{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Manual Transfer of Distribution Panel Loads (NSPS Solenoid
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Manual Transfer of Distribution Panel Loads (NSPS Solenoid / RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 02 Date: 02/18/2011 Developed By:   T Pickley                       02/18/2011 Instructor                       Date Validated By:
/ RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 0 2 Date: 0 2/18/201 1 Developed By:
SME or Instructor               Date Reviewed By:
T Pickley 0 2/1 8/201 1  Instructor Date Validated By:
Operations Representative       Date Approved By:
SME or Instructor Date Reviewed By:
Training Department             Date
Operations Representative Date Approved By:
 
Training Department Date JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
: 1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in
: 3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
Line 33: Line 32:
: 7. Critical steps meet the criteria for critical steps and are identified with asterisk an (*)
: 7. Critical steps meet the criteria for critical steps and are identified with asterisk an (*)
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev: Procedure Rev:   Procedure Rev:   9. Verify cues both verbal and visual are free of conflict. 10. Verify performance time is accurate
Procedure                           Rev:
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                           Rev:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
Procedure                           Rev:
Page 3 of 11 Revision Record (Summary)
: 9. Verify cues both verbal and visual are free of conflict.
Revision Date Description 00 06/11/07 New JPM. 01 08/31/10 Updated Format. Updated Procedure Revision Number.
: 10. Verify performance time is accurate
02 02/18/11 Updated Procedure Revision Number and K/A.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Page 4 of 11 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfie
SME / Instructor                                   Date SME / Instructor                                   Date SME / Instructor                                   Date Page 2 of 11
: d. No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
 
TASK STANDARDS
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
Manually Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter IAW CPS 3509.01, Rev 02 0 b, INSTRUMENT POWER SYSTEM (IP).
Revision Record (Summary)
Revision   Date                           Description 00     06/11/07 New JPM.
01     08/31/10 Updated Format. Updated Procedure Revision Number.
02     02/18/11 Updated Procedure Revision Number and K/A.
Page 3 of 11
 
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS:
* Manually Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter IAW CPS 3509.01, Rev 020b, INSTRUMENT POWER SYSTEM (IP).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
 
* CPS 3509.01, Rev 020b, INSTRUMENT POWER SYSTEM (IP)
CPS 3509.01, Rev 020 b, INSTRUMENT POWER SYSTEM (IP)
EVALUATOR INSTRUCTIONS:
EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
Provide examinee the procedure.
* Provide examinee the procedure.
Do NOT allow examinee to shine any type light into a panel.
* Do NOT allow examinee to shine any type light into a panel.
All pre-job briefings are completed.
* All pre-job briefings are completed.
Page 4 of 11


JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 11  INITIAL CONDITIONS:
INITIAL CONDITIONS:
Plant is in Mode 1.
* Plant is in Mode 1.
RPS Solenoid Inverter "A" has just been restored from a short maintenance period.
* RPS Solenoid Inverter A has just been restored from a short maintenance period.
The RPS Solenoid Inverter "A" has been energized per Section 8.3.6 steps 1 and 2.
* The RPS Solenoid Inverter A has been energized per Section 8.3.6 steps 1 and 2.
It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.
It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.
MSIV solenoid currents have been verified normal (solenoids are reset). The A and B solenoids for each Control Rod have been verified energized.
* MSIV solenoid currents have been verified normal (solenoids are reset).
* The A and B solenoids for each Control Rod have been verified energized.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
Do NOT shine any type light into a panel.
You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus "A" FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.
You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus A FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.
START TIME:
START TIME:
Page 5 of 11


JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 11 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CAUTION When the Inverter Transfer Switch is moved from the BYPASS position, it moves from the BYPASS position to the OFF position before moving to the INVERTER position. This will initiate a HALF SCRAM if the other bus is energized or a FULL SCRAM if the other bus i s deenergized. This could cause a single rod scram if the other solenoid is deenergized. Also, 120 VAC Output Bkr, CB
PERFORMANCE STEPS CAUTION When the Inverter Transfer Switch is moved from the BYPASS position, it moves from the BYPASS position to the OFF position before moving to the INVERTER position. This will initiate a HALF SCRAM if the other bus is energized or a FULL SCRAM if the other bus is deenergized. This could cause a single rod scram if the other solenoid is deenergized. Also, 120 VAC Output Bkr, CB-3 will trip OFF due to the Power Monitor.
-3 will trip OFF due to the Power Monitor.
CPS No. 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1 Verify LOSS OF SYNC lamp not illuminated.
CPS No. 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loa ds (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1 Verify LOSS OF SYNC lamp not illuminated.
Standard:           At RPS Solenoid Inverter A verifies the loss of sync lamp is not illuminated.
Standard: At RPS Solenoid Inverter "A" verifies the loss of sync lamp is not illuminated.
Cue:               1. Loss of sync lamp is not illuminated - (NOTE: Ensure operator is at RPS Solenoid Inverter A.)
Cue: 1. Loss of sync lamp is not illuminated  
Comments SAT               UNSAT                   Comment Number Page 6 of 11
- (NOTE: Ensure operator is at RPS Solenoid Inverter "A".)
Comments   SAT   UNSAT   Comment Number


JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM) 8.3.4.2 IF       MSIVs are open, THEN Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13-P661 and P662. <<CM-5>>
Page 7 of 11  8.3.4.2 IF           MSIVs are open, THEN   Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13-P661 and P662.  
Standard:       Verifies MSIV Solenoids are reset.
<<CM-5>> Standard: Verifies MSIV Solenoids are reset.
Cue:           1. Stated in the initial conditions all solenoids were reset.
Cue: 1. Stated in the initial conditions all solenoids were reset.
Comments SAT               UNSAT                   Comment Number 8.3.4.3 (Modes 1 and 2 only)
Comments   SAT   UNSAT   Comment Number 8.3.4.3 (Modes 1 and 2 only)
Check A and B solenoids for each control rod to ensure they are energized prior to transferring sources (provided adequate time is available for the check).
Check A and B solenoids for each control rod to ensure they are energized prior t o transferring sources (provided adequate time is available for the check).
Temperature should be greater than ambient.
Temperature should be greater than ambient.
Standard: Ensures all control rods A and B solenoids are energized.
Standard:       Ensures all control rods A and B solenoids are energized.
Cue: 1. Stated in the initial conditions all solenoids were energized. Comments   SAT   UNSAT   Comment Number
Cue:           1. Stated in the initial conditions all solenoids were energized.
Comments SAT                UNSAT                  Comment Number Page 7 of 11
 
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
      *8.3.4.4 Place TRANSFER SWITCH to INVERTER.
Standard:      At RPS Solenoid Inverter A, places Transfer Switch To Inverter Position.
Cue:            1. Transfer switch is in the Inverter Position.
Comments        As Found Position: BYPASS SAT              UNSAT                  Comment Number 8.3.4.5 Push and then release:
Power Monitor RESET push-button.
Standard:      At RPS Solenoid Inverter A, pushes then releases Power Monitor Reset push button.
Cue:            1. Power Monitor Reset pushbutton has been depressed then released.
Comments SAT              UNSAT                  Comment Number 8.3.4.6 Verify power monitor alarms are out.
Standard:      At RPS Solenoid Inverter A power monitor, verifies alarms are out.
Cue:            1. Power Monitor alarms are out.
Comments SAT             UNSAT                 Comment Number Page 8 of 11


JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 11 *8.3.4.4 Place TRANSFER SWITCH to INVERTER.
        *8.3.4.7 Place 120 VAC OUTPUT BKR, CB-3 to ON.
Standard: At RPS Solenoid Inverter "A", places Transfer Switch To Inverter Position.
Standard:       At RPS Solenoid Inverter A, places 120 vac Output Bkr, CB-3, to ON.
Cue: 1. Transfer switch is in the Inverter Position.
Cue:             1. 120 VAC Output Bkr, CB-3 is in the ON position.
Comments As Found Position: BYPASS SAT  UNSAT    Comment Number 8.3.4.5 Push and then release:
Comments         As Found Position: OFF SAT               UNSAT                 Comment Number 8.3.4.8 IF         Mngt or NSED recommends, THEN At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr:
Power Monitor RESET push
-button. Standard: At RPS Solenoid Inverter "A", pushes then releases Power Monitor Reset push button. Cue: 1. Power Monitor Reset pushbutton has been depressed then released. Comments  SAT  UNSAT    Comment Number 8.3.4.6 Verify power monitor alarms are out.
Standard: At RPS Solenoid Inverter "A" power monitor, verifies alarms are out.
Cue: 1. Power Monitor alarms are out.
Comments  SAT  UNSAT    Comment Number JPM Number:  JPM 026  Clinton Power Station Job Performance Measure (JPM)
Page 9 of 11 *8.3.4.7 Place 120 VAC OUTPUT BKR, CB
-3 to ON. Standard: At RPS Solenoid Inverter "A", places 120 vac Output Bkr, CB
-3, to ON. Cue: 1. 120 VAC Output Bkr, CB
-3 is in the ON position.
Comments As Found Position: OFF SAT   UNSAT   Comment Number 8.3.4.8 IF           Mngt or NSED recommends, THEN   At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr:
Place AC INPUT (POWER) Bkr to OFF (down).
Place AC INPUT (POWER) Bkr to OFF (down).
5006-3L(4L) will be in alarm when bkr is OFF.
5006-3L(4L) will be in alarm when bkr is OFF.
Standard: Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.
Standard:       Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.
Cue: 1. If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby.
Cue:             1. If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby. DO NOT turn the AC Input Bkr to OFF.
DO NOT turn the AC Input Bkr to OFF. Comments   SAT   UNSAT   Comment Number TERMINATING CUES:
Comments SAT               UNSAT                 Comment Number TERMINATING CUES:
CPS 3509.01, Instrument Power (IP), Step 8.3.4 complete. STOP TIME:
CPS 3509.01, Instrument Power (IP), Step 8.3.4 complete.
STOP TIME:
Page 9 of 11


JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operators Name:
Page 10 of 11 Operator's Name:
Job Title:       EO                RO                 SRO             STA           SRO Cert JPM Title:       Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER JPM Number:     JPM026                                                       Revision Number: 02 Task Number and Title: 350901.23, Manual Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter K/A System         K/A Number                     Importance (RO/SRO) 262002               2.1.30                     4.4                 4.0 Suggested Testing Environment:                 Plant Actual Testing Environment:                 Simulator             Plant           Control Room Testing Method:         Simulate                               Faulted:     Yes       No Perform                     Alternate Path:       Yes       No Time Critical:         Yes           No Estimated Time to Complete: 15 minutes                             Actual Time Used:             minutes
Job Title:
E O  RO   SRO   STA   SRO Cert JPM Title:
Manual Transfer of Distribution Panel Loads (NSPS Solenoid
/RPS) from ALTERNATE POWER to INVERTER JPM Number:
JPM026 Revision Number:
0 2 Task Number and Title:
350901.23, Manual Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter K/A System K/A Number Importance (RO/SRO) 262002 2.1.30 4.4 4.0 Suggested Testing Environment:
Plant Actual Testing Environment:
Simulator   Plant   Control Room Testing Method:
Simulate Faulted:   Yes   No     Perform Alternate Path:
Yes   No Time Critical:
Yes   No Estimated Time to Complete:
15 minutes Actual Time Used:
minutes  


==References:==
==References:==
 
CPS 3509.01, Rev 020b, INSTRUMENT POWER SYSTEM (IP)
CPS 3509.01, Rev 020 b, INSTRUMENT POWER SYSTEM (IP)
EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                 Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             Satisfactory              Unsatisfactory Comments:
Yes   No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name:                                                             (Print)
Satisfactor y  Unsatisfactory Comments:
Evaluators Signature:                                                              Date:
Evaluator's Name:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
(Print)   Evaluator's Signature:
Page 10 of 11
Date:
 
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 11 of 11 INITIAL CONDITIONS:
INITIAL CONDITIONS:
Plant is in Mode 1.
* Plant is in Mode 1.
RPS Solenoid Inverter "A" has just been restored from a short maintenance period.
* RPS Solenoid Inverter A has just been restored from a short maintenance period.
The RPS Solenoid Inverter "A" has been energized per Section 8.3.6 steps 1 and 2.
* The RPS Solenoid Inverter A has been energized per Section 8.3.6 steps 1 and 2.
It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.
It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.
MSIV solenoid currents have been verified normal (solenoids are reset).
* MSIV solenoid currents have been verified normal (solenoids are reset).
The A and B solenoids for each Control Rod have been verified energized.
* The A and B solenoids for each Control Rod have been verified energized.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
Do NOT shine any type light into a panel.
You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus "A" FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.
You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus A FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.
Page 11 of 11


