{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION III | |||
Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway | 2443 WARRENVILLE ROAD, SUITE 210 | ||
Covert, MI | LISLE, IL 60532-4352 | ||
May 24, 2010 | |||
Mr. Christopher J. Schwarz | |||
Vice President, Operations | |||
Entergy Nuclear Operations, Inc. | |||
Palisades Nuclear Plant | |||
27780 Blue Star Memorial Highway | |||
Covert, MI 49043-9530 | |||
SUBJECT: PALISADES NUCLEAR PLANT - NOTIFICATION TO | |||
PERFORM A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION | |||
WHILE TRANSITION TO 10 CFR PART 50.48(C) IS IN PROGRESS; | |||
INSPECTION REPORT 05000255/2010008(DRS) | |||
Dear Mr. Schwarz: | |||
On August 16, 2010, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire | |||
protection baseline inspection at the Palisades Nuclear Plant. This inspection will be performed | |||
in accordance with Inspection Procedure (IP) 71111.05TTP, the NRCs baseline fire protection | |||
inspection procedure for plants in the process of implementing the National Fire Protection | |||
Association (NFPA) Standard 805 (10 CFR 50.48(c)). The inspection guidance is different from | |||
the regular triennial inspections, in that the inspectors will concentrate on the fire protection | |||
program infrastructure and the adequacy of compensatory measures implemented for identified | |||
departures from code requirements. The inspectors will not routinely inspect for or evaluate | |||
circuit related issues. | |||
Based on the latest revision to IP 71111.05TTP dated December 24, 2009, changes were made | |||
to the IP, which now requires the fire protection inspection to review your actions to mitigate | |||
postulated events that could potentially cause loss of large areas of power reactor facilities due | |||
to explosions or fires. This requirement was implemented by the issuance of the Interim | |||
Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements | |||
of 10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this | |||
inspection, the B.5.b requirements review will begin following the information gathering visit. | |||
The schedule for the on-site inspection activity is as follows: | |||
y Information Gathering Visit: August 3 - 5, 2010; | |||
y B.5.b Requirements: August 5 - 6, 2010; and | |||
y Fire Protection Inspection: August 16 - 20, 2010, and August 30 - September 3, 2010. | |||
C. Schwarz -2- | |||
The purpose of the information gathering visit is: (1) to obtain information and documentation | |||
needed to support the inspection; and (2) to become familiar with the Palisades Nuclear Plants | |||
fire protection programs, fire protection features, post-fire safe shutdown capabilities, plant | |||
layout, mitigating strategies to address Section B.5.b of the Interim Compensatory Measures | |||
Order, EA-02-026, of February 25, 2002, 10 CFR 50.54 (hh)(2); and, as necessary, obtain plant | |||
specific site access training and badging for unescorted site access. | |||
Experience has shown that the baseline fire protection inspections are extremely resource | |||
intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection | |||
impact on the site and to ensure a productive inspection for both organizations, we have | |||
C. Schwarz | enclosed a request for documents needed for the inspection. These documents have been | ||
Order, EA-02-026, of February 25, 2002, 10 CFR 50.54 (hh)(2); and, as necessary, obtain plant | divided into four groups. The first group lists information necessary to aid the inspection team in | ||
specific site access training and badging for unescorted site access. | choosing specific focus areas for the inspection. It is requested that this information be | ||
intensive both for the NRC inspectors and the licensee | provided to the lead inspector via mail or electronically no later than July12, 2010. The second | ||
staff. | group also lists information and areas for discussion necessary to aid the inspection team in | ||
choosing specific fire protection focus areas for the inspection and to ensure that the inspection | |||
group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. | team is adequately prepared for the inspection. It is requested this information be available | ||
during the information gathering visit (August 3 - 5, 2010). | during the information gathering visit (August 3 - 5, 2010). The third group of requested | ||
documents consists of those items that the team will review, or need access to, during the inspection. | documents consists of those items that the team will review, or need access to, during the | ||
this information be provided to the lead inspector as the information is generated during the | inspection. Please have this information available by the first day of the second on-site | ||
inspection. | inspection week (August 16 - 20, 2010). The fourth group lists the information necessary to aid | ||
minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. The lead inspector for this inspection is Mr. Benny Jose. | the inspection team in tracking issues identified as a result of the inspection. It is requested that | ||
questions about the inspection or the material requested, please contact the lead inspector at | this information be provided to the lead inspector as the information is generated during the | ||
inspection. It is important that all of these documents are up to date and complete in order to | |||
minimize the number of additional documents requested during the preparation and/or the on- | |||
site portions of the inspection. | |||
The lead inspector for this inspection is Mr. Benny Jose. We understand that our regulatory | |||
contact for this inspection is Ms. Barbara Dotson of your organization. If there are any | |||
questions about the inspection or the material requested, please contact the lead inspector at | |||
(630) 829-9756 or via e-mail at Benny.Jose@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the | |||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, control number 3150- | |||
0011. | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for | |||
information or an information collection requirement unless the requesting document displays a | |||
currently valid Office of Management and Budget control number. | |||
C. Schwarz -3- | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and | |||
its enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
C. Schwarz | /RA/ | ||
Sincerely, | Robert C. Daley, Chief | ||
Engineering Branch 3 | Engineering Branch 3 | ||
Division of Reactor Safety | |||
Docket No. 50-255 | |||
License No. DPR-20 | |||
Enclosure: Fire Protection Inspection Document Request | |||
cc w/encl: Distribution via ListServ | |||
FIRE PROTECTION INSPECTION DOCUMENT REQUEST | |||
Inspection Report: 05000255/2010008(DRS) | |||
On-site Inspection Dates: August 3 - 6, 2010 (Information Gathering Visit) | |||
August 5 - 6, 2010 (B.5.b Requirements) | |||
FIRE PROTECTION INSPECTION DOCUMENT REQUEST | August 16 - 20, 2010 (Fire Protection Inspection) | ||
August 30 - September 3, 2010 (Fire Protection Inspection) | |||
Inspection Report: | Inspection Procedures: IP 71111.05TTP, Fire Protection-NFPA 805 Transition Period | ||
On-site Inspection Dates: August 3 - 6, 2010 | (Triennial) | ||
IP 71152, "Identification and Resolution of Problems" | |||
Inspectors: Benny Jose, Lead Inspector | |||
Inspection Procedures | (630) 829-9756 | ||
: | Benny.Jose@nrc.gov | ||
Robert Winter Zelig Falevits | |||
(630) 829-9758 (630) 829-9717 | |||
Robert.Winter@nrc.gov Zelig.Falevits@nrc.gov | |||
I. Information Requested Prior To the Information Gathering Visit | |||
The following information is requested by July 12, 2010. If you have any questions | |||
regarding this request, please call the lead inspector as soon as possible. All information | |||
should be sent to Mr. Benny Jose (e-mail address Benny.Jose@nrc.gov). Electronic media | |||
is preferred. The preferred file format is a searchable pdf file on a compact disk (CD). The | |||
CD should be indexed and hyper-linked to facilitate ease of use, if possible. Please provide | |||
four copies of each CD submitted (one for each inspector and for a senior reactor analyst). | |||
1. The reactor plant's Individual Plant Examination for External Events (IPEEE) for fire, | |||
results of any post-IPEEE reviews for fire, and listings of actions taken and/or plant | |||
modifications conducted in response to IPEEE information for fire. Alternatively, | |||
probabilistic risk analyses for fire and associated information, if it exists and is more | |||
recent than the IPEEE. | |||
2. A copy of the current version of the fire protection program (FPP), fire hazards analysis | |||
(FHA), safe shutdown analysis (SSA), updated safety analysis report (USAR), Technical | |||
Specifications and license. | |||
3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which | |||
10 CFR Part 50, Appendix R, Section III G requirements are satisfied under | |||
Section III.G.3), or where both safe shutdown trains can be affected. | |||
4. Plant operating procedures which would be used and describe shutdown for a | |||
postulated fire (for both areas requiring alternative shutdown and areas which do not | |||
require alternative shutdown). Only those procedures with actions specific to shutdown | |||
in the event of a fire need be included. | |||
1 Enclosure | |||
FIRE PROTECTION INSPECTION DOCUMENT REQUEST | |||
5. A copy of the current fire protection system Health Report, if available. | |||
( | 6. A copy of the current plant drawings referred to as Horse Notes, if available. | ||
7. Status of NFPA 805 (10 CFR Part 50.48(c)) implementation. | |||
8. Copy of the B.5.b mitigating strategies. | |||
9. Copy of the procedures for the storage, maintenance, and testing of B.5.b related | |||
equipment. | |||
10. A list of the mitigating strategies for which you have modified the regulatory commitment | |||
