standard: Record the M&TE number for the stopwatch and the calibration due date Comment: None Cue: (If asked) A special DB-OP-00016 lineup is NOT required
 
Standard: Obtain Shift Manager's permission to perform the test Comment: None Cue: (If asked) the Shift Manager has given permission to stroke test DH 2736
____________________________________________________________________________
____________________________________________________________________________
: 5. Performance step: Record test equipment data Standard: Record the M&TE number for the stopwatch and the calibration due date                                         
Page 3 of 8
 
Comment: None Cue: (If asked) A special DB-OP-00016 lineup is NOT required
____________________________________________________________________________


Page 4 of 8
____________________________________________________________________________
____________________________________________________________________________
: 6. Performance step: Verity the Equipment Operator is at DH 2736 Standard: Communicate via GAI-TRONICS or radio
: 6. Performance step: Verity the Equipment Operator is at DH 2736 Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: An Equipment Operator is standing by to verify local valve position
 
Comment: None Cue: An Equipment Operator is standing by to verify local valve position
____________________________________________________________________________
____________________________________________________________________________
: 7. Performance step: Stoke DH 2736 open and record time
: 7. Performance step: Stoke DH 2736 open and record time
____ Standard: Depress and hold the OPEN pushbutton and stroke time using the stopwatch. Record the stroke time.
____
Standard: Depress and hold the OPEN pushbutton and stroke time using the stopwatch. Record the stroke time.
Comment: DH 2736 is a throttle valve, which requires the OPEN pushbutton to be depressed while the valve is stroking DH 2736 will stroke faster than the expected time.
Comment: DH 2736 is a throttle valve, which requires the OPEN pushbutton to be depressed while the valve is stroking DH 2736 will stroke faster than the expected time.
____________________________________________________________________________
____________________________________________________________________________
: 8. Performance step: Contact the Equipment Operator to check local indication                                                
: 8. Performance step: Contact the Equipment Operator to check local indication Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is open
 
Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is open
____________________________________________________________________________
____________________________________________________________________________
: 9. Performance step: Complete the "Position To" column in the Locked Valve Log
: 9. Performance step: Complete the "Position To" column in the Locked Valve Log
____ Standard: Enter "Open" Comment: The Locked Valve Log may be updated after the stoke test is complete
____
Standard: Enter "Open" Comment: The Locked Valve Log may be updated after the stoke test is complete
____________________________________________________________________________
____________________________________________________________________________
: 10. Performance step: Complete the "Position By" column in the Locked Valve Log
: 10. Performance step: Complete the "Position By" column in the Locked Valve Log
____ Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete
____
Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete
____________________________________________________________________________
Page 4 of 8


____________________________________________________________________________
Page 5 of 8
____________________________________________________________________________
____________________________________________________________________________
: 11. Performance step: Stoke DH 2736 closed and record time
: 11. Performance step: Stoke DH 2736 closed and record time
____ Standard: Depress and hold the CLOSED pushbutton and stroke time using the stopwatch.
____
Standard: Depress and hold the CLOSED pushbutton and stroke time using the stopwatch.
Record the stroke time.
Record the stroke time.
Comment: None
Comment: None
Line 195: Line 189:
____________________________________________________________________________
____________________________________________________________________________
: 13. Performance step: Complete the "Restored By" column in the Locked Valve Log
: 13. Performance step: Complete the "Restored By" column in the Locked Valve Log
____ Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete
____
Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete
____________________________________________________________________________
____________________________________________________________________________
: 14. Performance step: Recognize the stroke times are not within the expected times Standard: Compare valve stroke times to the expected range of stroke times
: 14. Performance step: Recognize the stroke times are not within the expected times Standard: Compare valve stroke times to the expected range of stroke times Comment: None
 
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 15. Performance step: Restoke DH 2736 and record times
: 15. Performance step: Restoke DH 2736 and record times
____ Standard: Recognize the test requires the valve to be stroke timed a second time Comment: None  
____
Standard: Recognize the test requires the valve to be stroke timed a second time Comment: None Cue: DH 2736 has been stroked open and closed a second time. The stroke times are the same as recorded in step 4.2.2
____________________________________________________________________________
Page 5 of 8


Cue: DH 2736 has been stroked open and closed a second time. The stroke times are the same as recorded in step 4.2.2
____________________________________________________________________________
Page 6 of 8
____________________________________________________________________________
____________________________________________________________________________
: 16. Performance step: Inform the Unit Supervisor or Shift Manager the stroke times are not with in the expected range
: 16. Performance step: Inform the Unit Supervisor or Shift Manager the stroke times are not with in the expected range
____
____
Standard: Communicate to a shift SRO the need to write a Condition Report and perform an Operability Justification Comment: None Cue: The Shift Manager will write the Condition Report and document the Operability Justification  
Standard: Communicate to a shift SRO the need to write a Condition Report and perform an Operability Justification Comment: None Cue: The Shift Manager will write the Condition Report and document the Operability Justification
 
____________________________________________________________________________
____________________________________________________________________________
: 17. Performance step: Complete acceptance criteria
: 17. Performance step: Complete acceptance criteria
____
____
Standard: Sign off steps 5.2 and 5.3 Comment: None
Standard: Sign off steps 5.2 and 5.3 Comment: None
____________________________________________________________________________  
____________________________________________________________________________
 
Terminating Cue: This JPM is complete Page 6 of 8
Terminating Cue: This JPM is complete Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No. ____RO  C
______  Examinee's Name:                       
 
Examiner's Name:


VERIFICATION OF COMPLETION Job Performance Measure No. ____RO C______
Examinee's Name:
Examiner's Name:
Date performed:
Date performed:
Facility Evaluator:
Facility Evaluator:
Number of attempts:  
Number of attempts:
 
Time to complete:
Time to complete:  
 
Question Documentation:
Question Documentation:
Question:____________________________________________________________________
Question:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Response:___________________________________________________________________
Response:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Result: SAT or UNSAT Examiner's signature and date: _______________________________    __________
Result: SAT or UNSAT  
Page 7 of 8


Examiner's signature and date:  _______________________________    __________
JPM RO C Simulator Instructions Setup the simulator to any Mode 1, 2, or 3 IC at NOP and NOT.
Page 8 of 8


Page 8 of 8 JPM RO  C Simulator Instructions Setup the simulator to any Mode 1, 2, or 3 IC at NOP and NOT.
Appendix C                               Job Performance Measure                         Form ES-C-1 Worksheet Facility:   Davis-Besse ________ _                             Task No: _071-001-02-0100_________
Page 1 of 7 Appendix C   Job Performance Measure       Form ES-C-1       Worksheet  
Task Title: Containment Pressure Reduction Release___________________________________
 
Facility:     Davis-Besse ________ _     Task No: _071-001-02-0100_________
Task Title:   Containment Pressure Reduction Release___________________________________
K/A  
K/A  


==Reference:==
==Reference:==
GEN 2.3.11 2.7/3.2     Job Performance Measure No: _RO D Examinee:                                   __     NRC Examiner: ___________________
GEN 2.3.11 2.7/3.2                               Job Performance Measure No: _RO D Examinee:                             __                       NRC Examiner: ___________________
Facility Evaluator: ______________   Date: ___________________________                
Facility Evaluator: ______________                             Date: ___________________________
 
Method of testing:
Method of testing:
Simulated Performance _______________   Actual Performance __________
Simulated Performance _______________                           Actual Performance __________
Classroom ________________ Simulator ________________ Plant __________  
Classroom ________________               Simulator ________________           Plant __________
 
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H 2O. A release permit has been prepared and approved.
Initial Conditions: A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H2O. A release permit has been prepared and approved.
Task Standard: Initiate a pressure release of Containment and stop the Containment release when the Main Station Exhaust Fans are found not running.
Task Standard: Initiate a pressure release of Containment and stop the Containment release when the Main Station Exhaust Fans are found not running.
Required Materials: None General  
Required Materials: None General  


==References:==
==References:==
DB-OP-03012, Radioactive Gaseous Batch Release Initiating Cue: The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.8 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction.
DB-OP-03012, Radioactive Gaseous Batch Release Initiating Cue: The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.8 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction.
Time Critical Task: No Validation Time: 15 Minutes  
Time Critical Task: No Validation Time: 15 Minutes Page 1 of 7


Page 2 of 7 Initiating Cues A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H 2 O. A release permit has been prepared and approved.  
Initiating Cues A plant heatup is in progress.
Containment to annulus differential pressure has risen to 20 inches H2O.
A release permit has been prepared and approved.
The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.8 of DB-OP-03012, Radioactive Gaseous Batch Release.
An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction.
Page 2 of 7


The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.8 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction.
PERFORMANCE INFORMATION (Denote critical steps with a check mark)
Page 3 of 7 PERFORMANCE INFORMATION (Denote critical steps with a check mark)
____________________________________________________________________________
____________________________________________________________________________
: 1. Performance step: Place computer point P318 on trend                                                    
: 1. Performance step: Place computer point P318 on trend
 
____
____  Standard: Use the plant process computer to trend CTMT PRESS DIFF TO ANNULUS Comment: Exceptable to trend on the computer CRT or on the analog trend pens
Standard: Use the plant process computer to trend CTMT PRESS DIFF TO ANNULUS Comment: Exceptable to trend on the computer CRT or on the analog trend pens Cue: P318 reads 20 inches. (If asked) The Unit Supervisor requests a 60-second trend
 
Cue: P318 reads 20 inches. (If asked) The Unit Supervisor requests a 60-second trend
____________________________________________________________________________
____________________________________________________________________________
: 2. Performance step: Request the Shift Manager approval of the release
: 2. Performance step: Request the Shift Manager approval of the release
Line 283: Line 269:
Standard: Communicate with the Shift Manager Comment: Role play as the Shift Manager to sign and date Item 4.l on Attachment 1 of DB-OP-03012
Standard: Communicate with the Shift Manager Comment: Role play as the Shift Manager to sign and date Item 4.l on Attachment 1 of DB-OP-03012
____________________________________________________________________________
____________________________________________________________________________
: 3. Performance step: Verify less than 24 hours since containment was sampled Standard: Determine difference is less than 24 hours between containment sample time in Item 4.e of Attachment 1 and current time  
: 3. Performance step: Verify less than 24 hours since containment was sampled Standard: Determine difference is less than 24 hours between containment sample time in Item 4.e of Attachment 1 and current time Comment: None
 
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 4. Performance step: Open CV5037, H2 Purge System Ctmt Isolation
: 4. Performance step: Open CV5037, H2 Purge System Ctmt Isolation
 
____
____  Standard: Press OPEN on HIS5037 Comment: Role play to provide the Independent Verification for opening CV 5037  
Standard: Press OPEN on HIS5037 Comment: Role play to provide the Independent Verification for opening CV 5037
 
____________________________________________________________________________
____________________________________________________________________________
: 5. Performance step: Open CV5038, H2 Purge System Ctmt Isolation
: 5. Performance step: Open CV5038, H2 Purge System Ctmt Isolation
____ Standard: Press OPEN on HIS5038  
____
Standard: Press OPEN on HIS5038 Comment: Role play to provide the Independent Verification for opening CV 5038
____________________________________________________________________________
Page 3 of 7


Comment: Role play to provide the Independent Verification for opening CV 5038
____________________________________________________________________________
Page 4 of 7
____________________________________________________________________________
____________________________________________________________________________
: 6. Performance step: Direct the Equipment Operator to open the containment release skid discharge gate, to start the skid fan and to maintain flow rate at approximately 1400 on the M&TE anemometer readout.
: 6. Performance step: Direct the Equipment Operator to open the containment release skid discharge gate, to start the skid fan and to maintain flow rate at approximately 1400 on the M&TE anemometer readout.
____ Standard: Communicate via the GAI-TRONICS or radio Comment: May direct the Equipment Operator to perform steps 4.6.13, 4.6.14 and 4.6.15.
____
Cue: The Equipment Operator reports steps 4.6.13, 4.6.14 and 4.6.15 are complete. Step 4.6.13 has been independently verified. Skid flow rate is 1400 on the local anemometer.  
Standard: Communicate via the GAI-TRONICS or radio Comment: May direct the Equipment Operator to perform steps 4.6.13, 4.6.14 and 4.6.15.
 
Cue: The Equipment Operator reports steps 4.6.13, 4.6.14 and 4.6.15 are complete. Step 4.6.13 has been independently verified. Skid flow rate is 1400 on the local anemometer.
____________________________________________________________________________
____________________________________________________________________________
: 7. Performance step: Make a Unit Log entry Standard: Record start time, release permit number and containment to annulus differential pressure in the Unit Log Comment: None Cue: The secondary side Reactor Operator has made Unit Log entry for release start time, release permit number and containment to annulus differential pressure
: 7. Performance step: Make a Unit Log entry Standard: Record start time, release permit number and containment to annulus differential pressure in the Unit Log Comment: None Cue: The secondary side Reactor Operator has made Unit Log entry for release start time, release permit number and containment to annulus differential pressure
____________________________________________________________________________
____________________________________________________________________________
: 8. Performance step: Update the release permit                                                    
: 8. Performance step: Update the release permit Standard: Record start date and time and containment to annulus P in Item 6 of Attachment 1 Comment: After the release is started an Equipment Operator will contact the Control Room to report that the Main Station Exhaust Fans are not running Cue: This is the Zone 3 Equipment Operator. I am in Fan Alley. Neither one of the Main Station Exhaust Fans are running.
 
____________________________________________________________________________
Standard: Record start date and time and containment to annulus P in Item 6 of Attachment 1 Comment: After the release is started an Equipment Operator will contact the Control Room to report that the Main Station Exhaust Fans are not running Cue: This is the Zone 3 Equipment Operator. I am in Fan Alley. Neither one of the Main Station Exhaust Fans are running.                                                                  
: 9. Performance step: Recognize the release should be stopped
 
____
Standard: Communicate to the Equipment Operator the need to stop the Containment Pressure Release Skid Fan Comment: None Cue: The Containment Pressure Release Skid Fan has been stopped.
____________________________________________________________________________
____________________________________________________________________________
: 9. Performance step: Recognize the release should be stopped                                                     
Page 4 of 7


____  Standard: Communicate to the Equipment Operator the need to stop the Containment Pressure Release Skid Fan Comment: None Cue: The Containment Pressure Release Skid Fan has been stopped.
____________________________________________________________________________
____________________________________________________________________________
Page 5 of 7
: 10. Performance step: Close CV5037, H2 Purge System Ctmt Isolation
____
Standard: Press CLOSE on HIS5037 Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 10. Performance step: Close CV5037, H2 Purge System Ctmt Isolation
: 11. Performance step: Close CV5038, H2 Purge System Ctmt Isolation
____ Standard: Press CLOSE on HIS5037                                                     
____
 
Standard: Press CLOSE on HIS5038 Comment: None
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 11. Performance step: Close CV5038, H2 Purge System Ctmt Isolation 
: 12. Performance step: Notify the Shift Manager the release has been stopped Standard: Communicate with the Shift Manager Comment: None Cue: The Shift Manager acknowledges the Containment Pressure Reduction Release has been stopped.
 
____  Standard: Press CLOSE on HIS5038 Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 12. Performance step: Notify the Shift Manager the release has been stopped Standard: Communicate with the Shift Manager Comment: None
Terminating Cue: This JPM is complete Page 5 of 7
 
Cue: The Shift Manager acknowledges the Containment Pressure Reduction Release has been stopped.
____________________________________________________________________________
 
Terminating Cue: This JPM is complete  
 
Page 6 of 7 VERIFICATION OF COMPLETION Job Performance Measure No. _RO  D
_______  Examinee's Name:                       
 
Examiner's Name:


VERIFICATION OF COMPLETION Job Performance Measure No. _RO D_______
Examinee's Name:
Examiner's Name:
Date performed:
Date performed:
Facility Evaluator:
Facility Evaluator:
Number of attempts:  
Number of attempts:
 
Time to complete:
Time to complete:  
 
Question Documentation:
Question Documentation:
Question:____________________________________________________________________
Question:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Response:___________________________________________________________________
Response:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Result: SAT or UNSAT Examiner's signature and date: _______________________________   __________
Result: SAT or UNSAT  
Page 6 of 7
 
Examiner's signature and date: _______________________________     __________
Page 7 of 7 JPM RO  D Simulator Instructions Setup the simulator in a Mode 3, NOP, NOT IC.
Raise Containment pressure to 20 inches.


