ML093200599: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Attachment 6  OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: SONGS First Exam Date:10/19/2009 Written Exam Outline 3/23/09 Comment Resolution 1 T1G2: 068: Verify this will not overlap the S-1 JPM (Control Room Evac) DONE 2   3 T2G1: 003: Fix K/A Topic wording ("and the") DONE 4 T2G1: 026: Ensure no overlap with CSS JPM DONE 5     Administrative JPM Outline 3/23/09 Comment Resolution 1 Label Admins (RA1 or SA1). There are no critical TASKS. They are STEPS. DONE 2 Ensure each JPM has a clearly defined task standard that must be met. This is not the same as the task description or title. DONE 3 (SRO SA2)Is determining time to boil unique to the SRO. Or is the SRO going to perform the review of the package completed by the RO? Change to a review of the completed procedure. DONE 4   5     Control Room / In-Plant System JPM Outline 3/23/09 Comment Resolution 1 (S-1)Ensure there are sufficient critical steps and there is no overlap with CVCS (S-2). DONE 2 (S-4)Ensure enough critical steps; alternate path is clearly proceduralized. DONE 3   4 (S-8) Verifiy (or make it so) this can be done in actual control room. DONE Attachment 6  OBDI 202 - IOLE Process 5 Ensure each JPM has a clearly defined task standard that must be met. This is
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility:     SONGS                                   First Exam Date:           10/19/2009 Written Exam Outline 3/23/09 Comment                                       Resolution T1G2: 068: Verify this will not overlap     DONE 1
the S-1 JPM (Control Room Evac) 2 T2G1: 003: Fix K/A Topic wording (and DONE 3
the)
T2G1: 026: Ensure no overlap with CSS DONE 4
JPM 5
Administrative JPM Outline 3/23/09 Comment                                       Resolution Label Admins (RA1 or SA1). There are DONE 1
no critical TASKS. They are STEPS.
Ensure each JPM has a clearly defined DONE task standard that must be met. This is 2
not the same as the task description or title.
(SRO SA2)Is determining time to boil         DONE unique to the SRO. Or is the SRO going to perform the review of the package completed by the RO? Change to a review of the completed procedure.
4 5
Control Room / In-Plant System JPM Outline 3/23/09 Comment                                       Resolution (S-1)Ensure there are sufficient critical   DONE 1  steps and there is no overlap with CVCS (S-2).
(S-4)Ensure enough critical steps;           DONE 2
alternate path is clearly proceduralized.
3 (S-8) Verifiy (or make it so) this can be   DONE 4
done in actual control room.                                                       OBDI 202 - IOLE Process


not the same as the task title. DONE  Simulator Scenario Outline Comments 6/10/09 Comment Resolution 1 (1)Tripping RCPs is not a critical task. There is a large break LOCA in progress, and S/G's/Forced Flow cooling will not be used anyway. FIXED 2 (2)With Train 'A' EDG OOS, would the train B CCW pump be in service  
Ensure each JPM has a clearly defined        DONE 5  task standard that must be met. This is not the same as the task title.
 
Simulator Scenario Outline Comments 6/10/09 Comment                                     Resolution (1)Tripping RCPs is not a critical task. FIXED There is a large break LOCA in 1
already? OK as is 3 (3) 2e-3% is about 1e-8 in the intermediate range. NOTE ONLY 4 (3) Event 6. Will 60 gpm be construed as a rupture?
progress, and S/Gs/Forced Flow cooling will not be used anyway.
No. OK as is 5}}
(2)With Train A EDG OOS, would the         OK as is 2  train B CCW pump be in service already?
(3) 2e-3% is about 1e-8 in the               NOTE ONLY 3
intermediate range.
(3) Event 6. Will 60 gpm be construed       No. OK as is 4
as a rupture?
5                                                     OBDI 202 - IOLE Process}}

Latest revision as of 00:25, 14 November 2019

2009-10-Draft Outline Comments
ML093200599
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/16/2009
From:
NRC Region 4
To:
Southern California Edison Co
References
50-361/09-302, 50-362/09-302 50-361/09-302, 50-362/09-302
Download: ML093200599 (2)


Text

DRAFT OUTLINE COMMENTS Facility: SONGS First Exam Date: 10/19/2009 Written Exam Outline 3/23/09 Comment Resolution T1G2: 068: Verify this will not overlap DONE 1

the S-1 JPM (Control Room Evac) 2 T2G1: 003: Fix K/A Topic wording (and DONE 3

the)

T2G1: 026: Ensure no overlap with CSS DONE 4

JPM 5

Administrative JPM Outline 3/23/09 Comment Resolution Label Admins (RA1 or SA1). There are DONE 1

no critical TASKS. They are STEPS.

Ensure each JPM has a clearly defined DONE task standard that must be met. This is 2

not the same as the task description or title.

(SRO SA2)Is determining time to boil DONE unique to the SRO. Or is the SRO going 3 to perform the review of the package completed by the RO? Change to a review of the completed procedure.

4 5

Control Room / In-Plant System JPM Outline 3/23/09 Comment Resolution (S-1)Ensure there are sufficient critical DONE 1 steps and there is no overlap with CVCS (S-2).

(S-4)Ensure enough critical steps; DONE 2

alternate path is clearly proceduralized.

3 (S-8) Verifiy (or make it so) this can be DONE 4

done in actual control room. OBDI 202 - IOLE Process

Ensure each JPM has a clearly defined DONE 5 task standard that must be met. This is not the same as the task title.

Simulator Scenario Outline Comments 6/10/09 Comment Resolution (1)Tripping RCPs is not a critical task. FIXED There is a large break LOCA in 1

progress, and S/Gs/Forced Flow cooling will not be used anyway.

(2)With Train A EDG OOS, would the OK as is 2 train B CCW pump be in service already?

(3) 2e-3% is about 1e-8 in the NOTE ONLY 3

intermediate range.

(3) Event 6. Will 60 gpm be construed No. OK as is 4

as a rupture?

5 OBDI 202 - IOLE Process