since the last performance of this inspection (or the performance of TI 2515/171), if any. | |||
11. Copy of the lesson plans for B.5.b operator training. | |||
II. Information Requested During the Information Gathering Visit (August 3-6, 2010) | |||
The following information is requested to be provided to the inspection team during the | |||
on-site information gathering visit. Except for Item 1, it is requested that the following | |||
information be provided on four sets of CDs (searchable, if possible). In addition, two sets | |||
of hard copy drawings are requested for Items 4.a. through 4.f. | |||
1. One set of hard-copy documents for facility layout drawings, which identify plant fire area | |||
delineation; areas protected by automatic fire suppression and detection; and locations | |||
of fire protection equipment. | |||
2. Licensing Information: | |||
a. The facilitys license, including the fire protection license condition; | |||
b. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs) | |||
applicable to fire protection, (specifically including those SERs referenced by the | |||
plant fire protection license condition) and all licensing correspondence referenced | |||
by the SERs; | |||
c. All licensing correspondence associated with the comparison to Standard Review | |||
Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes; | |||
d. Exemptions from 10 CFR Part 50.48 and 10 CFR Part 50, Appendix R, and | |||
associated licensing correspondence; | |||
e. The FPP and applicable portions of the USAR, as referenced by the fire protection | |||
license condition; | |||
f. For pre-1979 plants (i.e., Appendix R plants), a listing of all 10 CFR Part 50, | |||
Appendix R Sections and paragraphs that are applicable to the plant under | |||
10 CFR 50.48(b)(1); | |||
g. For pre-1979 plants, all licensing correspondence associated with those sections | |||
of 10 CFR Part 50, Appendix R, that are not applicable to the plant under | |||
2 Enclosure | |||
FIRE PROTECTION INSPECTION DOCUMENT REQUEST | |||
10 CFR Part 50.48(b)(1). Specifically, the licensing correspondence associated | |||
with those fire protection features proposed or implemented by the licensee that | |||
have been accepted by the NRC staff as satisfying the provisions of Appendix A to | |||
Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection | |||
SERs issued before February 19, 1981, (10 CFR Part 50.48(b)(1)(i)); or those fire | |||
protection features, which were accepted by the NRC staff in comprehensive fire | |||
protection SERs issued before Appendix A to BTP APCSB 9.5-1 was published in | |||
August 1976 (10 CFR Part 50.48(b)(1)(ii)); | |||
h. For post-1979 plants, all licensing correspondence associated with the comparison | |||
to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing | |||
purposes; and | |||
i. For NFPA 805 transition plants provide: (1) all correspondence to and responses | |||
from the NRC; (2) a list of all areas showing assessment review status; | |||
(3) assessments for all areas that have been completed; and (4) a list of all | |||
identified non-conformances, and their respective compensatory measure(s). | |||
3. Fire Protection Program: | |||
a. If not already provided under Request II.(2)(e) above, FPP documents including | |||
FHA and post-fire SSA; | |||
b. A listing of changes made to the FPP since the last triennial fire protection | |||
inspection; | |||
c. For pre-1979 plants, a listing of the protection methodologies identified under | |||
10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected | |||
fire zones/areas (to be determined during information gathering visit). That is, | |||
please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 feet | |||
separation along with detection and suppression; (Section III.G.2.b), 1-hour rated | |||
fire barriers with detection and suppression; (Section III.G.2.c), or alternative | |||
shutdown capability; (Section III.G.3) is used as a strategy for each selected fire | |||
zone/area; | |||
d. A list of Generic Letter 86-10 evaluations; | |||
e. A list of applicable codes and standards related to the design of plant fire | |||
protection features. The list should include National Fire Protection Association | |||
(NFPA) code versions committed to (i.e., the NFPA codes of record); | |||
f. List of plant deviations from code commitments and associated evaluations. | |||
3 Enclosure | |||
FIRE PROTECTION INSPECTION | |||
DOCUMENT REQUESTS | |||
4. Facility Information: | |||
a. Piping and instrumentation (flow) diagrams showing the components used to | |||
achieve and maintain hot standby and cold shutdown for fires outside the | |||
control room and those components used for those areas requiring | |||
alternative shutdown capability; | |||
b. Plant layout and equipment drawings which identify the physical plant | |||
locations of hot standby and cold shutdown equipment for selected fire | |||