JPM RO D Simulator Instructions Setup the simulator in a Mode 3, NOP, NOT IC.
Raise Containment pressure to 20 inches.
Fail Computer Point P318 to 20 inches.
Fail Computer Point P318 to 20 inches.
Page 1 of 7 Appendix C    Job Performance Measure      Form ES-C-1      Worksheet
Page 7 of 7


Facility:     Davis-Besse ________ _     Task No: _000-080-05-0100_________
Appendix C                              Job Performance Measure                          Form ES-C-1 Worksheet Facility:   Davis-Besse ________ _                             Task No: _000-080-05-0100_________
Task Title:    Offsite Dose Assessment Using a Nomogram________________________________
Task Title:    Offsite Dose Assessment Using a Nomogram________________________________
K/A  
K/A  


==Reference:==
==Reference:==
GEN 2.4.39 3.3/3.1   Job Performance Measure No: _RO E Examinee:                                   __     NRC Examiner: ___________________
GEN 2.4.39 3.3/3.1                               Job Performance Measure No: _RO E Examinee:                             __                       NRC Examiner: ___________________
Facility Evaluator: ______________   Date: ___________________________                
Facility Evaluator: ______________                             Date: ___________________________
 
Method of testing:
Method of testing:
Simulated Performance _______________   Actual Performance _____X
Simulated Performance _______________                           Actual Performance _____X____
____  Classroom ________________ Simulator ________X_______ Plant __________
Classroom ________________               Simulator ________X_______           Plant __________
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Initial Conditions: The reactor has been tripped due to an unisolable steam leak on Steam Generator 2. Steam Generator 2 is at 0 psig. SFRCS has actuated and both Auxiliary Feedwater Pumps Turbines (AFPT) are running. After Steam Generator 2 depressurized, a tube leak developed in Steam Generator 1. An RCS cooldown to 500 ºF is in progress using Atmospheric Vent Valve 1(AVV). The Safety Parameter Display System (SPDS) terminals are not available. Lower T is +1.0 ºF. Wind speed is 8 MPH. RE 609 is reading 4 X 10 5 CPM. Task Standard: Using a nomogram, determine the off-site TEDE dose levels at the site boundary, the two mile, the five mile and the ten mile limits.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: The reactor has been tripped due to an unisolable steam leak on Steam Generator 2. Steam Generator 2 is at 0 psig. SFRCS has actuated and both Auxiliary Feedwater Pumps Turbines (AFPT) are running. After Steam Generator 2 depressurized, a tube leak developed in Steam Generator 1. An RCS cooldown to 500 ºF is in progress using Atmospheric Vent Valve 1(AVV). The Safety Parameter Display System (SPDS) terminals are not available. Lower T is +1.0 ºF. Wind speed is 8 MPH. RE 609 is reading 4 X 105 CPM.
Task Standard: Using a nomogram, determine the off-site TEDE dose levels at the site boundary, the two mile, the five mile and the ten mile limits.
Required Materials: Straightedge or ruler, calculator General  
Required Materials: Straightedge or ruler, calculator General  


==References:==
==References:==
RA-EP-02240, Offsite Dose Assessment, and Offsite Dose Assessment Nomogram Initiating Cue: The Shift Manager directs you to calculate a projected offsite Total Effective Dose Equivalent (TEDE) rate using the offsite dose assessment nomogram in accordance with RA-EP-02240, Offsite Dose Assessment.
RA-EP-02240, Offsite Dose Assessment, and Offsite Dose Assessment Nomogram Initiating Cue: The Shift Manager directs you to calculate a projected offsite Total Effective Dose Equivalent (TEDE) rate using the offsite dose assessment nomogram in accordance with RA-EP-02240, Offsite Dose Assessment.
Time Critical Task: No Validation Time: 13 Minutes Page 2 of 7 Initiating Cues The reactor has been tripped due to an unisolable steam leak on Steam Generator 2. Steam Generator 2 is at 0 psig. SFRCS has actuated and both Auxiliary Feedwater Pumps Turbines (AFPT) are running. After Steam Generator 2 depressurized, a tube leak developed in Steam Generator 1.
Time Critical Task: No Validation Time: 13 Minutes Page 1 of 7
An RCS cooldown to 500 ºF is in progress using Atmospheric Vent Valve 1(AVV). The Safety Parameter Display System (SPDS) terminals are not available. Lower T is +1.0 ºF Wind speed is 8 MPH RE 609 is reading 4 X 10 5 CPM  The Shift Manager directs you to calculate a projected offsite Total Effective Dose Equivalent (TEDE) rate using the offsite dose assessment nomogram in accordance with RA-EP-02240, Offsite Dose Assessment.
Page 3 of 7 PERFORMANCE INFORMATION (Denote critical steps with a check mark)
____________________________________________________________________________
: 1. Performance step: Determine the release pathway                                                     


Standard: Determine the release pathway is from both AFPT exhausts and from AVV 1 Comment: The flow rates for both AFPTs and AVV 1 can be added together or the TEDE rates for each of the flow paths can be added together 
Initiating Cues The reactor has been tripped due to an unisolable steam leak on Steam Generator 2.
Steam Generator 2 is at 0 psig.
SFRCS has actuated and both Auxiliary Feedwater Pumps Turbines (AFPT) are running.
After Steam Generator 2 depressurized, a tube leak developed in Steam Generator 1.
An RCS cooldown to 500 ºF is in progress using Atmospheric Vent Valve 1(AVV).
The Safety Parameter Display System (SPDS) terminals are not available.
Lower T is +1.0 ºF Wind speed is 8 MPH RE 609 is reading 4 X 105 CPM The Shift Manager directs you to calculate a projected offsite Total Effective Dose Equivalent (TEDE) rate using the offsite dose assessment nomogram in accordance with RA-EP-02240, Offsite Dose Assessment.
Page 2 of 7


PERFORMANCE INFORMATION (Denote critical steps with a check mark)
____________________________________________________________________________
____________________________________________________________________________
: 2. Performance step: Locates the procedural guidance Standard: Identifies Attachment 2 of RA-EP-02240, Offsite Dose Assessment, as correct procedural guidance  
: 1. Performance step: Determine the release pathway Standard: Determine the release pathway is from both AFPT exhausts and from AVV 1 Comment: The flow rates for both AFPTs and AVV 1 can be added together or the TEDE rates for each of the flow paths can be added together
 
____________________________________________________________________________
Comment: None
: 2. Performance step: Locates the procedural guidance Standard: Identifies Attachment 2 of RA-EP-02240, Offsite Dose Assessment, as correct procedural guidance Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 3. Performance step: Obtain a Nomogram                                                      
: 3. Performance step: Obtain a Nomogram Standard: Obtain a Nomogram Comment: None
 
Standard: Obtain a Nomogram Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 4. Performance step: Record name, date and time on nomogram Standard: Write the information on the nomogram Comment: None  
: 4. Performance step: Record name, date and time on nomogram Standard: Write the information on the nomogram Comment: None
 
____________________________________________________________________________
____________________________________________________________________________
: 5. Performance step: Plot the radiation monitor reading
: 5. Performance step: Plot the radiation monitor reading
____
____
Standard: From initial conditions, plot RE 609 reading of 4 X 10 5 CPM on scale B Comment: None
Standard: From initial conditions, plot RE 609 reading of 4 X 105 CPM on scale B Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 6. Performance step: Plot the flow rate
: 6. Performance step: Plot the flow rate
____ Standard: Mark a flow rate of 5 to 6 KCFM on scale A Comment: Actual value is 5.06 KCFM. 0.33 KCFM for each AFPT and 4.4 KCFM for the AVV.
____
____________________________________________________________________________  
Standard: Mark a flow rate of 5 to 6 KCFM on scale A Comment: Actual value is 5.06 KCFM. 0.33 KCFM for each AFPT and 4.4 KCFM for the AVV.
____________________________________________________________________________
Page 3 of 7


Page 4 of 7
____________________________________________________________________________
____________________________________________________________________________
: 7. Performance step: Plot the release rate
: 7. Performance step: Plot the release rate
____ Standard: Draw a line from scale B to scale A to obtain a release rate of 10 to 20 Curries/sec                          
____
 
Standard: Draw a line from scale B to scale A to obtain a release rate of 10 to 20 Curries/sec Comment: Actual release rate value is 12 Curries/sec
Comment: Actual release rate value is 12 Curries/sec
____________________________________________________________________________
____________________________________________________________________________
: 8. Performance step: Plot the lower T ____ Standard: From initial conditions, plot lower T of +1.0 ºF on scale 1.
: 8. Performance step: Plot the lower T
____
Standard: From initial conditions, plot lower T of +1.0 ºF on scale 1.
Comment: Lower T of +1.0 ºF is equivalent to a stability class E
Comment: Lower T of +1.0 ºF is equivalent to a stability class E
____________________________________________________________________________
____________________________________________________________________________
: 9. Performance step: Plot the wind speed
: 9. Performance step: Plot the wind speed
____ Standard: From initial conditions, plot a wind speed of 8 MPH on scale 2
____
 
Standard: From initial conditions, plot a wind speed of 8 MPH on scale 2 Comment: None
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 10. Performance step: Plot the X/Q value
: 10. Performance step: Plot the X/Q value
____ Standard: Draw a line from scale 1 to scale 2 to obtain a X/Q value of 4 X 10
____
-5 to 6 X 10
Standard: Draw a line from scale 1 to scale 2 to obtain a X/Q value of 4 X 10-5 to 6 X 10-5 sec/m3 on scale 3 Comment: Actual X/Q value is 5 X 10-5
-5 sec/m 3 on scale 3 Comment: Actual X/Q value is 5 X 10
____________________________________________________________________________
-5   ____________________________________________________________________________
: 11. Performance step: Plot the TEDE value at the site boundary
: 11. Performance step: Plot the TEDE value at the site boundary
____
____
Standard: Draw a line from scale C to scale 3 to obtain a TEDE value of 0.4 to 1 rem/hr and plot on scale 4 Comment: Actual TEDE rate at the site boundary is 0.8 rem/hr
Standard: Draw a line from scale C to scale 3 to obtain a TEDE value of 0.4 to 1 rem/hr and plot on scale 4 Comment: Actual TEDE rate at the site boundary is 0.8 rem/hr
____________________________________________________________________________  
____________________________________________________________________________
Page 4 of 7


Page 5 of 7
____________________________________________________________________________
____________________________________________________________________________
: 12. Performance step: Determine the TEDE rate at 2 miles
: 12. Performance step: Determine the TEDE rate at 2 miles
____ Standard: Divide the site boundary TEDE rate by 5 to obtain a TEDE rate at 2 miles of 0.08 rem/hr to 0.2 rem/hr and record on the nomogram Comment: Actual TEDE rate at 2 miles is 0.16 rem/hr
____
Standard: Divide the site boundary TEDE rate by 5 to obtain a TEDE rate at 2 miles of 0.08 rem/hr to 0.2 rem/hr and record on the nomogram Comment: Actual TEDE rate at 2 miles is 0.16 rem/hr
____________________________________________________________________________
____________________________________________________________________________
: 13. Performance step: Determine the TEDE rate at 5 miles
: 13. Performance step: Determine the TEDE rate at 5 miles
____ Standard: Divide the site boundary TEDE rate by 15 to obtain a TEDE rate at 5 miles of 0.027 rem/hr to 0.067 rem/hr and record on the nomogram Comment: Actual TEDE rate at 5 miles is 0.053 rem/hr  
____
 
Standard: Divide the site boundary TEDE rate by 15 to obtain a TEDE rate at 5 miles of 0.027 rem/hr to 0.067 rem/hr and record on the nomogram Comment: Actual TEDE rate at 5 miles is 0.053 rem/hr
____________________________________________________________________________
____________________________________________________________________________
: 14. Performance step: Determine the TEDE rate at 10 miles
: 14. Performance step: Determine the TEDE rate at 10 miles
____
____
Standard: Divide the site boundary TEDE rate by 40 to obtain a TEDE rate at 10 miles of 0.01 rem/hr to 0.025 rem/hr and record on the nomogram Comment: Actual TEDE rate at 10 miles is 0.02 rem/hr
Standard: Divide the site boundary TEDE rate by 40 to obtain a TEDE rate at 10 miles of 0.01 rem/hr to 0.025 rem/hr and record on the nomogram Comment: Actual TEDE rate at 10 miles is 0.02 rem/hr
____________________________________________________________________________  
____________________________________________________________________________
 
Terminating Cue: This JPM is complete.
Terminating Cue: This JPM is complete.  
Page 5 of 7
 
Page 6 of 7 VERIFICATION OF COMPLETION Job Performance Measure No. _RO  E
______  Examinee's Name:                       
 
Examiner's Name:


VERIFICATION OF COMPLETION Job Performance Measure No. _RO E______
Examinee's Name:
Examiner's Name:
Date performed:
Date performed:
Facility Evaluator:
Facility Evaluator:
Number of attempts:  
Number of attempts:
 
Time to complete:
Time to complete:  
 
Question Documentation:
Question Documentation:
Question:____________________________________________________________________
Question:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Response:___________________________________________________________________
Response:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Result: SAT or UNSAT Examiner's signature and date: _______________________________    __________
Result: SAT or UNSAT  
Page 6 of 7


Examiner's signature and date:  _______________________________    __________
JPM RO E Simulator Instructions Setup the simulator to any IC Page 7 of 7
Page 7 of 7 JPM RO E Simulator Instructions Setup the simulator to any IC Page 1 of 8 Appendix C    Job Performance Measure      Form ES-C-1      Worksheet


Facility:     Davis-Besse ________ _     Task No: _336-005-03-0300_________
Appendix C                              Job Performance Measure                          Form ES-C-1 Worksheet Facility:   Davis-Besse ________ _                             Task No: _336-005-03-0300_________
Task Title: _Notification to the Federal Aviation Administration for Cooling Tower Aviation__ Light Failure ___________________________________________________________________
Task Title: _Notification to the Federal Aviation Administration for Cooling Tower Aviation__
Light Failure ___________________________________________________________________
K/A  
K/A  


==Reference:==
==Reference:==
GEN 2.1.17 3.5/3.6     Job Performance Measure No: SRO A_                
GEN 2.1.17 3.5/3.6                               Job Performance Measure No: SRO A_
 
Examinee:                             __                       NRC Examiner: ___________________
Examinee:                                   __     NRC Examiner: ___________________
Facility Evaluator: ______________                             Date: ___________________________
Facility Evaluator: ______________   Date: ___________________________                
 
Method of testing:
Method of testing:
Simulated Performance ______X________   Actual Performance __________  
Simulated Performance ______X________                           Actual Performance __________
 
Classroom ________________               Simulator _______X________           Plant __________
Classroom ________________ Simulator _______X________ Plant __________
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: The plant is at 100% power. You are the Shift Manager.  
Initial Conditions: The plant is at 100% power. You are the Shift Manager.
 