zones/areas (to be determined during information gathering visit); | |||
c. Plant layout drawings which identify the general location of the post-fire | |||
emergency lighting units; | |||
d. One-line schematic drawings of the electrical distribution system for 4160 | |||
Volts alternating current (Vac) down to 480Vac; | |||
e. One-line schematic drawings of the electrical distribution system for 250 Volts | |||
direct current (Vdc) and 125Vdc systems as applicable; | |||
f. Logic diagrams showing the components used to achieve and maintain hot | |||
standby and cold shutdown; and | |||
g. Safe shutdown cable routing database (requested electronically such as on | |||
compact disc, if available. | |||
5. Operations Response for Fire Protection: | |||
a. Pre-fire plans for selected fire zones/areas (to be determined during information | |||
gathering visit); and | |||
b. Plant operating procedures which would be used and describe shutdown for a | |||
postulated fire in selected fire zones/areas (to be determined during information | |||
gathering visit). | |||
6. Corrective Actions: | |||
a. Listing of open and closed fire protection condition reports (i.e., problem | |||
identification forms and their resolution reports) since the date of the last triennial | |||
fire protection inspection; and | |||
b. Listing of fire impairments since the date of the last triennial fire protection | |||
inspection. | |||
7. General Information: | |||
a. A listing of abbreviations and/or designators for plant systems; | |||
4 Enclosure | |||
FIRE PROTECTION INSPECTION | |||
DOCUMENT REQUESTS | |||
b. Organization charts of site personnel down to the level of fire protection staff | |||
personnel; and | |||
c. A phone list for on-site licensee personnel. | |||
8. On-site Discussions: | |||
In addition, during the information gathering visit, it is requested that licensee staff be | |||
available for the following: | |||
a. Informal discussion on plant procedures operators would use in the event of fire | |||
and under what conditions would the plant be shutdown using alternative shutdown | |||
methodology; | |||
b. Informal discussion on the plants safe shutdown cable routing database and the | |||
plant-wide cable routing database, as applicable; and | |||
c. A tour of alternative shutdown and risk significant fire areas. | |||
III. Information Requested to be Available on First Day of the Second On-site Inspection | |||
Week (August 16, 2010) | |||
The following information is requested to be provided on the first day of inspection. It is | |||
requested that this information be provided on four sets of CDs (searchable, if possible). | |||
1. Program Procedures: | |||
a. List of the FPP implementing procedures (e.g., administrative controls, surveillance | |||
testing, fire brigade); | |||
b. List of maintenance and surveillance testing procedures for alternative shutdown | |||
capability and fire barriers, detectors, pumps, and suppression systems; | |||
c. List of maintenance procedures which routinely verify fuse breaker coordination | |||
in accordance with the post-fire safe shutdown coordination analysis; | |||
d. List of procedures and/or instructions that control the configuration of the reactor | |||
plant's FPP, features, and post-fire safe shutdown methodology and system | |||
design; and | |||
e. List of procedures and/or instructions that govern the implementation of plant | |||
modifications, maintenance, and special operations, and their impact on fire | |||
protection. | |||
2. Design and Equipment Information: | |||
a. Coordination calculations and/or justifications that verify fuse/breaker coordination | |||
for selected fire zones/areas (to be determined during information gathering | |||
5 Enclosure | |||
FIRE PROTECTION INSPECTION | |||
DOCUMENT REQUESTS | |||
visit) that are fed off of the same electrical buses as components in the protected | |||
safe shutdown train; | |||
b. Copies of significant fire protection and post-fire safe shutdown related design | |||
change package descriptions (including their associated 10 CFR 50.59 | |||
). | evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown) | ||
evaluations; | |||
c. Gaseous suppression system pre-operational testing, if applicable, for selected fire | |||
zones/areas (to be determined during information gathering visit); | |||
d. Hydraulic calculations and supporting test data which demonstrate operability for | |||
water suppression systems, if applicable, for selected fire zones/areas (to be | |||
determined during information gathering visit); | |||
e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac | |||
electrical systems; | |||
f. Vendor manuals and information for fire protection equipment (such as detection, | |||
suppression systems, fire pumps), applicable to selected fire zones/areas (to be | |||
determined during information gathering visit). It is acceptable to make vendor | |||
manuals available to the inspectors in lieu of providing a copy; and | |||
g. List of all fire protection or Appendix R calculations. | |||
3. Assessment and Corrective Actions: | |||
a. The three most recent fire protection Quality Assurance (QA) audits and/or fire | |||
protection self-assessments; and | |||
b. Corrective action documents (e.g., condition reports, including status of corrective | |||
actions) generated as a result of the three most recent fire protection Quality | |||
Assurance (QA) audits and/or fire protection self-assessments. | |||
4. Any updates to information previously provided. | |||
IV. Information Requested to Be Provided Throughout the Inspection | |||
1. Copies of any corrective action documents generated as a result of the inspection | |||
teams questions or queries during this inspection. | |||
2. Copies of the list of questions submitted by the inspection team members and the | |||
status/resolution of the information requested (provided daily during the inspection to | |||
each inspection team member). | |||
If you have questions regarding the information requested, please contact the lead inspector. | |||
6 Enclosure | |||
C. Schwarz -3- | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and | |||
its enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Robert C. Daley, Chief | |||
Engineering Branch 3 | |||
Division of Reactor Safety | |||
Docket No. 50-255 | |||
License No. DPR-20 | |||
Enclosure: Fire Protection Inspection Document Request | |||
cc w/encl: Distribution via ListServ | |||
DISTRIBUTION: | |||
Susan Bagley | |||
RidsNrrPMPalisades | |||
RidsNrrDorlLpl3-1 Resource | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Steven Orth | |||
Jared Heck | |||
Allan Barker | |||
Carole Ariano | |||
Linda Linn | |||
DRPIII | |||
DRSIII | |||
Patricia Buckley | |||
Tammy Tomczak | |||
Sincerely, /RA/ | |||
Division of Reactor Safety | |||
Docket No. 50-255 License No. DPR-20 Enclosure: Fire Protection Inspection Document Request cc w/encl: Distribution via ListServ DISTRIBUTION: | |||
RidsNrrPMPalisades | |||
RidsNrrDorlLpl3-1 Resource | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Steven Orth | |||
Jared Heck | |||
Allan Barker | |||
Carole Ariano | |||
Linda Linn | |||
DRPIII | |||
DRSIII Patricia Buckley Tammy Tomczak | |||
ROPreports Resource | ROPreports Resource | ||
DOCUMENT NAME: G:\DRS\Work in Progress\Ltr. 05__10 Palisades FPI RFI BXJ.docx | |||
9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy | |||
OFFICE RIII | OFFICE RIII RIII | ||
NAME BJose:ls RDaley | |||
DATE 05/19/10 05/24/10 | |||
OFFICIAL RECORD COPY | |||
}} | }} |
Latest revision as of 17:44, 13 November 2019
ML101450494 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 05/24/2010 |
From: | Robert Daley Engineering Branch 3 |
To: | Schwarz C Entergy Nuclear Operations |
References | |
IR-10-008 | |
Download: ML101450494 (10) | |
See also: IR 05000255/2010008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
May 24, 2010
Mr. Christopher J. Schwarz
Vice President, Operations
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant
27780 Blue Star Memorial Highway
Covert, MI 49043-9530
SUBJECT: PALISADES NUCLEAR PLANT - NOTIFICATION TO
PERFORM A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION
WHILE TRANSITION TO 10 CFR PART 50.48(C) IS IN PROGRESS;
INSPECTION REPORT 05000255/2010008(DRS)
Dear Mr. Schwarz:
On August 16, 2010, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire
protection baseline inspection at the Palisades Nuclear Plant. This inspection will be performed
in accordance with Inspection Procedure (IP) 71111.05TTP, the NRCs baseline fire protection
inspection procedure for plants in the process of implementing the National Fire Protection
Association (NFPA) Standard 805 (10 CFR 50.48(c)). The inspection guidance is different from
the regular triennial inspections, in that the inspectors will concentrate on the fire protection
program infrastructure and the adequacy of compensatory measures implemented for identified
departures from code requirements. The inspectors will not routinely inspect for or evaluate
circuit related issues.
Based on the latest revision to IP 71111.05TTP dated December 24, 2009, changes were made
to the IP, which now requires the fire protection inspection to review your actions to mitigate
postulated events that could potentially cause loss of large areas of power reactor facilities due
to explosions or fires. This requirement was implemented by the issuance of the Interim
Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements
of 10 CFR 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this
inspection, the B.5.b requirements review will begin following the information gathering visit.
The schedule for the on-site inspection activity is as follows:
y Information Gathering Visit: August 3 - 5, 2010;
y B.5.b Requirements: August 5 - 6, 2010; and
y Fire Protection Inspection: August 16 - 20, 2010, and August 30 - September 3, 2010.