Task Standard: Notify the Federal Aviation Administration of a problem with the Cooling Tower Aviation Lighting Required Materials: None General  
Task Standard: Notify the Federal Aviation Administration of a problem with the Cooling Tower Aviation Lighting Required Materials: None General  


==References:==
==References:==
DB-OP-00002, Operations Section Event/Incident Notifications and Actions, EO-02, Cooling Tower and Microwave Tower Aviation Lighting Malfunctions Initiating Cue: The security supervisor reports that two of the red beacons on top of the Cooling Tower are not flashing.
DB-OP-00002, Operations Section Event/Incident Notifications and Actions, EO-02, Cooling Tower and Microwave Tower Aviation Lighting Malfunctions Initiating Cue: The security supervisor reports that two of the red beacons on top of the Cooling Tower are not flashing.
Time Critical Task: No Validation Time: 8 Minutes Page 1 of 8


Time Critical Task: No  Validation Time: 8 Minutes
Initiating Cue The plant is at 100% power. You are the Shift Manager.
The security supervisor reports that two of the red beacons on top of the Cooling Tower are not flashing.
Page 2 of 8


Page 2 of 8 Initiating Cue The plant is at 100% power. You are the Shift Manager.
PERFORMANCE INFORMATION (Denote critical steps with a check mark)
The security supervisor reports that two of the red beacons on top of the Cooling Tower are not flashing.
Page 3 of 8 PERFORMANCE INFORMATION (Denote critical steps with a check mark)
____________________________________________________________________________
____________________________________________________________________________
: 1. Performance step: Locate guidance for notifying the Federal Aviation Administration
: 1. Performance step: Locate guidance for notifying the Federal Aviation Administration Standard: Use Operations Directive EO-02, Cooling Tower and Microwave Tower Aviation Lighting Malfunctions Comment: May go to DB-OP-00002 first but guidance is contained in EO-02
 
Standard: Use Operations Directive EO-02, Cooling Tower and Microwave Tower Aviation Lighting Malfunctions Comment: May go to DB-OP-00002 first but guidance is contained in EO-02  
 
____________________________________________________________________________
____________________________________________________________________________
: 2. Performance step: Notify Electrical Maintenance and/or Electrical Systems Engineering
: 2. Performance step: Notify Electrical Maintenance and/or Electrical Systems Engineering
____
____
Standard: Communicate via the GAI-TRONICS or telephone Comment: May contact the Work Week Manager Cue: Need to contact the vendor. Trouble shooting and repairing the Cooling Tower lights will take approximately 24 hours                          
Standard: Communicate via the GAI-TRONICS or telephone Comment: May contact the Work Week Manager Cue: Need to contact the vendor. Trouble shooting and repairing the Cooling Tower lights will take approximately 24 hours
 
____________________________________________________________________________
____________________________________________________________________________
: 3. Performance step: Notify the Federal Aviation Administration
: 3. Performance step: Notify the Federal Aviation Administration
____ Standard: Communicate using the telephone Comment: Dial 9-1-800-992-7433, #, *, 9, 9 OR 9-1-216-265-8070 Cue: (If the candidate does not dial 9) The number you have requested can not be completed as dialed. Please check the number and dial again. Cue: Answer as the Federal Aviation Administration
____
Standard: Communicate using the telephone Comment: Dial 9-1-800-992-7433, #, *, 9, 9 OR 9-1-216-265-8070 Cue: (If the candidate does not dial 9) The number you have requested can not be completed as dialed. Please check the number and dial again.
Cue: Answer as the Federal Aviation Administration
____________________________________________________________________________
____________________________________________________________________________
: 4. Performance step: Notify the Federal Aviation Administration
: 4. Performance step: Notify the Federal Aviation Administration
____ Standard: Provide name                                                                  
____
Standard: Provide name Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
____________________________________________________________________________
Page 3 of 8


Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
____________________________________________________________________________
Page 4 of 8
____________________________________________________________________________
____________________________________________________________________________
: 5. Performance step: Notify the Federal Aviation Administration
: 5. Performance step: Notify the Federal Aviation Administration
____ Standard: Provide reason for call - Davis-Besse Unit 1 Hyperbolic Cooling Tower Aviation Lighting problem Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
____
Standard: Provide reason for call - Davis-Besse Unit 1 Hyperbolic Cooling Tower Aviation Lighting problem Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
____________________________________________________________________________
____________________________________________________________________________
: 6. Performance step: Notify the Federal Aviation Administration
: 6. Performance step: Notify the Federal Aviation Administration
____
____
Standard: Provide exact lighting problem -Two of the eight red beacons are not flashing Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
Standard: Provide exact lighting problem - Two of the eight red beacons are not flashing Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
____________________________________________________________________________
____________________________________________________________________________
: 7. Performance step: Notify the Federal Aviation Administration
: 7. Performance step: Notify the Federal Aviation Administration
____
____
Standard: Provide time of occurrence Comment: Ask for the required information if not provided by the candidate  
Standard: Provide time of occurrence Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
 
Cue: Role-play as the Federal Aviation Administration
____________________________________________________________________________
____________________________________________________________________________
: 8. Performance step: Notify the Federal Aviation Administration
: 8. Performance step: Notify the Federal Aviation Administration
____
____
Standard: Provide estimated return to service date of 24 hours Comment: Ask for the required information if not provided by the candidate  
Standard: Provide estimated return to service date of 24 hours Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
____________________________________________________________________________
Page 4 of 8


Cue: Role-play as the Federal Aviation Administration
____________________________________________________________________________
Page 5 of 8
____________________________________________________________________________
____________________________________________________________________________
: 9. Performance step: Notify the Federal Aviation Administration
: 9. Performance step: Notify the Federal Aviation Administration
____ Standard: Provide latitude and longitude of the cooling tower - 41
____
°35'57"/83°05'28" Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
Standard: Provide latitude and longitude of the cooling tower - 41°35'57"/83°05'28" Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
____________________________________________________________________________
____________________________________________________________________________
: 10. Performance step: Notify the Federal Aviation Administration
: 10. Performance step: Notify the Federal Aviation Administration
____ Standard: Provide the height of the cooling tower -493'AGL/1077AMSL Comment: AGL - Above Ground Level, AMSL - Above Mean Sea Level Ask for the required information if not provided by the candidate  
____
 
Standard: Provide the height of the cooling tower - 493'AGL/1077AMSL Comment: AGL - Above Ground Level, AMSL - Above Mean Sea Level Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration
Cue: Role-play as the Federal Aviation Administration
____________________________________________________________________________
____________________________________________________________________________
: 11. Performance step: Notify the Federal Aviation Administration
: 11. Performance step: Notify the Federal Aviation Administration
____ Standard: Provide location of the nearest airport -Port Clinton, 10 miles WNW Comment: Davis-Besse cooling tower does not have an FCC registration number  
____
Standard: Provide location of the nearest airport - Port Clinton, 10 miles WNW Comment: Davis-Besse cooling tower does not have an FCC registration number Cue: Ask if the cooling tower has an FCC registration number.
____________________________________________________________________________
: 12. Performance step: Notify the Federal Aviation Administration Standard: Request a NOTAM number Comment: NOTAM - Notice to AirMen Cue: Provide the NOTAM number of 04-AGL-00129
____________________________________________________________________________
Page 5 of 8


Cue: Ask if the cooling tower has an FCC registration number.
____________________________________________________________________________
____________________________________________________________________________
: 12. Performance step: Notify the Federal Aviation Administration
: 13. Performance step: Log Federal Aviation Administration notification in the Unit Log Standard: Make Unit Log entry with the following details:
 
Time of occurrence Details of problem Time FAA was notified Time Electrical Maintenance/Plant Engineering was notified NOTAM number Comment: Unit Log may be available if JPM is performed on the simulator Cue: Ask what information will be recorded in the Unit Log
Standard: Request a NOTAM number Comment: NOTAM - Notice to AirMen Cue: Provide the NOTAM number of 04-AGL-00129
____________________________________________________________________________
____________________________________________________________________________
Terminating Cue: This JPM is complete.
Page 6 of 8
Page 6 of 8
____________________________________________________________________________
: 13. Performance step: Log Federal Aviation Administration notification in the Unit Log Standard: Make Unit Log entry with the following details:  Time of occurrence Details of problem  Time FAA was notified  Time Electrical Maintenance/Plant Engineering was notified  NOTAM number
Comment: Unit Log may be available if JPM is performed on the simulator Cue: Ask what information will be recorded in the Unit Log
____________________________________________________________________________
Terminating Cue: This JPM is complete.
Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No. _SRO  A
_______  Examinee's Name:                       
Examiner's Name:


VERIFICATION OF COMPLETION Job Performance Measure No. _SRO A_______
Examinee's Name:
Examiner's Name:
Date performed:
Date performed:
Facility Evaluator:
Facility Evaluator:
Number of attempts:  
Number of attempts:
 
Time to complete:
Time to complete:  
 
Question Documentation:
Question Documentation:
Question:____________________________________________________________________
Question:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Response:___________________________________________________________________
Response:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Result: SAT or UNSAT Page 7 of 8
Result: SAT or UNSAT  


Page 8 of 8 JPM SRO A Simulator Instructions If performed on the simulator, this JPM can setup at any IC Page 1 of 7 Appendix C    Job Performance Measure      Form ES-C-1      Worksheet
JPM SRO A Simulator Instructions If performed on the simulator, this JPM can setup at any IC Page 8 of 8


Facility:     Davis-Besse ________ _     Task No: _333-011-01-0300_________
Appendix C                              Job Performance Measure                          Form ES-C-1 Worksheet Facility:   Davis-Besse ________ _                             Task No: _333-011-01-0300_________
Task Title:   Review and Correct a Shutdown Margin Calculation____________________________
Task Title: Review and Correct a Shutdown Margin Calculation____________________________
K/A  
K/A  


==Reference:==
==Reference:==
GEN 2.1.12 2.9/4.0     Job Performance Measure No: _SRO B Examinee:                                   __     NRC Examiner: ___________________
GEN 2.1.12 2.9/4.0                               Job Performance Measure No: _SRO B Examinee:                             __                       NRC Examiner: ___________________
Facility Evaluator: ______________   Date: ___________________________                
Facility Evaluator: ______________                             Date: ___________________________
 
Method of testing:
Method of testing:
Simulated Performance _______________   Actual Performance ____X
Simulated Performance _______________                           Actual Performance ____X______
______  Classroom ________________ Simulator ______X_________ Plant _____
Classroom ________________               Simulator ______X_________           Plant ___________
______  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Initial Conditions: The plant is in Mode 3 following a reactor trip. The START program is not available. The following conditions exist: The plant is at 100 EFPD, RCS Boron Concentration is 1600 ppmB, Tave is 532
When you complete the task successfully, the objective for this job performance measure will be satisfied.
°F, APSRs are 28.5% withdrawn, there is one known stuck rod, Reactivity worth due to transient poisons is -.27%  K/K, the correction factor for boron 10 depletion is 0.99, the Reactivity Anomaly is .13%  K/K.
Initial Conditions: The plant is in Mode 3 following a reactor trip. The START program is not available. The following conditions exist: The plant is at 100 EFPD, RCS Boron Concentration is 1600 ppmB, Tave is 532°F, APSRs are 28.5% withdrawn, there is one known stuck rod, Reactivity worth due to transient poisons is -.27%  K/K, the correction factor for boron 10 depletion is 0.99, the Reactivity Anomaly is .13%  K/K.
Task Standard: Recognize Shutdown Margin is NOT adequate and apply the appropriate Technical Specifications  
Task Standard: Recognize Shutdown Margin is NOT adequate and apply the appropriate Technical Specifications Required Materials: Calculator General  
 
Required Materials: Calculator General  


==References:==
==References:==
DB-NE-06202, Reactivity Balance Calculations, DB-NE-06201, Reactor Operator Curve Book Initiating Cue: The Shift Manager has directed you to check the calculation for a shutdown margin per DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operator Curve Book, Attachment 4.
DB-NE-06202, Reactivity Balance Calculations, DB-NE-06201, Reactor Operator Curve Book Initiating Cue: The Shift Manager has directed you to check the calculation for a shutdown margin per DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operator Curve Book, Attachment 4.
Time Critical Task: No Validation Time: 22 minutes Page 2 of 7 Initiating Cue The plant is in Mode 3 following a reactor trip. The START program is not available. The following conditions exist: The plant is at 100 EFPD RCS Boron Concentration is 1600 ppmB Tave is 532
Time Critical Task: No Validation Time: 22 minutes Page 1 of 7
°F APSRs are 28.5% withdrawn There is one known stuck rod. Reactivity worth due to transient poisons is -.27%  K/K The correction factor for boron 10 depletion is 0.99   The Reactivity Anomaly is .13%  K/K The Shift Manager has directed you to check the calculation for a shutdown margin per DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operator Curve Book, Attachment 4.
 
Page 3 of 7 PERFORMANCE INFORMATION (Denote critical steps with a check mark)
Initiating Cue The plant is in Mode 3 following a reactor trip.
The START program is not available.
The following conditions exist:
The plant is at 100 EFPD RCS Boron Concentration is 1600 ppmB Tave is 532°F APSRs are 28.5% withdrawn There is one known stuck rod.
Reactivity worth due to transient poisons is -.27%  K/K The correction factor for boron 10 depletion is 0.99 The Reactivity Anomaly is .13%  K/K The Shift Manager has directed you to check the calculation for a shutdown margin per DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operator Curve Book, .
Page 2 of 7
 
PERFORMANCE INFORMATION (Denote critical steps with a check mark)
____________________________________________________________________________
____________________________________________________________________________
: 1. Performance step: Verify reactivity worth of the fuel.
: 1. Performance step: Verify reactivity worth of the fuel.
Standard: From Figure 2, verify a value of 13.5% K/K to 13.6% K/K and enter this value on Attachment 4.
Standard: From Figure 2, verify a value of 13.5% K/K to 13.6% K/K and enter this value on .
Comment: Actual value is 13.55% K/K ____________________________________________________________________________
Comment: Actual value is 13.55% K/K
: 2. Performance step: Verify the corrected boron concentration.  
____________________________________________________________________________
 
: 2. Performance step: Verify the corrected boron concentration.
Standard: Verify RCS boron concentration of 1600 ppmB multiplied by the B10 correction factor of 0.99 to obtain a value of 1584ppmB Comment: None
Standard: Verify RCS boron concentration of 1600 ppmB multiplied by the B10 correction factor of 0.99 to obtain a value of 1584ppmB Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 3. Performance step: Verify the reactivity worth due to boron Standard: From Figure 3, verify a value of -10.2% K/K to -10.3% K/K. From Figure 4, verify a value of 1.004 to 1.006 for the Fuel Burnup Correction Factor. Multiply to obtain a value of -10.24% K/K to -10.36% K/K Comment: Actual value is -10.25% K/K times 1.005 = -10.3% K/K ____________________________________________________________________________
: 3. Performance step: Verify the reactivity worth due to boron Standard: From Figure 3, verify a value of -10.2% K/K to -10.3% K/K. From Figure 4, verify a value of 1.004 to 1.006 for the Fuel Burnup Correction Factor. Multiply to obtain a value of -
10.24% K/K to -10.36% K/K Comment: Actual value is -10.25% K/K times 1.005 = -10.3% K/K
____________________________________________________________________________
: 4. Performance step: Verify reactivity worth due to transient poisons.
: 4. Performance step: Verify reactivity worth due to transient poisons.
 
Standard: Verify from initial conditions that the reactivity worth due to transient poisons is
Standard: Verify from initial conditions that the reactivity worth due to transient poisons is                 -.27% K/K. Comment: None
-.27% K/K.
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 5. Performance step: Verify the reactivity worth due to temperature.
: 5. Performance step: Verify the reactivity worth due to temperature.
Standard: Verify the reactivity worth due to temperature is 0 Comment: T is 0% K/K ____________________________________________________________________________
Standard: Verify the reactivity worth due to temperature is 0 Comment: T is 0% K/K
Page 4 of 7
____________________________________________________________________________
Page 3 of 7
 
____________________________________________________________________________
____________________________________________________________________________
: 6. Performance step: Recognize the adjusted rod worth for one known stuck rod entered on the calculation sheet is incorrect
: 6. Performance step: Recognize the adjusted rod worth for one known stuck rod entered on the calculation sheet is incorrect
____ Standard: From Figure 10, determine rod worth of -4.18% K/K to -4.2% K/K and enter on the calculation sheet.
____
Comment: Actual value is -4.19% K/K. Value entered on the calculation sheet was -5.12% K/K The candidate may choose to complete the review of the Shutdown Margin before informing the Shift Manager of the error.
Standard: From Figure 10, determine rod worth of -4.18% K/K to -4.2% K/K and enter on the calculation sheet.
Cue: The Shift Manager acknowledges the error and directs you to continue with the calculations and make any necessary corrections.                                                                    
Comment: Actual value is -4.19% K/K. Value entered on the calculation sheet was -5.12%
 
K/K The candidate may choose to complete the review of the Shutdown Margin before informing the Shift Manager of the error.
Cue: The Shift Manager acknowledges the error and directs you to continue with the calculations and make any necessary corrections.
____________________________________________________________________________
____________________________________________________________________________
: 7. Performance step: Verify APSR reactivity worth.
: 7. Performance step: Verify APSR reactivity worth.
Standard: From Figure 11A, verify APSR reactivity worth of -0.11% K/K to -0.12% K/K. Comment: Actual value is -0.115% K/K ____________________________________________________________________________
Standard: From Figure 11A, verify APSR reactivity worth of -0.11% K/K to -0.12% K/K.
Comment: Actual value is -0.115% K/K
____________________________________________________________________________
: 8. Performance step: Verify Flux Redistribution Penalty (FRP) using Table 1 of DB-OP-06201.
: 8. Performance step: Verify Flux Redistribution Penalty (FRP) using Table 1 of DB-OP-06201.
Standard: Verify Flux Redistribution Penalty is 0.35% K/K. Comment: None                                                                    
Standard: Verify Flux Redistribution Penalty is 0.35% K/K.
 
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 9. Performance step: Verify reactivity anomaly reactivity worth from initial conditions.  
: 9. Performance step: Verify reactivity anomaly reactivity worth from initial conditions.
 