C. Schwarz -2-
The purpose of the information gathering visit is: (1) to obtain information and documentation
needed to support the inspection; and (2) to become familiar with the Palisades Nuclear Plants
fire protection programs, fire protection features, post-fire safe shutdown capabilities, plant
layout, mitigating strategies to address Section B.5.b of the Interim Compensatory Measures
Order, EA-02-026, of February 25, 2002, 10 CFR 50.54 (hh)(2); and, as necessary, obtain plant
specific site access training and badging for unescorted site access.
Experience has shown that the baseline fire protection inspections are extremely resource
intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection
impact on the site and to ensure a productive inspection for both organizations, we have
enclosed a request for documents needed for the inspection. These documents have been
divided into four groups. The first group lists information necessary to aid the inspection team in
choosing specific focus areas for the inspection. It is requested that this information be
provided to the lead inspector via mail or electronically no later than July12, 2010. The second
group also lists information and areas for discussion necessary to aid the inspection team in
choosing specific fire protection focus areas for the inspection and to ensure that the inspection
team is adequately prepared for the inspection. It is requested this information be available
during the information gathering visit (August 3 - 5, 2010). The third group of requested
documents consists of those items that the team will review, or need access to, during the
inspection. Please have this information available by the first day of the second on-site
inspection week (August 16 - 20, 2010). The fourth group lists the information necessary to aid
the inspection team in tracking issues identified as a result of the inspection. It is requested that
this information be provided to the lead inspector as the information is generated during the
inspection. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the on-
site portions of the inspection.
The lead inspector for this inspection is Mr. Benny Jose. We understand that our regulatory
contact for this inspection is Ms. Barbara Dotson of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9756 or via e-mail at Benny.Jose@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a
currently valid Office of Management and Budget control number.
C. Schwarz -3-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket No. 50-255
License No. DPR-20
Enclosure: Fire Protection Inspection Document Request
cc w/encl: Distribution via ListServ
FIRE PROTECTION INSPECTION DOCUMENT REQUEST
Inspection Report: 05000255/2010008(DRS)
On-site Inspection Dates: August 3 - 6, 2010 (Information Gathering Visit)
August 5 - 6, 2010 (B.5.b Requirements)
August 16 - 20, 2010 (Fire Protection Inspection)
August 30 - September 3, 2010 (Fire Protection Inspection)
Inspection Procedures: IP 71111.05TTP, Fire Protection-NFPA 805 Transition Period
(Triennial)
IP 71152, "Identification and Resolution of Problems"
Inspectors: Benny Jose, Lead Inspector
(630) 829-9756
Benny.Jose@nrc.gov
Robert Winter Zelig Falevits
(630) 829-9758 (630) 829-9717
Robert.Winter@nrc.gov Zelig.Falevits@nrc.gov
I. Information Requested Prior To the Information Gathering Visit
The following information is requested by July 12, 2010. If you have any questions
regarding this request, please call the lead inspector as soon as possible. All information
should be sent to Mr. Benny Jose (e-mail address Benny.Jose@nrc.gov). Electronic media
is preferred. The preferred file format is a searchable pdf file on a compact disk (CD). The
CD should be indexed and hyper-linked to facilitate ease of use, if possible. Please provide
four copies of each CD submitted (one for each inspector and for a senior reactor analyst).
1. The reactor plant's Individual Plant Examination for External Events (IPEEE) for fire,
results of any post-IPEEE reviews for fire, and listings of actions taken and/or plant
modifications conducted in response to IPEEE information for fire. Alternatively,
probabilistic risk analyses for fire and associated information, if it exists and is more
recent than the IPEEE.
2. A copy of the current version of the fire protection program (FPP), fire hazards analysis
(FHA), safe shutdown analysis (SSA), updated safety analysis report (USAR), Technical
Specifications and license.
3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which
10 CFR Part 50, Appendix R, Section III G requirements are satisfied under
Section III.G.3), or where both safe shutdown trains can be affected.
4. Plant operating procedures which would be used and describe shutdown for a
postulated fire (for both areas requiring alternative shutdown and areas which do not
require alternative shutdown). Only those procedures with actions specific to shutdown
in the event of a fire need be included.
1 Enclosure
FIRE PROTECTION INSPECTION DOCUMENT REQUEST
5. A copy of the current fire protection system Health Report, if available.
6. A copy of the current plant drawings referred to as Horse Notes, if available.
7. Status of NFPA 805 (10 CFR Part 50.48(c)) implementation.
8. Copy of the B.5.b mitigating strategies.
9. Copy of the procedures for the storage, maintenance, and testing of B.5.b related
equipment.
10. A list of the mitigating strategies for which you have modified the regulatory commitment
since the last performance of this inspection (or the performance of TI 2515/171), if any.
11. Copy of the lesson plans for B.5.b operator training.
II. Information Requested During the Information Gathering Visit (August 3-6, 2010)
The following information is requested to be provided to the inspection team during the
on-site information gathering visit. Except for Item 1, it is requested that the following
information be provided on four sets of CDs (searchable, if possible). In addition, two sets
of hard copy drawings are requested for Items 4.a. through 4.f.
1. One set of hard-copy documents for facility layout drawings, which identify plant fire area
delineation; areas protected by automatic fire suppression and detection; and locations
of fire protection equipment.
2. Licensing Information:
a. The facilitys license, including the fire protection license condition;
b. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)
applicable to fire protection, (specifically including those SERs referenced by the
plant fire protection license condition) and all licensing correspondence referenced
by the SERs;
c. All licensing correspondence associated with the comparison to Standard Review
Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;
d. Exemptions from 10 CFR Part 50.48 and 10 CFR Part 50, Appendix R, and
associated licensing correspondence;
e. The FPP and applicable portions of the USAR, as referenced by the fire protection
license condition;
f. For pre-1979 plants (i.e., Appendix R plants), a listing of all 10 CFR Part 50,
Appendix R Sections and paragraphs that are applicable to the plant under
g. For pre-1979 plants, all licensing correspondence associated with those sections
of 10 CFR Part 50, Appendix R, that are not applicable to the plant under
2 Enclosure
FIRE PROTECTION INSPECTION DOCUMENT REQUEST
10 CFR Part 50.48(b)(1). Specifically, the licensing correspondence associated
with those fire protection features proposed or implemented by the licensee that
have been accepted by the NRC staff as satisfying the provisions of Appendix A to
Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection
SERs issued before February 19, 1981, (10 CFR Part 50.48(b)(1)(i)); or those fire
protection features, which were accepted by the NRC staff in comprehensive fire
protection SERs issued before Appendix A to BTP APCSB 9.5-1 was published in
August 1976 (10 CFR Part 50.48(b)(1)(ii));
h. For post-1979 plants, all licensing correspondence associated with the comparison
to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing
purposes; and
i. For NFPA 805 transition plants provide: (1) all correspondence to and responses
from the NRC; (2) a list of all areas showing assessment review status;
(3) assessments for all areas that have been completed; and (4) a list of all
identified non-conformances, and their respective compensatory measure(s).
3. Fire Protection Program:
a. If not already provided under Request II.(2)(e) above, FPP documents including
b. A listing of changes made to the FPP since the last triennial fire protection
inspection;
c. For pre-1979 plants, a listing of the protection methodologies identified under
10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected
fire zones/areas (to be determined during information gathering visit). That is,
please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 feet
separation along with detection and suppression; (Section III.G.2.b), 1-hour rated
fire barriers with detection and suppression; (Section III.G.2.c), or alternative
shutdown capability; (Section III.G.3) is used as a strategy for each selected fire
zone/area;
d. A list of Generic Letter 86-10 evaluations;
e. A list of applicable codes and standards related to the design of plant fire
protection features. The list should include National Fire Protection Association
(NFPA) code versions committed to (i.e., the NFPA codes of record);
f. List of plant deviations from code commitments and associated evaluations.
3 Enclosure
FIRE PROTECTION INSPECTION
DOCUMENT REQUESTS
4. Facility Information:
a. Piping and instrumentation (flow) diagrams showing the components used to
achieve and maintain hot standby and cold shutdown for fires outside the
control room and those components used for those areas requiring
alternative shutdown capability;
b. Plant layout and equipment drawings which identify the physical plant
locations of hot standby and cold shutdown equipment for selected fire
zones/areas (to be determined during information gathering visit);
c. Plant layout drawings which identify the general location of the post-fire
emergency lighting units;
d. One-line schematic drawings of the electrical distribution system for 4160
Volts alternating current (Vac) down to 480Vac;
e. One-line schematic drawings of the electrical distribution system for 250 Volts
direct current (Vdc) and 125Vdc systems as applicable;
f. Logic diagrams showing the components used to achieve and maintain hot
standby and cold shutdown; and
g. Safe shutdown cable routing database (requested electronically such as on
compact disc, if available.