Standard: Verify reactivity anomaly reactivity worth is .13% K/K.
Standard: Verify reactivity anomaly reactivity worth is .13% K/K. Comment: None
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 10. Performance step: Determine the value for shutdown margin.
: 10. Performance step: Determine the value for shutdown margin.
____ Standard: Determine that shutdown margin is a value between .72% K/K and .97% K/K. Comment: Actual Shutdown Margin is .845% K/K ____________________________________________________________________________
____
Page 5 of 7
Standard: Determine that shutdown margin is a value between .72% K/K and .97% K/K.
Comment: Actual Shutdown Margin is .845% K/K
____________________________________________________________________________
Page 4 of 7
 
___________________________________________________________________________
___________________________________________________________________________
: 11. Performance step: Take actions for Shutdown Margin less than adequate Standard: Communicate revised Shutdown Margin to the Shift Manager Comment: None
: 11. Performance step: Take actions for Shutdown Margin less than adequate Standard: Communicate revised Shutdown Margin to the Shift Manager Comment: None Cue: (If asked) The Shift Manager reports another SRO has reviewed the corrections and agrees that Shutdown Margin is less than 1%.
 
Cue: (If asked) The Shift Manager reports another SRO has reviewed the corrections and agrees that Shutdown Margin is less than 1%.
____________________________________________________________________________
____________________________________________________________________________
: 12. Performance step: Take actions for Shutdown Margin less than adequate
: 12. Performance step: Take actions for Shutdown Margin less than adequate
Line 664: Line 631:
____________________________________________________________________________
____________________________________________________________________________
: 13. Performance step: Take actions for Shutdown Margin less than adequate
: 13. Performance step: Take actions for Shutdown Margin less than adequate
____ Standard: Recognize the need to immediately initiate RCS boration Comment: May need to ask the candidate what actions are required Candidate may refer to Tech. Specs.
____
____________________________________________________________________________  
Standard: Recognize the need to immediately initiate RCS boration Comment: May need to ask the candidate what actions are required Candidate may refer to Tech. Specs.
 
____________________________________________________________________________
Terminating Cues: This JPM is complete.
Terminating Cues: This JPM is complete.
 
Page 5 of 7
Page 6 of 7 VERIFICATION OF COMPLETION Job Performance Measure No. ___SRO  B
_______  Examinee's Name:                       
 
Examiner's Name:


VERIFICATION OF COMPLETION Job Performance Measure No. ___SRO B_______
Examinee's Name:
Examiner's Name:
Date performed:
Date performed:
Facility Evaluator:
Facility Evaluator:
Number of attempts:  
Number of attempts:
 
Time to complete:
Time to complete:  
 
Question Documentation:
Question Documentation:
Question:____________________________________________________________________
Question:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Response:___________________________________________________________________
Response:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Result: SAT or UNSAT Examiner's signature and date: _______________________________   __________
Result: SAT or UNSAT  
Page 6 of 7
 
Examiner's signature and date: _______________________________     __________  
 
Page 7 of 7 JPM SRO  B Simulator Instructions If performed on the simulator, this JPM can setup at any IC


Page 1 of 8 Appendix C    Job Performance Measure      Form ES-C-1      Worksheet
JPM SRO B Simulator Instructions If performed on the simulator, this JPM can setup at any IC Page 7 of 7


Facility:     Davis-Besse ________ _     Task No: _119-004-03-0400_________
Appendix C                              Job Performance Measure                          Form ES-C-1 Worksheet Facility:   Davis-Besse ________ _                             Task No: _119-004-03-0400_________
Task Title:   Control of Locked Valves During Post-Maintenance Testing______________________
Task Title: Control of Locked Valves During Post-Maintenance Testing______________________
K/A  
K/A  


==Reference:==
==Reference:==
GEN 2.2.12 3.0/3.4     Job Performance Measure No: _SRO C Examinee:                                   __     NRC Examiner: ___________________
GEN 2.2.12 3.0/3.4                               Job Performance Measure No: _SRO C Examinee:                             __                       NRC Examiner: ___________________
Facility Evaluator: ______________   Date: ___________________________                
Facility Evaluator: ______________                             Date: ___________________________
 
Method of testing:
Method of testing:
Simulated Performance ______X________   Actual Performance __________
Simulated Performance ______X________                           Actual Performance __________
Classroom ________________ Simulator _______X_________ Plant __________
Classroom ________________               Simulator _______X_________         Plant __________
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.  
Initial Conditions: Maintenance has completed a packing adjustment on valve DH2736, DH Aux.
 
Spray Throttle Valve, to stop a packing leak per Order 200001155.
Task Standard: Stroke and time DH2736 and make the appropriate locked valve log entries.
Task Standard: Stroke and time DH2736 and make the appropriate locked valve log entries.
Required Materials: Pump and Valve Basis Document, Stop watch and Locked Valve Log  
Required Materials: Pump and Valve Basis Document, Stop watch and Locked Valve Log General


General
==References:==
DB-PF-03272, Post Maintenance Valve Test, DB-OP-00008, Operation and Control of Locked Valves Initiating Cue: The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve.
An equipment operator is standing by in the Auxiliary Building.
The Locked Valve Log is in the Control Room.
The Shift Manager has completed the first 8 columns in the Locked Valve Log.
Time Critical Task: No Validation Time: 25 Minutes Page 1 of 8


==References:==
Initiating Cues Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.
DB-PF-03272, Post Maintenance Valve Test, DB-OP-00008, Operation and Control of Locked Valves Initiating Cue: The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete  The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve. An equipment operator is standing by in the Auxiliary Building. The Locked Valve Log is in the Control Room. The Shift Manager has completed the first 8 columns in the Locked Valve Log.
The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2.
Time Critical Task: No  Validation Time: 25 Minutes Page 2 of 8 Initiating Cues Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.
DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve.
The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve. An equipment operator is standing by in the Auxiliary Building. The Locked Valve Log is in the Control Room.
An equipment operator is standing by in the Auxiliary Building.
The Locked Valve Log is in the Control Room.
The Shift Manager has completed the first 8 columns in the Locked Valve Log.
The Shift Manager has completed the first 8 columns in the Locked Valve Log.
Page 3 of 8 PERFORMANCE INFORMATION (Denote critical steps with a check mark)
Page 2 of 8
 
PERFORMANCE INFORMATION (Denote critical steps with a check mark)
____________________________________________________________________________
____________________________________________________________________________
: 1. Performance step: Complete section 3.2 of DB-PF-03272                                                      
: 1. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Check Verify section 3.1 is complete Comment: None
 
Standard: Check Verify section 3.1 is complete Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 2. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Verify a RWP is available Comment: None Cue: (If asked) A special RWP is not required for this test.
: 2. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Verify a RWP is available Comment: None Cue: (If asked) A special RWP is not required for this test.
____________________________________________________________________________
____________________________________________________________________________
: 3. Performance step: Obtain stroke times from the Pump and Valve Basis Document and record on Attachment 2  
: 3. Performance step: Obtain stroke times from the Pump and Valve Basis Document and record on Attachment 2
 
____
____
Standard: Enter the maximum close time of 59.70 seconds, the maximum open time of 59.62 seconds, the expected close time range of 33.83 seconds to 45.77 seconds and the expected open time range of 33.78 seconds to 45.71 seconds in step 3.2.3 of DB-PF-03272
Standard: Enter the maximum close time of 59.70 seconds, the maximum open time of 59.62 seconds, the expected close time range of 33.83 seconds to 45.77 seconds and the expected open time range of 33.78 seconds to 45.71 seconds in step 3.2.3 of DB-PF-03272 Comment: None
 
____________________________________________________________________________
Comment: None
: 4. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Obtain Shift Manager's permission to perform the test Comment: None Cue: (If asked) the Shift Manager has given permission to stroke test DH 2736
____________________________________________________________________________
____________________________________________________________________________
: 4. Performance step: Complete section 3.2 of DB-PF-03272                                                     
: 5. Performance step: Record test equipment data Standard: Record the M&TE number for the stopwatch and the calibration due date Comment: None Cue: (If asked) A special DB-OP-00016 lineup is NOT required
 
Standard: Obtain Shift Manager's permission to perform the test Comment: None Cue: (If asked) the Shift Manager has given permission to stroke test DH 2736
____________________________________________________________________________
____________________________________________________________________________
: 5. Performance step: Record test equipment data Standard: Record the M&TE number for the stopwatch and the calibration due date                                         
Page 3 of 8


Comment: None Cue: (If asked) A special DB-OP-00016 lineup is NOT required
____________________________________________________________________________
Page 4 of 8
____________________________________________________________________________
____________________________________________________________________________
: 6. Performance step: Verity the Equipment Operator is at DH 2736 Standard: Communicate via GAI-TRONICS or radio
: 6. Performance step: Verity the Equipment Operator is at DH 2736 Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: An Equipment Operator is standing by to verify local valve position
 
Comment: None Cue: An Equipment Operator is standing by to verify local valve position
____________________________________________________________________________
____________________________________________________________________________
: 7. Performance step: Stoke DH 2736 open and record time
: 7. Performance step: Stoke DH 2736 open and record time
____ Standard: Depress and hold the OPEN pushbutton and stroke time using the stopwatch. Record the stroke time.
____
Standard: Depress and hold the OPEN pushbutton and stroke time using the stopwatch. Record the stroke time.
Comment: DH 2736 is a throttle valve, which requires the OPEN pushbutton to be depressed while the valve is stroking DH 2736 will stroke faster than the expected time.
Comment: DH 2736 is a throttle valve, which requires the OPEN pushbutton to be depressed while the valve is stroking DH 2736 will stroke faster than the expected time.
____________________________________________________________________________
____________________________________________________________________________
: 8. Performance step: Contact the Equipment Operator to check local indication                                                
: 8. Performance step: Contact the Equipment Operator to check local indication Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is open
 
Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is open
____________________________________________________________________________
____________________________________________________________________________
: 9. Performance step: Complete the "Position To" column in the Locked Valve Log
: 9. Performance step: Complete the "Position To" column in the Locked Valve Log
____ Standard: Enter "Open" Comment: The Locked Valve Log may be updated after the stoke test is complete
____
Standard: Enter "Open" Comment: The Locked Valve Log may be updated after the stoke test is complete
____________________________________________________________________________
____________________________________________________________________________
: 10. Performance step: Complete the "Position By" column in the Locked Valve Log
: 10. Performance step: Complete the "Position By" column in the Locked Valve Log
____ Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete
____
Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete
____________________________________________________________________________
Page 4 of 8


____________________________________________________________________________
Page 5 of 8
____________________________________________________________________________
____________________________________________________________________________
: 11. Performance step: Stoke DH 2736 closed and record time
: 11. Performance step: Stoke DH 2736 closed and record time
____ Standard: Depress and hold the CLOSED pushbutton and stroke time using the stopwatch.
____
Standard: Depress and hold the CLOSED pushbutton and stroke time using the stopwatch.
Record the stroke time.
Record the stroke time.
Comment: None
Comment: None
Line 778: Line 735:
____________________________________________________________________________
____________________________________________________________________________
: 13. Performance step: Complete the "Restored By" column in the Locked Valve Log
: 13. Performance step: Complete the "Restored By" column in the Locked Valve Log
____ Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete
____
Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete
____________________________________________________________________________
____________________________________________________________________________
: 14. Performance step: Recognize the stroke times are not within the expected times Standard: Compare valve stroke times to the expected range of stroke times
: 14. Performance step: Recognize the stroke times are not within the expected times Standard: Compare valve stroke times to the expected range of stroke times Comment: None
 
Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 15. Performance step: Restoke DH 2736 and record times
: 15. Performance step: Restoke DH 2736 and record times
____ Standard: Recognize the test requires the valve to be stroke timed a second time Comment: None  
____
Standard: Recognize the test requires the valve to be stroke timed a second time Comment: None Cue: DH 2736 has been stroked open and closed a second time. The stroke times are the same as recorded in step 4.2.2
____________________________________________________________________________
Page 5 of 8


Cue: DH 2736 has been stroked open and closed a second time. The stroke times are the same as recorded in step 4.2.2
____________________________________________________________________________
Page 6 of 8
____________________________________________________________________________
____________________________________________________________________________
: 16. Performance step: Inform the Unit Supervisor or Shift Manager the stroke times are not with in the expected range
: 16. Performance step: Inform the Unit Supervisor or Shift Manager the stroke times are not with in the expected range
____
____
Standard: Communicate to a shift SRO the need to write a Condition Report and perform an Operability Justification Comment: None Cue: The Shift Manager will write the Condition Report and document the Operability Justification  
Standard: Communicate to a shift SRO the need to write a Condition Report and perform an Operability Justification Comment: None Cue: The Shift Manager will write the Condition Report and document the Operability Justification
 
____________________________________________________________________________
____________________________________________________________________________
: 17. Performance step: Complete acceptance criteria
: 17. Performance step: Complete acceptance criteria
____
____
Standard: Sign off steps 5.2 and 5.3 Comment: None
Standard: Sign off steps 5.2 and 5.3 Comment: None
____________________________________________________________________________  
____________________________________________________________________________
 
Terminating Cue: This JPM is complete Page 6 of 8
Terminating Cue: This JPM is complete Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No. ____SRO  C
______  Examinee's Name:                       
 
Examiner's Name:


VERIFICATION OF COMPLETION Job Performance Measure No. ____SRO C______
Examinee's Name:
Examiner's Name:
Date performed:
Date performed:
Facility Evaluator:
Facility Evaluator:
Number of attempts:  
Number of attempts:
 
Time to complete:
Time to complete:  
 
Question Documentation:
Question Documentation:
Question:____________________________________________________________________
Question:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Response:___________________________________________________________________
Response:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Result: SAT or UNSAT Examiner's signature and date: _______________________________    __________
Result: SAT or UNSAT  
Page 7 of 8


Examiner's signature and date:  _______________________________    __________
JPM SRO C Simulator Instructions Setup the simulator to any Mode 1, 2, or 3 IC at NOP and NOT.
Page 8 of 8


Page 8 of 8 JPM SRO  C Simulator Instructions Setup the simulator to any Mode 1, 2, or 3 IC at NOP and NOT.
Appendix C                               Job Performance Measure                         Form ES-C-1 Worksheet Facility:   Davis-Besse ________ _                             Task No: _333-008-01-0300_________
Page 1 of 7 Appendix C   Job Performance Measure       Form ES-C-1       Worksheet  
Task Title: Review and Approve a Containment Pressure Reduction Release_________________
 
Facility:     Davis-Besse ________ _     Task No: _333-008-01-0300_________
Task Title:   Review and Approve a Containment Pressure Reduction Release_________________
K/A  
K/A  


==Reference:==
==Reference:==
GEN 2.3.11 2.7/3.2     Job Performance Measure No: _SRO D Examinee:                                   __     NRC Examiner: ___________________
GEN 2.3.11 2.7/3.2                               Job Performance Measure No: _SRO D Examinee:                             __                       NRC Examiner: ___________________
Facility Evaluator: ______________   Date: ___________________________                
Facility Evaluator: ______________                             Date: ___________________________
 
Method of testing:
Method of testing:
Simulated Performance _______________   Actual Performance _____X
Simulated Performance _______________                           Actual Performance _____X_____
_____  Classroom ________________ Simulator _______X________ Plant ______
Classroom ________________               Simulator _______X________           Plant ___________
_____  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H 2O. Flow transmitter FT5090, Station Vent Flow, is out of service for channel calibration.
Initial Conditions: A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H2O. Flow transmitter FT5090, Station Vent Flow, is out of service for channel calibration.
Task Standard: Review and approve a pressure release of Containment.
Task Standard: Review and approve a pressure release of Containment.
 
Required Materials: None General  
Required Materials: None General  


==References:==
==References:==
DB-OP-03012, Radioactive Gaseous Batch Release, Offsite Dose Calculation Manual  
DB-OP-03012, Radioactive Gaseous Batch Release, Offsite Dose Calculation Manual Initiating Cue: Chemistry has completed section 4.15 of DB-OP-03012, Radioactive Gaseous Batch Release and returned the release permit to the Shift Manager. The Shift Manager directs you to perform section 4.5 of DB-OP-03012, Radioactive Gaseous Batch Release.
 
Time Critical Task: No Validation Time: 24 Minutes Page 1 of 7
Initiating Cue: Chemistry has completed section 4.15 of DB-OP-03012, Radioactive Gaseous Batch Release and returned the release permit to the Shift Manager. The Shift Manager directs you to perform section 4.5 of DB-OP-03012, Radioactive Gaseous Batch Release.
Time Critical Task: No Validation Time: 24 Minutes  


Page 2 of 7 Initiating Cues A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H 2 O. Flow transmitter FT5090, Station Vent Flow, is out of service for channel calibration.  
Initiating Cues A plant heatup is in progress.
Containment to annulus differential pressure has risen to 20 inches H2O.
Flow transmitter FT5090, Station Vent Flow, is out of service for channel calibration.
Chemistry has completed section 4.15 of DB-OP-03012, Radioactive Gaseous Batch Release and returned the release permit to the Shift Manager.
The Shift Manager directs you to perform section 4.5 of DB-OP-03012, Radioactive Gaseous Batch Release.
Page 2 of 7


Chemistry has completed section 4.15 of DB-OP-03012, Radioactive Gaseous Batch Release and returned the release permit to the Shift Manager. The Shift Manager directs you to perform section 4.5 of DB-OP-03012, Radioactive Gaseous Batch Release.
PERFORMANCE INFORMATION (Denote critical steps with a check mark)
Page 3 of 7 PERFORMANCE INFORMATION (Denote critical steps with a check mark)
____________________________________________________________________________
____________________________________________________________________________
: 1. Performance step: Verify Chemistry has approved the release                                                    
: 1. Performance step: Verify Chemistry has approved the release Standard: Verify Item 4.h of Attachment 1 is signed and dated Comment: None
 
Standard: Verify Item 4.h of Attachment 1 is signed and dated Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 2. Performance step: Verify the surveillance requirements are current.
: 2. Performance step: Verify the surveillance requirements are current.
Standard: Verify current surveillances by using DB Maintenance Management System or refer to the Unit Log or refer to the report provided by the Work Support Group Comment: If DBMMS or Unit Log is used provide cues. If asked, provide surveillance report.                            
Standard: Verify current surveillances by using DB Maintenance Management System or refer to the Unit Log or refer to the report provided by the Work Support Group Comment: If DBMMS or Unit Log is used provide cues. If asked, provide surveillance report.
 
____________________________________________________________________________
____________________________________________________________________________
: 3. Performance step: Verify the surveillance requirements are current.
: 3. Performance step: Verify the surveillance requirements are current.
Standard: Check DB-MI-03413, RMS Channel Calibration for RE 4598AA and RE 4598BA is current   Cue: (If asked) DB-MI-03413 for RE4598AA Tech. Spec. late date is 8/26/04. DB-MI-03413 for RE4598BA Tech. Spec. late date is 4/23/05.  
Standard: Check DB-MI-03413, RMS Channel Calibration for RE 4598AA and RE 4598BA is current Cue: (If asked) DB-MI-03413 for RE4598AA Tech. Spec. late date is 8/26/04. DB-MI-03413 for RE4598BA Tech. Spec. late date is 4/23/05.
 
____________________________________________________________________________
____________________________________________________________________________
: 4. Performance step: Verify the surveillance requirements are current.
: 4. Performance step: Verify the surveillance requirements are current.
Standard: Check DB-MI-03442, Channel Calibration of 32C-ISF 5090, Station Vent Flow, for FT 5090 is current
Standard: Check DB-MI-03442, Channel Calibration of 32C-ISF 5090, Station Vent Flow, for FT 5090 is current Comment: May not check FT 5090 since OOS in initial conditions Cue: (if asked) DB-MI-03442 for FT 5090 Tech. Spec. late date is 2/20/05.
 
Comment: May not check FT 5090 since OOS in initial conditions  
 
Cue: (if asked) DB-MI-03442 for FT 5090 Tech. Spec. late date is 2/20/05.
____________________________________________________________________________
____________________________________________________________________________
: 5. Performance step: Verify the surveillance requirements are current.
: 5. Performance step: Verify the surveillance requirements are current.
____ Standard: Recognize DB-MI-03444, Channel Calibration of 32C-ISF 5090A, Station Vent Flow, for FT 5090A is NOT current
____
Standard: Recognize DB-MI-03444, Channel Calibration of 32C-ISF 5090A, Station Vent Flow, for FT 5090A is NOT current Comment: May recognize both flow transmitter channels are inoperable.
Cue: (if asked) DB-MI-03444 for FT 5090A Tech. Spec. late date is (yesterdays date).
____________________________________________________________________________
Page 3 of 7


Comment: May recognize both flow transmitter channels are inoperable.
Cue: (if asked) DB-MI-03444 for FT 5090A Tech. Spec. late date is (yesterday's date).
____________________________________________________________________________
Page 4 of 7
____________________________________________________________________________
____________________________________________________________________________
: 6. Performance step: Verify the surveillance requirements are current.
: 6. Performance step: Verify the surveillance requirements are current.
Standard: Check DB-OP-03007, Miscellaneous Instrument Daily Checks is current
Standard: Check DB-OP-03007, Miscellaneous Instrument Daily Checks is current Comment: Status of DB-OP-03007 is obtained from the Unit Log Cue: (if asked) DB-OP-03007 was completed (todays date)
 
Comment: Status of DB-OP-03007 is obtained from the Unit Log  
 
Cue: (if asked) DB-OP-03007 was completed (today's date)
____________________________________________________________________________
____________________________________________________________________________
: 7. Performance step: Verify the surveillance requirements are current.
: 7. Performance step: Verify the surveillance requirements are current.
Standard: Check DB-SC-03216, Quarterly Functional Test of RE 4598AA, Station Vent Normal Range Radiation Monitor is current Comment: Cue: (if asked) DB-SC-03216 for RE4598AA Tech. Spec. late date is 6/10/04.
Standard: Check DB-SC-03216, Quarterly Functional Test of RE 4598AA, Station Vent Normal Range Radiation Monitor is current Comment:
Cue: (if asked) DB-SC-03216 for RE4598AA Tech. Spec. late date is 6/10/04.
___________________________________________________________________________
___________________________________________________________________________
: 8. Performance step: Verify the surveillance requirements are current
: 8. Performance step: Verify the surveillance requirements are current Standard: Verify DB-SC-03218, Quarterly Functional Test of RE 4598BA, Station Vent Normal Range Radiation Monitor is current Comment:
 
Standard: Verify DB-SC-03218, Quarterly Functional Test of RE 4598BA, Station Vent Normal Range Radiation Monitor is current Comment:
Cue: (if asked) DB-SC-03218 for RE4598BA Tech. Spec. late date is 5/7/04
Cue: (if asked) DB-SC-03218 for RE4598BA Tech. Spec. late date is 5/7/04
____________________________________________________________________________
____________________________________________________________________________
: 9. Performance step: Verify the surveillance requirements are current
: 9. Performance step: Verify the surveillance requirements are current Standard: Check DB-SC-03200, Shift Channel Check of the Radiation Monitoring System is current Comment: Status of DB-SC-03200 can be obtained from the Unit Log Cue: (if asked) DB-SC-03200 was completed (todays date)
 
____________________________________________________________________________
Standard: Check DB-SC-03200, Shift Channel Check of the Radiation Monitoring System is current   Comment: Status of DB-SC-03200 can be obtained from the Unit Log Cue: (if asked) DB-SC-03200 was completed (today's date)
: 10. Performance step: Verify the surveillance requirements are current Standard: Check DB-CN-03008, Station Vent Releases, Weekly Radiological Monitoring, Sampling and Analysis is current Comment: Status of DB-CN-03008 can be obtained from the Unit Log Cue: (if asked) DB-CN-03008 was completed (yesterdays date)
____________________________________________________________________________
____________________________________________________________________________
: 10. Performance step: Verify the surveillance requirements are current Standard: Check DB-CN-03008, Station Vent Releases, Weekly Radiological Monitoring, Sampling and Analysis is current 
Page 4 of 7


Comment: Status of DB-CN-03008 can be obtained from the Unit Log Cue: (if asked) DB-CN-03008 was completed (yesterday's date)
____________________________________________________________________________
Page 5 of 7
____________________________________________________________________________
____________________________________________________________________________
: 11. Performance step: Recognize that both Station Vent flow monitors are inoperable
: 11. Performance step: Recognize that both Station Vent flow monitors are inoperable
____ Standard: Circle UNSAT in item 4.i and record Offsite Dose Calculation Manual (ODCM) action statement in item 5.a, Attachment 1 Comment: ODCM action statement for both flow channels inoperable is to estimate flow rate every 12 hours Cue: (If asked) Another SRO is making the Operability Tracking Log entries
____
Standard: Circle UNSAT in item 4.i and record Offsite Dose Calculation Manual (ODCM) action statement in item 5.a, Attachment 1 Comment: ODCM action statement for both flow channels inoperable is to estimate flow rate every 12 hours Cue: (If asked) Another SRO is making the Operability Tracking Log entries
____________________________________________________________________________
____________________________________________________________________________
: 12. Performance step: Request Shift Manager approval for the release Standard: Communication with the Shift Manager                                                                  
: 12. Performance step: Request Shift Manager approval for the release Standard: Communication with the Shift Manager Comment:
 
____________________________________________________________________________
Comment: ____________________________________________________________________________
Terminating Cue: This JPM is complete Page 5 of 7
Terminating Cue: This JPM is complete  
 
Page 6 of 7  
 
VERIFICATION OF COMPLETION Job Performance Measure No. __SRO  D
______  Examinee's Name:                       


VERIFICATION OF COMPLETION Job Performance Measure No. __SRO D______
Examinee's Name:
Examiner's Name:
Examiner's Name:
Date performed:
Date performed:
Facility Evaluator:  
Facility Evaluator:
 
Number of attempts:
Number of attempts:  
 
Time to complete:
Time to complete:
Question Documentation:
Question Documentation:
 
Question:____________________________________________________________________
Question:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Response:___________________________________________________________________
Response:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Result: SAT or UNSAT Examiner's signature and date: _______________________________    __________
Result: SAT or UNSAT  
Page 6 of 7


Examiner's signature and date:  _______________________________    __________
JPM SRO D Simulator Instructions If the simulator is used, setup the simulator in a Mode 3, NOP, NOT IC.
Page 7 of 7 JPM SRO D Simulator Instructions If the simulator is used, setup the simulator in a Mode 3, NOP, NOT IC.
Raise Containment pressure to 20 inches.
Raise Containment pressure to 20 inches.  
Page 7 of 7


Page 1 of 8 Appendix C   Job Performance Measure       Form ES-C-1       Worksheet  
Appendix C                               Job Performance Measure                         Form ES-C-1 Worksheet Facility:   Davis-Besse ________ _                             Task No: _334-004-05-0300_________
 
Task Title: Manually Activate the Emergency Response Organization Group Page_____________
Facility:     Davis-Besse ________ _     Task No: _334-004-05-0300_________
Task Title:   Manually Activate the Emergency Response Organization Group Page_____________
K/A  
K/A  


==Reference:==
==Reference:==
GEN 2.4.43 2.8/3.5     Job Performance Measure No: _SRO E Examinee:                                   __     NRC Examiner: ___________________
GEN 2.4.43 2.8/3.5                               Job Performance Measure No: _SRO E Examinee:                             __                       NRC Examiner: ___________________
Facility Evaluator: ______________   Date: ___________________________                
Facility Evaluator: ______________                             Date: ___________________________
 
Method of testing:
Method of testing:
Simulated Performance ______X________   Actual Performance __________
Simulated Performance ______X________                           Actual Performance __________
Classroom ________________ Simulator ______X_________ Plant __________
Classroom ________________               Simulator ______X_________           Plant __________
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: The plant is in Mode 1. An Alert has been declared due to the loss of both trains of Decay Heat Removal per EAL 3.B.1.  
Initial Conditions: The plant is in Mode 1. An Alert has been declared due to the loss of both trains of Decay Heat Removal per EAL 3.B.1.
 
Task Standard: Recognize the Computerized Automatic Notification System (CANS) is not responding. Manually activate the ERO Group Page.
Task Standard: Recognize the Computerized Automatic Notification System (CANS) is not responding. Manually activate the ERO Group Page.
Required Materials: None General  
Required Materials: None General  


==References:==
==References:==
RA-EP-02110, Emergency Notification; Emergency Plan Telephone Directory Initiating Cue: Security is not available to make emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with step 6.2 of RA-EP-001700, Alert.
RA-EP-02110, Emergency Notification; Emergency Plan Telephone Directory Initiating Cue: Security is not available to make emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with step 6.2 of RA-EP-001700, Alert.
Time Critical Task: No Validation Time: 8 Minutes  
Time Critical Task: No Validation Time: 8 Minutes Page 1 of 8


Page 2 of 8 Initiating Cues The plant is in Mode 1. An Alert has been declared due to the loss of both trains of Decay Heat Removal per EAL 3.B.1.
Initiating Cues The plant is in Mode 1.
An Alert has been declared due to the loss of both trains of Decay Heat Removal per EAL 3.B.1.
Security is not available to make emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with in accordance with step 6.2 of RA-EP-001700, Alert.
Security is not available to make emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with in accordance with step 6.2 of RA-EP-001700, Alert.
Page 3 of 8 PERFORMANCE INFORMATION (Denote critical steps with a check mark)
Page 2 of 8
 
PERFORMANCE INFORMATION (Denote critical steps with a check mark)
____________________________________________________________________________
____________________________________________________________________________
: 1. Performance step: Make notifications to the ERO  
: 1. Performance step: Make notifications to the ERO Standard: Refer to RA-EP-02110, Emergency Notifications Comment: None
 
Standard: Refer to RA-EP-02110, Emergency Notifications Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 2. Performance step: Obtain a scenario activation password Standard: Obtain the Emergency Directors password, if the examinee does not have his/her own password Comment: Password needed to activate CANS. Password is individual's social security number  
: 2. Performance step: Obtain a scenario activation password Standard: Obtain the Emergency Directors password, if the examinee does not have his/her own password Comment: Password needed to activate CANS. Password is individuals social security number Cue: (If asked) The password is 123-45-6789
 
Cue: (If asked) The password is 123-45-6789
____________________________________________________________________________
____________________________________________________________________________
: 3. Performance step: Obtain the Emergency Classification                                                      
: 3. Performance step: Obtain the Emergency Classification Standard: Recognize the Emergency Classification is an Alert as provided in the Initial Conditions Comment: None
 
Standard: Recognize the Emergency Classification is an Alert as provided in the Initial Conditions Comment: None                                                                    
 
____________________________________________________________________________
____________________________________________________________________________
: 4. Performance step: Obtain the CANS access number Standard: Obtain the CANS access number from the Emergency Plan Telephone Directory
: 4. Performance step: Obtain the CANS access number Standard: Obtain the CANS access number from the Emergency Plan Telephone Directory Comment: CANS number is 9-419-249-2412 OR dial extension 2412 Cue: The CANS number is busy. CANS does not answer.
 
Comment: CANS number is 9-419-249-2412 OR dial extension 2412  
 
Cue: The CANS number is busy. CANS does not answer.
____________________________________________________________________________
____________________________________________________________________________
: 5. Performance step: Contact CANS Standard: Dial the CANS phone number Comment: CANS number will be busy Cue: The CANS number is busy. CANS does not answer.
: 5. Performance step: Contact CANS Standard: Dial the CANS phone number Comment: CANS number will be busy Cue: The CANS number is busy. CANS does not answer.
______________________________________________________________________________
______________________________________________________________________________
Page 4 of 8
Page 3 of 8
 
____________________________________________________________________________
____________________________________________________________________________
: 6. Performance step: Contact CANS Standard: Dial the CANS phone number a second time
: 6. Performance step: Contact CANS Standard: Dial the CANS phone number a second time Comment: None Cue: The CANS number is busy. CANS does not answer.
 
Comment: None  
 
Cue: The CANS number is busy. CANS does not answer.
______________________________________________________________________________
______________________________________________________________________________
: 7. Performance step: Recognize CANS failure
: 7. Performance step: Recognize CANS failure
Line 1,011: Line 920:
____________________________________________________________________________
____________________________________________________________________________
: 8. Performance step: Obtain the Emergency Classification
: 8. Performance step: Obtain the Emergency Classification
____ Standard: Recognize the Emergency Classification is an Alert as provided in the Initial Conditions Comment: None
____
Standard: Recognize the Emergency Classification is an Alert as provided in the Initial Conditions Comment: None
____________________________________________________________________________
____________________________________________________________________________
: 9. Performance step: Obtain the ERO Numeric group pager number
: 9. Performance step: Obtain the ERO Numeric group pager number
____ Standard: Obtain the group pager number from the Emergency Plan Telephone Directory
____
 
Standard: Obtain the group pager number from the Emergency Plan Telephone Directory Comment: Group pager number is 9-1-800-405-4758 Cue: (If the candidate does not dial 9) The number you have requested can not be completed as dialed. Please check the number and dial again.
Comment: Group pager number is 9-1-800-405-4758 Cue: (If the candidate does not dial 9) The number you have requested can not be completed as dialed. Please check the number and dial again.  
 