5. Operations Response for Fire Protection:
a. Pre-fire plans for selected fire zones/areas (to be determined during information
gathering visit); and
b. Plant operating procedures which would be used and describe shutdown for a
postulated fire in selected fire zones/areas (to be determined during information
gathering visit).
6. Corrective Actions:
a. Listing of open and closed fire protection condition reports (i.e., problem
identification forms and their resolution reports) since the date of the last triennial
fire protection inspection; and
b. Listing of fire impairments since the date of the last triennial fire protection
inspection.
7. General Information:
a. A listing of abbreviations and/or designators for plant systems;
4 Enclosure
FIRE PROTECTION INSPECTION
DOCUMENT REQUESTS
b. Organization charts of site personnel down to the level of fire protection staff
personnel; and
c. A phone list for on-site licensee personnel.
8. On-site Discussions:
In addition, during the information gathering visit, it is requested that licensee staff be
available for the following:
a. Informal discussion on plant procedures operators would use in the event of fire
and under what conditions would the plant be shutdown using alternative shutdown
methodology;
b. Informal discussion on the plants safe shutdown cable routing database and the
plant-wide cable routing database, as applicable; and
c. A tour of alternative shutdown and risk significant fire areas.
III. Information Requested to be Available on First Day of the Second On-site Inspection
Week (August 16, 2010)
The following information is requested to be provided on the first day of inspection. It is
requested that this information be provided on four sets of CDs (searchable, if possible).
1. Program Procedures:
a. List of the FPP implementing procedures (e.g., administrative controls, surveillance
testing, fire brigade);
b. List of maintenance and surveillance testing procedures for alternative shutdown
capability and fire barriers, detectors, pumps, and suppression systems;
c. List of maintenance procedures which routinely verify fuse breaker coordination
in accordance with the post-fire safe shutdown coordination analysis;
d. List of procedures and/or instructions that control the configuration of the reactor
plant's FPP, features, and post-fire safe shutdown methodology and system
design; and
e. List of procedures and/or instructions that govern the implementation of plant
modifications, maintenance, and special operations, and their impact on fire
protection.
2. Design and Equipment Information:
a. Coordination calculations and/or justifications that verify fuse/breaker coordination
for selected fire zones/areas (to be determined during information gathering
5 Enclosure
FIRE PROTECTION INSPECTION
DOCUMENT REQUESTS
visit) that are fed off of the same electrical buses as components in the protected
safe shutdown train;
b. Copies of significant fire protection and post-fire safe shutdown related design
change package descriptions (including their associated 10 CFR 50.59
evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown)
evaluations;
c. Gaseous suppression system pre-operational testing, if applicable, for selected fire
zones/areas (to be determined during information gathering visit);
d. Hydraulic calculations and supporting test data which demonstrate operability for
water suppression systems, if applicable, for selected fire zones/areas (to be
determined during information gathering visit);
e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac
electrical systems;
f. Vendor manuals and information for fire protection equipment (such as detection,
suppression systems, fire pumps), applicable to selected fire zones/areas (to be
determined during information gathering visit). It is acceptable to make vendor
manuals available to the inspectors in lieu of providing a copy; and
g. List of all fire protection or Appendix R calculations.
3. Assessment and Corrective Actions:
a. The three most recent fire protection Quality Assurance (QA) audits and/or fire
protection self-assessments; and
b. Corrective action documents (e.g., condition reports, including status of corrective
actions) generated as a result of the three most recent fire protection Quality
Assurance (QA) audits and/or fire protection self-assessments.
4. Any updates to information previously provided.
IV. Information Requested to Be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the inspection
teams questions or queries during this inspection.
2. Copies of the list of questions submitted by the inspection team members and the
status/resolution of the information requested (provided daily during the inspection to
each inspection team member).
If you have questions regarding the information requested, please contact the lead inspector.
6 Enclosure
C. Schwarz -3-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket No. 50-255
License No. DPR-20
Enclosure: Fire Protection Inspection Document Request
cc w/encl: Distribution via ListServ
DISTRIBUTION:
Susan Bagley
RidsNrrPMPalisades
RidsNrrDorlLpl3-1 Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
Patricia Buckley
ROPreports Resource
DOCUMENT NAME: G:\DRS\Work in Progress\Ltr. 05__10 Palisades FPI RFI BXJ.docx
9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy
OFFICE RIII RIII
NAME BJose:ls RDaley
DATE 05/19/10 05/24/10
OFFICIAL RECORD COPY