____________________________________________________________________________
____________________________________________________________________________
: 10. Performance step: Contact the pager system
: 10. Performance step: Contact the pager system
____ Standard: Dial the pager number Comment: None  
____
Standard: Dial the pager number Comment: None Cue: Group pager number has been dialed. The pager system asks for the pager number.
____________________________________________________________________________
Page 4 of 8


Cue: Group pager number has been dialed. The pager system asks for the pager number.
____________________________________________________________________________
Page 5 of 8
____________________________________________________________________________
____________________________________________________________________________
: 11. Performance step: Enter the pager number
: 11. Performance step: Enter the pager number
____ Standard: Enter pager number 2533024                                                                  
____
 
Standard: Enter pager number 2533024 Comment: None Cue: Pager number 2533024 has been entered. The pager system asks for the numeric message followed by the # (pound) key
Comment: None  
 
Cue: Pager number 2533024 has been entered. The pager system asks for the numeric message followed by the "#" (pound) key
____________________________________________________________________________
____________________________________________________________________________
: 12. Performance step: Enter the classification code
: 12. Performance step: Enter the classification code
____ Standard: Enter 2222                                                                  
____
 
Standard: Enter 2222 Comment: None Cue: 2222 has been entered
Comment: None Cue: 2222 has been entered
____________________________________________________________________________
____________________________________________________________________________
: 13. Performance step: Depress the (#) key
: 13. Performance step: Depress the (#) key
____ Standard: Depress the (#) key
____
 
Standard: Depress the (#) key Comment: None Cue: The # key has been depressed
Comment: None Cue: The # key has been depressed
____________________________________________________________________________
____________________________________________________________________________
: 14. Performance step: Contact the pager system
: 14. Performance step: Contact the pager system
____ Standard: Dial the pager number a second time                                                                
____
Standard: Dial the pager number a second time Comment: None Cue: Group pager number has been dialed. The pager system asks for the pager number.
____________________________________________________________________________
Page 5 of 8


Comment: None Cue: Group pager number has been dialed. The pager system asks for the pager number.
____________________________________________________________________________
Page 6 of 8
____________________________________________________________________________
____________________________________________________________________________
: 15. Performance step: Enter the pager number
: 15. Performance step: Enter the pager number
____ Standard: Enter pager number 2533024 a second time                                                                  
____
 
Standard: Enter pager number 2533024 a second time Comment: None Cue: Pager number 2533024 has been entered. The pager system asks for the numeric message followed by the # (pound) key
Comment: None  
 
Cue: Pager number 2533024 has been entered. The pager system asks for the numeric message followed by the "#" (pound) key
____________________________________________________________________________
____________________________________________________________________________
: 16. Performance step: Enter the classification code a second time
: 16. Performance step: Enter the classification code a second time
____ Standard: Enter 2222                                                                  
____
 
Standard: Enter 2222 Comment: None Cue: 2222 has been entered
Comment: None Cue: 2222 has been entered
____________________________________________________________________________
____________________________________________________________________________
: 17. Performance step: Depress the (#) key a second time
: 17. Performance step: Depress the (#) key a second time
____ Standard: Depress the (#) key
____
 
Standard: Depress the (#) key Comment: None Cue: The # key has been depressed
Comment: None Cue: The # key has been depressed
____________________________________________________________________________
: 18. Performance step: Verify the group page functioned properly Standard: Verify the Control Room pager indicates 2222 Comment: None Cue: Five minutes have elapsed. The Control Room pager has gone off twice, indicating 2222.
____________________________________________________________________________
____________________________________________________________________________
: 18. Performance step: Verify the group page functioned properly Standard: Verify the Control Room pager indicates 2222 Comment: None
Terminating Cue: This JPM is complete Page 6 of 8
 
Cue: Five minutes have elapsed. The Control Room pager has gone off twice, indicating 2222. ____________________________________________________________________________
Terminating Cue: This JPM is complete  
 
Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No. _SRO  E
_______  Examinee's Name:                       
 
Examiner's Name:


VERIFICATION OF COMPLETION Job Performance Measure No. _SRO E_______
Examinee's Name:
Examiner's Name:
Date performed:
Date performed:
Facility Evaluator:
Facility Evaluator:
Number of attempts:  
Number of attempts:
 
Time to complete:
Time to complete:  
 
Question Documentation:
Question Documentation:
Question:____________________________________________________________________
Question:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Response:___________________________________________________________________
Response:___________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________  
____________________________________________________________________________
 
Result: SAT or UNSAT Examiner's signature and date: _______________________________    __________
Result: SAT or UNSAT  
Page 7 of 8


Examiner's signature and date:  _______________________________    __________
JPM SRO E Simulator Instructions Setup the simulator to any IC Page 8 of 8}}
Page 8 of 8 JPM SRO E Simulator Instructions Setup the simulator to any IC}}

Revision as of 01:04, 24 November 2019

Final As-Administered Administrative Jpms for Davis-Besse Initial Examination - May 2004
ML041820340
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/03/2004
From: House J
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
-RFPFR, 50-346/04-301
Download: ML041820340 (66)


Text

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse ________ _ Task No: _115-036-01-0100_________

Task Title: Calculate a Shutdown Margin with 2 Stuck Rods______________________________

K/A

Reference:

001-A4.11 3.5/4.1 Job Performance Measure No: _RO A_

Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance ____X______

Classroom ________________ Simulator ______X_________ Plant ___________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The Plant is in Mode 3 following a Reactor trip. Two control rods failed to insert on the Reactor trip. The START program is NOT available. The plant is at 100 EFPD, Boron Concentration is 2390 ppmB, Tave is 532ºF, Transient Poison Worth is -0.27% K/K, Reactivity worth of Anomaly is -0.13% K/K, Boron Correction Factor is 0.96.

Task Standard: Calculate Shutdown Margin with 2 stuck control rods Required Materials: Calculator General

References:

DB-NE-06202, Reactivity Balance Calculations, DB-NE-06201, Reactor Operators Curve Book, and Core Operating Limits Report Initiating Cue: The Unit Supervisor directs you to perform a Shutdown Margin Calculation in accordance with DB-NE-06202, Reactivity Balance Calculations.

Time Critical Task: No Validation Time: 29 Minutes Page 1 of 6

Initiating Cue The Plant is in Mode 3 following a Reactor trip. Two control rods failed to insert on the Reactor trip. The START program is NOT available.

Burnup: 100 EFPD Boron Concentration: 2390 ppmB Tave: 532ºF.

Transient Poison Worth: -0.27% K/K Reactivity worth of Anomaly: -0.13% K/K Boron Correction Factor: 0.96.

The Unit Supervisor directs you to perform a Shutdown Margin Calculation in accordance with DB-NE-06202, Reactivity Balance Calculations.

Page 2 of 6

PERFORMANCE INFORMATION (Denote critical steps with a check mark)

___________________________________________________________________________

1. Performance Step: Determine minimum boron to ensure 1% K/K SDM.

____

Standard: From figure 6C, determine value of 2320 to 2340 ppmB and enter on Attachment 10.

Comment: Actual value should be 2325 pmmB.

____________________________________________________________________________

2. Performance Step: Determine value of corrected boron concentration.

____

Standard: Divide the RCS boron concentration (2325 ppmB) by the Boron Correction Factor

(.96) to obtain a value of 2416 to 2438 ppmB.

Comment: Actual value should be 2325 ppmB divided by 0.96 for a final value of 2422 ppmB.

____________________________________________________________________________

3. Performance Step: Enter the value of Reactivity Worth Anomaly.

____

Standard: Enter a value of -0.13 %K/K, from the initial conditions.

Comment: None

____________________________________________________________________________

4. Performance Step: Determine corrected RCS boron concentration.

____

Standard: Multiply the RCS boron of 2390 ppmB by the Boron Correction Factor of 0.96 for a final value of 2294.4 ppmB.

Comment: None

____________________________________________________________________________

5. Performance Step: Determine Differential Boron Worth

____

Standard: From Figure 5A determine a value of -0.00612 to -0.00616 %K/K/ppmB using the corrected RCS boron concentration of 2294.4 ppmB and enter on Attachment 10.

Comment: Actual value of -.00614 %K/K/ppmB.

____________________________________________________________________________

Page 3 of 6

____________________________________________________________________________

6. Performance Step: Determine the corrected Anomaly Worth

____

Standard: Divide the Reactivity Worth Anomaly (-0.13 %K/K) by the Differential Boron Worth (-

0.00612 to -0.00616 %K/K/ppmB) to obtain a value of 21.1 to 21.3 Comment: Actual value of 21.17

____________________________________________________________________________

7. Performance Step: Determine Transient Poison Boron Equivalent

____

Standard: Multiply Transient Poison Worth (-0.27) and Transient Poison Conversion Factor (85) then divide by the Boron Correction Factor (.96) to obtain a value of 23.9. Enter on Attachment 10.

Comment: None

____________________________________________________________________________

8. Performance Step: Determine minimum boron concentration to ensure 1% Shutdown Valve.

____

Standard: Calculate minimum boron for 1% SDV on Attachment 10 to obtain a value of 2274 to 2285 ppmB.

Comment: Actual value of 2377 ppmB.

____________________________________________________________________________

Terminating Cues: This JPM is complete.

Page 4 of 6

VERIFICATION OF COMPLETION Job Performance Measure No. ____RO A______

Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT Examiner's signature and date: _______________________________ __________

Page 5 of 6

JPM RO A Simulator Instructions If performed on the simulator, this JPM can setup at any IC Page 6 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse ________ _ Task No: _119-004-03-0400_________

Task Title: Control of Locked Valves During Post-Maintenance Testing______________________

K/A

Reference:

GEN 2.2.12 3.0/3.4 Job Performance Measure No: _RO C Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance ______X________ Actual Performance __________

Classroom ________________ Simulator _______X_________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: Maintenance has completed a packing adjustment on valve DH2736, DH Aux.

Spray Throttle Valve, to stop a packing leak per Order 200001155.

Task Standard: Stroke and time DH2736 and make the appropriate locked valve log entries.

Required Materials: Pump and Valve Basis Document, Stop watch and Locked Valve Log General

References:

DB-PF-03272, Post Maintenance Valve Test, DB-OP-00008, Operation and Control of Locked Valves Initiating Cue: The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve.

An equipment operator is standing by in the Auxiliary Building.

The Locked Valve Log is in the Control Room.

The Shift Manager has completed the first 8 columns in the Locked Valve Log.

Time Critical Task: No Validation Time: 25 Minutes Page 1 of 8

Initiating Cues Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.

The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2.

DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve.

An equipment operator is standing by in the Auxiliary Building.

The Locked Valve Log is in the Control Room.

The Shift Manager has completed the first 8 columns in the Locked Valve Log.

Page 2 of 8

PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Check Verify section 3.1 is complete Comment: None

____________________________________________________________________________

2. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Verify a RWP is available Comment: None Cue: (If asked) A special RWP is not required for this test.

____________________________________________________________________________

3. Performance step: Obtain stroke times from the Pump and Valve Basis Document and record on Attachment 2

____

Standard: Enter the maximum close time of 59.70 seconds, the maximum open time of 59.62 seconds, the expected close time range of 33.83 seconds to 45.77 seconds and the expected open time range of 33.78 seconds to 45.71 seconds in step 3.2.3 of DB-PF-03272 Comment: None

____________________________________________________________________________

4. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Obtain Shift Manager's permission to perform the test Comment: None Cue: (If asked) the Shift Manager has given permission to stroke test DH 2736

____________________________________________________________________________

5. Performance step: Record test equipment data Standard: Record the M&TE number for the stopwatch and the calibration due date Comment: None Cue: (If asked) A special DB-OP-00016 lineup is NOT required

____________________________________________________________________________

Page 3 of 8

____________________________________________________________________________

6. Performance step: Verity the Equipment Operator is at DH 2736 Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: An Equipment Operator is standing by to verify local valve position

____________________________________________________________________________

7. Performance step: Stoke DH 2736 open and record time

____

Standard: Depress and hold the OPEN pushbutton and stroke time using the stopwatch. Record the stroke time.

Comment: DH 2736 is a throttle valve, which requires the OPEN pushbutton to be depressed while the valve is stroking DH 2736 will stroke faster than the expected time.

____________________________________________________________________________

8. Performance step: Contact the Equipment Operator to check local indication Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is open

____________________________________________________________________________

9. Performance step: Complete the "Position To" column in the Locked Valve Log

____

Standard: Enter "Open" Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

10. Performance step: Complete the "Position By" column in the Locked Valve Log

____

Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

Page 4 of 8

____________________________________________________________________________

11. Performance step: Stoke DH 2736 closed and record time

____

Standard: Depress and hold the CLOSED pushbutton and stroke time using the stopwatch.

Record the stroke time.

Comment: None

____________________________________________________________________________

12. Performance step: Contact the Equipment Operator to check local indication Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is closed

____________________________________________________________________________

13. Performance step: Complete the "Restored By" column in the Locked Valve Log

____

Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

14. Performance step: Recognize the stroke times are not within the expected times Standard: Compare valve stroke times to the expected range of stroke times Comment: None

____________________________________________________________________________

15. Performance step: Restoke DH 2736 and record times

____

Standard: Recognize the test requires the valve to be stroke timed a second time Comment: None Cue: DH 2736 has been stroked open and closed a second time. The stroke times are the same as recorded in step 4.2.2

____________________________________________________________________________

Page 5 of 8

____________________________________________________________________________

16. Performance step: Inform the Unit Supervisor or Shift Manager the stroke times are not with in the expected range

____

Standard: Communicate to a shift SRO the need to write a Condition Report and perform an Operability Justification Comment: None Cue: The Shift Manager will write the Condition Report and document the Operability Justification

____________________________________________________________________________

17. Performance step: Complete acceptance criteria

____

Standard: Sign off steps 5.2 and 5.3 Comment: None

____________________________________________________________________________

Terminating Cue: This JPM is complete Page 6 of 8

VERIFICATION OF COMPLETION Job Performance Measure No. ____RO C______

Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT Examiner's signature and date: _______________________________ __________

Page 7 of 8

JPM RO C Simulator Instructions Setup the simulator to any Mode 1, 2, or 3 IC at NOP and NOT.

Page 8 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse ________ _ Task No: _071-001-02-0100_________

Task Title: Containment Pressure Reduction Release___________________________________

K/A

Reference:

GEN 2.3.11 2.7/3.2 Job Performance Measure No: _RO D Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance __________

Classroom ________________ Simulator ________________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H2O. A release permit has been prepared and approved.

Task Standard: Initiate a pressure release of Containment and stop the Containment release when the Main Station Exhaust Fans are found not running.

Required Materials: None General

References:

DB-OP-03012, Radioactive Gaseous Batch Release Initiating Cue: The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.8 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction.

Time Critical Task: No Validation Time: 15 Minutes Page 1 of 7

Initiating Cues A plant heatup is in progress.

Containment to annulus differential pressure has risen to 20 inches H2O.

A release permit has been prepared and approved.

The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.8 of DB-OP-03012, Radioactive Gaseous Batch Release.

An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction.

Page 2 of 7

PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Place computer point P318 on trend

____

Standard: Use the plant process computer to trend CTMT PRESS DIFF TO ANNULUS Comment: Exceptable to trend on the computer CRT or on the analog trend pens Cue: P318 reads 20 inches. (If asked) The Unit Supervisor requests a 60-second trend

____________________________________________________________________________

2. Performance step: Request the Shift Manager approval of the release

____

Standard: Communicate with the Shift Manager Comment: Role play as the Shift Manager to sign and date Item 4.l on Attachment 1 of DB-OP-03012

____________________________________________________________________________

3. Performance step: Verify less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> since containment was sampled Standard: Determine difference is less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> between containment sample time in Item 4.e of Attachment 1 and current time Comment: None

____________________________________________________________________________

4. Performance step: Open CV5037, H2 Purge System Ctmt Isolation

____

Standard: Press OPEN on HIS5037 Comment: Role play to provide the Independent Verification for opening CV 5037

____________________________________________________________________________

5. Performance step: Open CV5038, H2 Purge System Ctmt Isolation

____

Standard: Press OPEN on HIS5038 Comment: Role play to provide the Independent Verification for opening CV 5038

____________________________________________________________________________

Page 3 of 7

____________________________________________________________________________

6. Performance step: Direct the Equipment Operator to open the containment release skid discharge gate, to start the skid fan and to maintain flow rate at approximately 1400 on the M&TE anemometer readout.

____

Standard: Communicate via the GAI-TRONICS or radio Comment: May direct the Equipment Operator to perform steps 4.6.13, 4.6.14 and 4.6.15.

Cue: The Equipment Operator reports steps 4.6.13, 4.6.14 and 4.6.15 are complete. Step 4.6.13 has been independently verified. Skid flow rate is 1400 on the local anemometer.

____________________________________________________________________________

7. Performance step: Make a Unit Log entry Standard: Record start time, release permit number and containment to annulus differential pressure in the Unit Log Comment: None Cue: The secondary side Reactor Operator has made Unit Log entry for release start time, release permit number and containment to annulus differential pressure

____________________________________________________________________________

8. Performance step: Update the release permit Standard: Record start date and time and containment to annulus P in Item 6 of Attachment 1 Comment: After the release is started an Equipment Operator will contact the Control Room to report that the Main Station Exhaust Fans are not running Cue: This is the Zone 3 Equipment Operator. I am in Fan Alley. Neither one of the Main Station Exhaust Fans are running.

____________________________________________________________________________

9. Performance step: Recognize the release should be stopped

____

Standard: Communicate to the Equipment Operator the need to stop the Containment Pressure Release Skid Fan Comment: None Cue: The Containment Pressure Release Skid Fan has been stopped.

____________________________________________________________________________

Page 4 of 7

____________________________________________________________________________

10. Performance step: Close CV5037, H2 Purge System Ctmt Isolation

____

Standard: Press CLOSE on HIS5037 Comment: None

____________________________________________________________________________

11. Performance step: Close CV5038, H2 Purge System Ctmt Isolation

____

Standard: Press CLOSE on HIS5038 Comment: None

____________________________________________________________________________

12. Performance step: Notify the Shift Manager the release has been stopped Standard: Communicate with the Shift Manager Comment: None Cue: The Shift Manager acknowledges the Containment Pressure Reduction Release has been stopped.

____________________________________________________________________________

Terminating Cue: This JPM is complete Page 5 of 7

VERIFICATION OF COMPLETION Job Performance Measure No. _RO D_______

Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT Examiner's signature and date: _______________________________ __________

Page 6 of 7

JPM RO D Simulator Instructions Setup the simulator in a Mode 3, NOP, NOT IC.

Raise Containment pressure to 20 inches.

Fail Computer Point P318 to 20 inches.

Page 7 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse ________ _ Task No: _000-080-05-0100_________

Task Title: Offsite Dose Assessment Using a Nomogram________________________________

K/A

Reference:

GEN 2.4.39 3.3/3.1 Job Performance Measure No: _RO E Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance _____X____

Classroom ________________ Simulator ________X_______ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The reactor has been tripped due to an unisolable steam leak on Steam Generator 2. Steam Generator 2 is at 0 psig. SFRCS has actuated and both Auxiliary Feedwater Pumps Turbines (AFPT) are running. After Steam Generator 2 depressurized, a tube leak developed in Steam Generator 1. An RCS cooldown to 500 ºF is in progress using Atmospheric Vent Valve 1(AVV). The Safety Parameter Display System (SPDS) terminals are not available. Lower T is +1.0 ºF. Wind speed is 8 MPH. RE 609 is reading 4 X 105 CPM.

Task Standard: Using a nomogram, determine the off-site TEDE dose levels at the site boundary, the two mile, the five mile and the ten mile limits.

Required Materials: Straightedge or ruler, calculator General

References:

RA-EP-02240, Offsite Dose Assessment, and Offsite Dose Assessment Nomogram Initiating Cue: The Shift Manager directs you to calculate a projected offsite Total Effective Dose Equivalent (TEDE) rate using the offsite dose assessment nomogram in accordance with RA-EP-02240, Offsite Dose Assessment.

Time Critical Task: No Validation Time: 13 Minutes Page 1 of 7

Initiating Cues The reactor has been tripped due to an unisolable steam leak on Steam Generator 2.

Steam Generator 2 is at 0 psig.

SFRCS has actuated and both Auxiliary Feedwater Pumps Turbines (AFPT) are running.

After Steam Generator 2 depressurized, a tube leak developed in Steam Generator 1.

An RCS cooldown to 500 ºF is in progress using Atmospheric Vent Valve 1(AVV).

The Safety Parameter Display System (SPDS) terminals are not available.

Lower T is +1.0 ºF Wind speed is 8 MPH RE 609 is reading 4 X 105 CPM The Shift Manager directs you to calculate a projected offsite Total Effective Dose Equivalent (TEDE) rate using the offsite dose assessment nomogram in accordance with RA-EP-02240, Offsite Dose Assessment.

Page 2 of 7

PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Determine the release pathway Standard: Determine the release pathway is from both AFPT exhausts and from AVV 1 Comment: The flow rates for both AFPTs and AVV 1 can be added together or the TEDE rates for each of the flow paths can be added together

____________________________________________________________________________

2. Performance step: Locates the procedural guidance Standard: Identifies Attachment 2 of RA-EP-02240, Offsite Dose Assessment, as correct procedural guidance Comment: None

____________________________________________________________________________

3. Performance step: Obtain a Nomogram Standard: Obtain a Nomogram Comment: None

____________________________________________________________________________

4. Performance step: Record name, date and time on nomogram Standard: Write the information on the nomogram Comment: None

____________________________________________________________________________

5. Performance step: Plot the radiation monitor reading

____

Standard: From initial conditions, plot RE 609 reading of 4 X 105 CPM on scale B Comment: None

____________________________________________________________________________

6. Performance step: Plot the flow rate

____

Standard: Mark a flow rate of 5 to 6 KCFM on scale A Comment: Actual value is 5.06 KCFM. 0.33 KCFM for each AFPT and 4.4 KCFM for the AVV.

____________________________________________________________________________

Page 3 of 7

____________________________________________________________________________

7. Performance step: Plot the release rate

____

Standard: Draw a line from scale B to scale A to obtain a release rate of 10 to 20 Curries/sec Comment: Actual release rate value is 12 Curries/sec

____________________________________________________________________________

8. Performance step: Plot the lower T

____

Standard: From initial conditions, plot lower T of +1.0 ºF on scale 1.

Comment: Lower T of +1.0 ºF is equivalent to a stability class E

____________________________________________________________________________

9. Performance step: Plot the wind speed

____

Standard: From initial conditions, plot a wind speed of 8 MPH on scale 2 Comment: None

____________________________________________________________________________

10. Performance step: Plot the X/Q value

____

Standard: Draw a line from scale 1 to scale 2 to obtain a X/Q value of 4 X 10-5 to 6 X 10-5 sec/m3 on scale 3 Comment: Actual X/Q value is 5 X 10-5

____________________________________________________________________________

11. Performance step: Plot the TEDE value at the site boundary

____

Standard: Draw a line from scale C to scale 3 to obtain a TEDE value of 0.4 to 1 rem/hr and plot on scale 4 Comment: Actual TEDE rate at the site boundary is 0.8 rem/hr

____________________________________________________________________________

Page 4 of 7

____________________________________________________________________________

12. Performance step: Determine the TEDE rate at 2 miles

____

Standard: Divide the site boundary TEDE rate by 5 to obtain a TEDE rate at 2 miles of 0.08 rem/hr to 0.2 rem/hr and record on the nomogram Comment: Actual TEDE rate at 2 miles is 0.16 rem/hr

____________________________________________________________________________

13. Performance step: Determine the TEDE rate at 5 miles

____

Standard: Divide the site boundary TEDE rate by 15 to obtain a TEDE rate at 5 miles of 0.027 rem/hr to 0.067 rem/hr and record on the nomogram Comment: Actual TEDE rate at 5 miles is 0.053 rem/hr

____________________________________________________________________________

14. Performance step: Determine the TEDE rate at 10 miles

____

Standard: Divide the site boundary TEDE rate by 40 to obtain a TEDE rate at 10 miles of 0.01 rem/hr to 0.025 rem/hr and record on the nomogram Comment: Actual TEDE rate at 10 miles is 0.02 rem/hr

____________________________________________________________________________

Terminating Cue: This JPM is complete.

Page 5 of 7

VERIFICATION OF COMPLETION Job Performance Measure No. _RO E______

Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT Examiner's signature and date: _______________________________ __________

Page 6 of 7

JPM RO E Simulator Instructions Setup the simulator to any IC Page 7 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse ________ _ Task No: _336-005-03-0300_________

Task Title: _Notification to the Federal Aviation Administration for Cooling Tower Aviation__

Light Failure ___________________________________________________________________

K/A

Reference:

GEN 2.1.17 3.5/3.6 Job Performance Measure No: SRO A_

Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance ______X________ Actual Performance __________

Classroom ________________ Simulator _______X________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is at 100% power. You are the Shift Manager.

Task Standard: Notify the Federal Aviation Administration of a problem with the Cooling Tower Aviation Lighting Required Materials: None General

References:

DB-OP-00002, Operations Section Event/Incident Notifications and Actions, EO-02, Cooling Tower and Microwave Tower Aviation Lighting Malfunctions Initiating Cue: The security supervisor reports that two of the red beacons on top of the Cooling Tower are not flashing.

Time Critical Task: No Validation Time: 8 Minutes Page 1 of 8

Initiating Cue The plant is at 100% power. You are the Shift Manager.

The security supervisor reports that two of the red beacons on top of the Cooling Tower are not flashing.

Page 2 of 8

PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Locate guidance for notifying the Federal Aviation Administration Standard: Use Operations Directive EO-02, Cooling Tower and Microwave Tower Aviation Lighting Malfunctions Comment: May go to DB-OP-00002 first but guidance is contained in EO-02

____________________________________________________________________________

2. Performance step: Notify Electrical Maintenance and/or Electrical Systems Engineering

____

Standard: Communicate via the GAI-TRONICS or telephone Comment: May contact the Work Week Manager Cue: Need to contact the vendor. Trouble shooting and repairing the Cooling Tower lights will take approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

____________________________________________________________________________

3. Performance step: Notify the Federal Aviation Administration

____

Standard: Communicate using the telephone Comment: Dial 9-1-800-992-7433, #, *, 9, 9 OR 9-1-216-265-8070 Cue: (If the candidate does not dial 9) The number you have requested can not be completed as dialed. Please check the number and dial again.

Cue: Answer as the Federal Aviation Administration

____________________________________________________________________________

4. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide name Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

Page 3 of 8

____________________________________________________________________________

5. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide reason for call - Davis-Besse Unit 1 Hyperbolic Cooling Tower Aviation Lighting problem Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

6. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide exact lighting problem - Two of the eight red beacons are not flashing Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

7. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide time of occurrence Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

8. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide estimated return to service date of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

Page 4 of 8

____________________________________________________________________________

9. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide latitude and longitude of the cooling tower - 41°35'57"/83°05'28" Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

10. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide the height of the cooling tower - 493'AGL/1077AMSL Comment: AGL - Above Ground Level, AMSL - Above Mean Sea Level Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

11. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide location of the nearest airport - Port Clinton, 10 miles WNW Comment: Davis-Besse cooling tower does not have an FCC registration number Cue: Ask if the cooling tower has an FCC registration number.

____________________________________________________________________________

12. Performance step: Notify the Federal Aviation Administration Standard: Request a NOTAM number Comment: NOTAM - Notice to AirMen Cue: Provide the NOTAM number of 04-AGL-00129

____________________________________________________________________________

Page 5 of 8

____________________________________________________________________________

13. Performance step: Log Federal Aviation Administration notification in the Unit Log Standard: Make Unit Log entry with the following details:

Time of occurrence Details of problem Time FAA was notified Time Electrical Maintenance/Plant Engineering was notified NOTAM number Comment: Unit Log may be available if JPM is performed on the simulator Cue: Ask what information will be recorded in the Unit Log

____________________________________________________________________________

Terminating Cue: This JPM is complete.

Page 6 of 8

VERIFICATION OF COMPLETION Job Performance Measure No. _SRO A_______

Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT Page 7 of 8

JPM SRO A Simulator Instructions If performed on the simulator, this JPM can setup at any IC Page 8 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse ________ _ Task No: _333-011-01-0300_________

Task Title: Review and Correct a Shutdown Margin Calculation____________________________

K/A

Reference:

GEN 2.1.12 2.9/4.0 Job Performance Measure No: _SRO B Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance ____X______

Classroom ________________ Simulator ______X_________ Plant ___________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is in Mode 3 following a reactor trip. The START program is not available. The following conditions exist: The plant is at 100 EFPD, RCS Boron Concentration is 1600 ppmB, Tave is 532°F, APSRs are 28.5% withdrawn, there is one known stuck rod, Reactivity worth due to transient poisons is -.27% K/K, the correction factor for boron 10 depletion is 0.99, the Reactivity Anomaly is .13% K/K.

Task Standard: Recognize Shutdown Margin is NOT adequate and apply the appropriate Technical Specifications Required Materials: Calculator General

References:

DB-NE-06202, Reactivity Balance Calculations, DB-NE-06201, Reactor Operator Curve Book Initiating Cue: The Shift Manager has directed you to check the calculation for a shutdown margin per DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operator Curve Book, Attachment 4.

Time Critical Task: No Validation Time: 22 minutes Page 1 of 7

Initiating Cue The plant is in Mode 3 following a reactor trip.

The START program is not available.

The following conditions exist:

The plant is at 100 EFPD RCS Boron Concentration is 1600 ppmB Tave is 532°F APSRs are 28.5% withdrawn There is one known stuck rod.

Reactivity worth due to transient poisons is -.27% K/K The correction factor for boron 10 depletion is 0.99 The Reactivity Anomaly is .13% K/K The Shift Manager has directed you to check the calculation for a shutdown margin per DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operator Curve Book, .

Page 2 of 7

PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Verify reactivity worth of the fuel.

Standard: From Figure 2, verify a value of 13.5% K/K to 13.6% K/K and enter this value on .

Comment: Actual value is 13.55% K/K

____________________________________________________________________________

2. Performance step: Verify the corrected boron concentration.

Standard: Verify RCS boron concentration of 1600 ppmB multiplied by the B10 correction factor of 0.99 to obtain a value of 1584ppmB Comment: None

____________________________________________________________________________

3. Performance step: Verify the reactivity worth due to boron Standard: From Figure 3, verify a value of -10.2% K/K to -10.3% K/K. From Figure 4, verify a value of 1.004 to 1.006 for the Fuel Burnup Correction Factor. Multiply to obtain a value of -

10.24% K/K to -10.36% K/K Comment: Actual value is -10.25% K/K times 1.005 = -10.3% K/K

____________________________________________________________________________

4. Performance step: Verify reactivity worth due to transient poisons.

Standard: Verify from initial conditions that the reactivity worth due to transient poisons is

-.27% K/K.

Comment: None

____________________________________________________________________________

5. Performance step: Verify the reactivity worth due to temperature.

Standard: Verify the reactivity worth due to temperature is 0 Comment: T is 0% K/K

____________________________________________________________________________

Page 3 of 7

____________________________________________________________________________

6. Performance step: Recognize the adjusted rod worth for one known stuck rod entered on the calculation sheet is incorrect

____

Standard: From Figure 10, determine rod worth of -4.18% K/K to -4.2% K/K and enter on the calculation sheet.

Comment: Actual value is -4.19% K/K. Value entered on the calculation sheet was -5.12%

K/K The candidate may choose to complete the review of the Shutdown Margin before informing the Shift Manager of the error.

Cue: The Shift Manager acknowledges the error and directs you to continue with the calculations and make any necessary corrections.

____________________________________________________________________________

7. Performance step: Verify APSR reactivity worth.

Standard: From Figure 11A, verify APSR reactivity worth of -0.11% K/K to -0.12% K/K.

Comment: Actual value is -0.115% K/K

____________________________________________________________________________

8. Performance step: Verify Flux Redistribution Penalty (FRP) using Table 1 of DB-OP-06201.

Standard: Verify Flux Redistribution Penalty is 0.35% K/K.

Comment: None

____________________________________________________________________________

9. Performance step: Verify reactivity anomaly reactivity worth from initial conditions.

Standard: Verify reactivity anomaly reactivity worth is .13% K/K.

Comment: None

____________________________________________________________________________

10. Performance step: Determine the value for shutdown margin.

____

Standard: Determine that shutdown margin is a value between .72% K/K and .97% K/K.

Comment: Actual Shutdown Margin is .845% K/K

____________________________________________________________________________

Page 4 of 7

___________________________________________________________________________

11. Performance step: Take actions for Shutdown Margin less than adequate Standard: Communicate revised Shutdown Margin to the Shift Manager Comment: None Cue: (If asked) The Shift Manager reports another SRO has reviewed the corrections and agrees that Shutdown Margin is less than 1%.

____________________________________________________________________________

12. Performance step: Take actions for Shutdown Margin less than adequate

____

Standard: Recognize the need to enter Technical Specification 3.1.1.1 Comment: May need to ask the candidate what actions are required Candidate may refer to Tech. Specs.

____________________________________________________________________________

13. Performance step: Take actions for Shutdown Margin less than adequate

____

Standard: Recognize the need to immediately initiate RCS boration Comment: May need to ask the candidate what actions are required Candidate may refer to Tech. Specs.

____________________________________________________________________________

Terminating Cues: This JPM is complete.

Page 5 of 7

VERIFICATION OF COMPLETION Job Performance Measure No. ___SRO B_______

Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT Examiner's signature and date: _______________________________ __________

Page 6 of 7

JPM SRO B Simulator Instructions If performed on the simulator, this JPM can setup at any IC Page 7 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse ________ _ Task No: _119-004-03-0400_________

Task Title: Control of Locked Valves During Post-Maintenance Testing______________________

K/A

Reference:

GEN 2.2.12 3.0/3.4 Job Performance Measure No: _SRO C Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance ______X________ Actual Performance __________

Classroom ________________ Simulator _______X_________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: Maintenance has completed a packing adjustment on valve DH2736, DH Aux.

Spray Throttle Valve, to stop a packing leak per Order 200001155.

Task Standard: Stroke and time DH2736 and make the appropriate locked valve log entries.

Required Materials: Pump and Valve Basis Document, Stop watch and Locked Valve Log General

References:

DB-PF-03272, Post Maintenance Valve Test, DB-OP-00008, Operation and Control of Locked Valves Initiating Cue: The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve.

An equipment operator is standing by in the Auxiliary Building.

The Locked Valve Log is in the Control Room.

The Shift Manager has completed the first 8 columns in the Locked Valve Log.

Time Critical Task: No Validation Time: 25 Minutes Page 1 of 8

Initiating Cues Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.

The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2.

DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve.

An equipment operator is standing by in the Auxiliary Building.

The Locked Valve Log is in the Control Room.

The Shift Manager has completed the first 8 columns in the Locked Valve Log.

Page 2 of 8

PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Check Verify section 3.1 is complete Comment: None

____________________________________________________________________________

2. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Verify a RWP is available Comment: None Cue: (If asked) A special RWP is not required for this test.

____________________________________________________________________________

3. Performance step: Obtain stroke times from the Pump and Valve Basis Document and record on Attachment 2

____

Standard: Enter the maximum close time of 59.70 seconds, the maximum open time of 59.62 seconds, the expected close time range of 33.83 seconds to 45.77 seconds and the expected open time range of 33.78 seconds to 45.71 seconds in step 3.2.3 of DB-PF-03272 Comment: None

____________________________________________________________________________

4. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Obtain Shift Manager's permission to perform the test Comment: None Cue: (If asked) the Shift Manager has given permission to stroke test DH 2736

____________________________________________________________________________

5. Performance step: Record test equipment data Standard: Record the M&TE number for the stopwatch and the calibration due date Comment: None Cue: (If asked) A special DB-OP-00016 lineup is NOT required

____________________________________________________________________________

Page 3 of 8

____________________________________________________________________________

6. Performance step: Verity the Equipment Operator is at DH 2736 Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: An Equipment Operator is standing by to verify local valve position

____________________________________________________________________________

7. Performance step: Stoke DH 2736 open and record time

____

Standard: Depress and hold the OPEN pushbutton and stroke time using the stopwatch. Record the stroke time.

Comment: DH 2736 is a throttle valve, which requires the OPEN pushbutton to be depressed while the valve is stroking DH 2736 will stroke faster than the expected time.

____________________________________________________________________________

8. Performance step: Contact the Equipment Operator to check local indication Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is open

____________________________________________________________________________

9. Performance step: Complete the "Position To" column in the Locked Valve Log

____

Standard: Enter "Open" Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

10. Performance step: Complete the "Position By" column in the Locked Valve Log

____

Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

Page 4 of 8

____________________________________________________________________________

11. Performance step: Stoke DH 2736 closed and record time

____

Standard: Depress and hold the CLOSED pushbutton and stroke time using the stopwatch.

Record the stroke time.

Comment: None

____________________________________________________________________________

12. Performance step: Contact the Equipment Operator to check local indication Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is closed

____________________________________________________________________________

13. Performance step: Complete the "Restored By" column in the Locked Valve Log

____

Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

14. Performance step: Recognize the stroke times are not within the expected times Standard: Compare valve stroke times to the expected range of stroke times Comment: None

____________________________________________________________________________

15. Performance step: Restoke DH 2736 and record times

____

Standard: Recognize the test requires the valve to be stroke timed a second time Comment: None Cue: DH 2736 has been stroked open and closed a second time. The stroke times are the same as recorded in step 4.2.2

____________________________________________________________________________

Page 5 of 8

____________________________________________________________________________

16. Performance step: Inform the Unit Supervisor or Shift Manager the stroke times are not with in the expected range

____

Standard: Communicate to a shift SRO the need to write a Condition Report and perform an Operability Justification Comment: None Cue: The Shift Manager will write the Condition Report and document the Operability Justification

____________________________________________________________________________

17. Performance step: Complete acceptance criteria

____

Standard: Sign off steps 5.2 and 5.3 Comment: None

____________________________________________________________________________

Terminating Cue: This JPM is complete Page 6 of 8

VERIFICATION OF COMPLETION Job Performance Measure No. ____SRO C______

Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT Examiner's signature and date: _______________________________ __________

Page 7 of 8

JPM SRO C Simulator Instructions Setup the simulator to any Mode 1, 2, or 3 IC at NOP and NOT.

Page 8 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse ________ _ Task No: _333-008-01-0300_________

Task Title: Review and Approve a Containment Pressure Reduction Release_________________

K/A

Reference:

GEN 2.3.11 2.7/3.2 Job Performance Measure No: _SRO D Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance _____X_____

Classroom ________________ Simulator _______X________ Plant ___________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H2O. Flow transmitter FT5090, Station Vent Flow, is out of service for channel calibration.

Task Standard: Review and approve a pressure release of Containment.

Required Materials: None General

References:

DB-OP-03012, Radioactive Gaseous Batch Release, Offsite Dose Calculation Manual Initiating Cue: Chemistry has completed section 4.15 of DB-OP-03012, Radioactive Gaseous Batch Release and returned the release permit to the Shift Manager. The Shift Manager directs you to perform section 4.5 of DB-OP-03012, Radioactive Gaseous Batch Release.

Time Critical Task: No Validation Time: 24 Minutes Page 1 of 7

Initiating Cues A plant heatup is in progress.

Containment to annulus differential pressure has risen to 20 inches H2O.

Flow transmitter FT5090, Station Vent Flow, is out of service for channel calibration.

Chemistry has completed section 4.15 of DB-OP-03012, Radioactive Gaseous Batch Release and returned the release permit to the Shift Manager.

The Shift Manager directs you to perform section 4.5 of DB-OP-03012, Radioactive Gaseous Batch Release.

Page 2 of 7

PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Verify Chemistry has approved the release Standard: Verify Item 4.h of Attachment 1 is signed and dated Comment: None

____________________________________________________________________________

2. Performance step: Verify the surveillance requirements are current.

Standard: Verify current surveillances by using DB Maintenance Management System or refer to the Unit Log or refer to the report provided by the Work Support Group Comment: If DBMMS or Unit Log is used provide cues. If asked, provide surveillance report.

____________________________________________________________________________

3. Performance step: Verify the surveillance requirements are current.

Standard: Check DB-MI-03413, RMS Channel Calibration for RE 4598AA and RE 4598BA is current Cue: (If asked) DB-MI-03413 for RE4598AA Tech. Spec. late date is 8/26/04. DB-MI-03413 for RE4598BA Tech. Spec. late date is 4/23/05.

____________________________________________________________________________

4. Performance step: Verify the surveillance requirements are current.

Standard: Check DB-MI-03442, Channel Calibration of 32C-ISF 5090, Station Vent Flow, for FT 5090 is current Comment: May not check FT 5090 since OOS in initial conditions Cue: (if asked) DB-MI-03442 for FT 5090 Tech. Spec. late date is 2/20/05.

____________________________________________________________________________

5. Performance step: Verify the surveillance requirements are current.

____

Standard: Recognize DB-MI-03444, Channel Calibration of 32C-ISF 5090A, Station Vent Flow, for FT 5090A is NOT current Comment: May recognize both flow transmitter channels are inoperable.

Cue: (if asked) DB-MI-03444 for FT 5090A Tech. Spec. late date is (yesterdays date).

____________________________________________________________________________

Page 3 of 7

____________________________________________________________________________

6. Performance step: Verify the surveillance requirements are current.

Standard: Check DB-OP-03007, Miscellaneous Instrument Daily Checks is current Comment: Status of DB-OP-03007 is obtained from the Unit Log Cue: (if asked) DB-OP-03007 was completed (todays date)

____________________________________________________________________________

7. Performance step: Verify the surveillance requirements are current.

Standard: Check DB-SC-03216, Quarterly Functional Test of RE 4598AA, Station Vent Normal Range Radiation Monitor is current Comment:

Cue: (if asked) DB-SC-03216 for RE4598AA Tech. Spec. late date is 6/10/04.

___________________________________________________________________________

8. Performance step: Verify the surveillance requirements are current Standard: Verify DB-SC-03218, Quarterly Functional Test of RE 4598BA, Station Vent Normal Range Radiation Monitor is current Comment:

Cue: (if asked) DB-SC-03218 for RE4598BA Tech. Spec. late date is 5/7/04

____________________________________________________________________________

9. Performance step: Verify the surveillance requirements are current Standard: Check DB-SC-03200, Shift Channel Check of the Radiation Monitoring System is current Comment: Status of DB-SC-03200 can be obtained from the Unit Log Cue: (if asked) DB-SC-03200 was completed (todays date)

____________________________________________________________________________

10. Performance step: Verify the surveillance requirements are current Standard: Check DB-CN-03008, Station Vent Releases, Weekly Radiological Monitoring, Sampling and Analysis is current Comment: Status of DB-CN-03008 can be obtained from the Unit Log Cue: (if asked) DB-CN-03008 was completed (yesterdays date)

____________________________________________________________________________

Page 4 of 7

____________________________________________________________________________

11. Performance step: Recognize that both Station Vent flow monitors are inoperable

____

Standard: Circle UNSAT in item 4.i and record Offsite Dose Calculation Manual (ODCM) action statement in item 5.a, Attachment 1 Comment: ODCM action statement for both flow channels inoperable is to estimate flow rate every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Cue: (If asked) Another SRO is making the Operability Tracking Log entries

____________________________________________________________________________

12. Performance step: Request Shift Manager approval for the release Standard: Communication with the Shift Manager Comment:

____________________________________________________________________________

Terminating Cue: This JPM is complete Page 5 of 7

VERIFICATION OF COMPLETION Job Performance Measure No. __SRO D______

Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT Examiner's signature and date: _______________________________ __________

Page 6 of 7

JPM SRO D Simulator Instructions If the simulator is used, setup the simulator in a Mode 3, NOP, NOT IC.

Raise Containment pressure to 20 inches.

Page 7 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse ________ _ Task No: _334-004-05-0300_________

Task Title: Manually Activate the Emergency Response Organization Group Page_____________

K/A

Reference:

GEN 2.4.43 2.8/3.5 Job Performance Measure No: _SRO E Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance ______X________ Actual Performance __________

Classroom ________________ Simulator ______X_________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is in Mode 1. An Alert has been declared due to the loss of both trains of Decay Heat Removal per EAL 3.B.1.

Task Standard: Recognize the Computerized Automatic Notification System (CANS) is not responding. Manually activate the ERO Group Page.

Required Materials: None General

References:

RA-EP-02110, Emergency Notification; Emergency Plan Telephone Directory Initiating Cue: Security is not available to make emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with step 6.2 of RA-EP-001700, Alert.

Time Critical Task: No Validation Time: 8 Minutes Page 1 of 8

Initiating Cues The plant is in Mode 1.

An Alert has been declared due to the loss of both trains of Decay Heat Removal per EAL 3.B.1.

Security is not available to make emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with in accordance with step 6.2 of RA-EP-001700, Alert.

Page 2 of 8

PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Make notifications to the ERO Standard: Refer to RA-EP-02110, Emergency Notifications Comment: None

____________________________________________________________________________

2. Performance step: Obtain a scenario activation password Standard: Obtain the Emergency Directors password, if the examinee does not have his/her own password Comment: Password needed to activate CANS. Password is individuals social security number Cue: (If asked) The password is 123-45-6789

____________________________________________________________________________

3. Performance step: Obtain the Emergency Classification Standard: Recognize the Emergency Classification is an Alert as provided in the Initial Conditions Comment: None

____________________________________________________________________________

4. Performance step: Obtain the CANS access number Standard: Obtain the CANS access number from the Emergency Plan Telephone Directory Comment: CANS number is 9-419-249-2412 OR dial extension 2412 Cue: The CANS number is busy. CANS does not answer.

____________________________________________________________________________

5. Performance step: Contact CANS Standard: Dial the CANS phone number Comment: CANS number will be busy Cue: The CANS number is busy. CANS does not answer.

______________________________________________________________________________

Page 3 of 8

____________________________________________________________________________

6. Performance step: Contact CANS Standard: Dial the CANS phone number a second time Comment: None Cue: The CANS number is busy. CANS does not answer.

______________________________________________________________________________

7. Performance step: Recognize CANS failure

____

Standard: Route to section 6.3 of RA-EP-02110, Emergency Notification Comment: None

____________________________________________________________________________

8. Performance step: Obtain the Emergency Classification

____

Standard: Recognize the Emergency Classification is an Alert as provided in the Initial Conditions Comment: None

____________________________________________________________________________

9. Performance step: Obtain the ERO Numeric group pager number

____

Standard: Obtain the group pager number from the Emergency Plan Telephone Directory Comment: Group pager number is 9-1-800-405-4758 Cue: (If the candidate does not dial 9) The number you have requested can not be completed as dialed. Please check the number and dial again.

____________________________________________________________________________

10. Performance step: Contact the pager system

____

Standard: Dial the pager number Comment: None Cue: Group pager number has been dialed. The pager system asks for the pager number.

____________________________________________________________________________

Page 4 of 8

____________________________________________________________________________

11. Performance step: Enter the pager number

____

Standard: Enter pager number 2533024 Comment: None Cue: Pager number 2533024 has been entered. The pager system asks for the numeric message followed by the # (pound) key

____________________________________________________________________________

12. Performance step: Enter the classification code

____

Standard: Enter 2222 Comment: None Cue: 2222 has been entered

____________________________________________________________________________

13. Performance step: Depress the (#) key

____

Standard: Depress the (#) key Comment: None Cue: The # key has been depressed

____________________________________________________________________________

14. Performance step: Contact the pager system

____

Standard: Dial the pager number a second time Comment: None Cue: Group pager number has been dialed. The pager system asks for the pager number.

____________________________________________________________________________

Page 5 of 8

____________________________________________________________________________

15. Performance step: Enter the pager number

____

Standard: Enter pager number 2533024 a second time Comment: None Cue: Pager number 2533024 has been entered. The pager system asks for the numeric message followed by the # (pound) key

____________________________________________________________________________

16. Performance step: Enter the classification code a second time

____

Standard: Enter 2222 Comment: None Cue: 2222 has been entered

____________________________________________________________________________

17. Performance step: Depress the (#) key a second time

____

Standard: Depress the (#) key Comment: None Cue: The # key has been depressed

____________________________________________________________________________

18. Performance step: Verify the group page functioned properly Standard: Verify the Control Room pager indicates 2222 Comment: None Cue: Five minutes have elapsed. The Control Room pager has gone off twice, indicating 2222.

____________________________________________________________________________

Terminating Cue: This JPM is complete Page 6 of 8

VERIFICATION OF COMPLETION Job Performance Measure No. _SRO E_______

Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT Examiner's signature and date: _______________________________ __________

Page 7 of 8

JPM SRO E Simulator Instructions Setup the simulator to any IC Page 8 of 8