SRRS: 3D.105 (when utilized for operator initial or continuing training)
CLINTON POWER STATION Job Performance Measure RSP - Div 1 LPCI Operation JPM Number: JPM454 Revision Number: 00 Date: 07/26/2011 Developed By:       W. Kiser                                       07/26/2011 Instructor                                     Date Validated By:
CLINTON POWER STATION Job Performance Measure RSP - Div 1 LPCI Operation JPM Number: JPM454 Revision Number: 00 Date: 07/26/2011 Developed By:
SME or Instructor                             Date Reviewed By:
W. Kiser 07/26/2011 Instructor Date Validated By:
Operations Representative                     Date Approved By:
SME or Instructor Date Reviewed By
Training Department                           Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
:      Operations Representative Date Approved By:
 
Training Department Date JPM Number:  JPM454  Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified.
________     4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________     6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict. ________ 10. Verify performance time is accurate
(*).
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date JPM Number:  JPM454  Clinton Power Station Job Performance Measure (JPM)
Procedure                                 Rev:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Procedure                                 Rev:
Page 3 of 11 Revision Record (Summary)
Procedure                                 Rev:
Revision Date Description 00 07/26/2011 New JPM.
________     9. Verify cues both verbal and visual are free of conflict.
JPM Number:  JPM454  Clinton Power Station Job Performance Measure (JPM)
________     10. Verify performance time is accurate
SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Page 4 of 11 Simulator Setup Instructions
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                 Date SME / Instructor                                 Date SME / Instructor                                 Date SRRS: 3D.105 (when utilized for operator initial or continuing training)                         Page 2 of 11
 
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision           Date                                               Description 00         07/26/2011         New JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                     Page 3 of 11
 
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
: 1. Initialize to any suitable IC with the following:
: 1. Initialize to any suitable IC with the following:
Reactor Scram
* Reactor Scram.
. RPV depressurized.
* RPV depressurized.
: 2. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: 2. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: 3. This completes the setup for this JPM.
: 3. This completes the setup for this JPM.
: 4. Save to a different IC if JPM is being used more than once.
: 4. Save to a different IC if JPM is being used more than once.
: 5. Freeze Simulator.
: 5. Freeze Simulator.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                  Page 4 of 11


JPM Number: JPM454   Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
Page 5 of 11 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performanc e Measure will be satisfied.
TASK STANDARDS:
TASK STANDARDS
* Div 1 LPCI is injecting to the RPV.
Div 1 LPCI is injecting to the RPV.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS No. 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation EVALUATOR INSTRUCTIONS:
* JPM may be simulated or performed at the Simulator Remote Shutdown Panel (RSP).
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                        Page 5 of 11


CPS No. 4003.01C006, Rev 0 RSP
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
- Div 1 LPCI Operation EVALUATOR INSTRUCTIONS:
INITIAL CONDITIONS:
JPM may be simulated or performed at the Simulator Remote Shutdown Panel (RSP).
Amplifying cues are provided within the JPM steps.
All pre-job briefings are completed.
 
JPM Number: JPM454   Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 11  INITIAL CONDITIONS:
A plant transient has occurred.
A plant transient has occurred.
You are the Extra RO. The plant is Shutdown and depressurized. INITIATING CUE:
You are the Extra RO. The plant is Shutdown and depressurized.
CAUTION All pre-job briefings are completed.
INITIATING CUE:
Inject to the RPV using CPS 4003.01C006, Rev 0 RSP  
CAUTION All pre-job briefings are completed.
- Div 1 LPCI Operation Section 3.0, DIV 1 LPCI STARTUP.
Inject to the RPV using CPS 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation Section 3.0, DIV 1 LPCI STARTUP.
MAXIMIZE flowrate.
MAXIMIZE flowrate.
Report to the CRS when Div 1 LPCI is injecting to the RPV at the maximum flowrate.
Report to the CRS when Div 1 LPCI is injecting to the RPV at the maximum flowrate.
START TIME:
START TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)              Page 6 of 11


JPM Number: JPM454   Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 7 of 11 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation 3.1   Verify 1E12-F004A, RHR A Suppression Pool Suction Valve handswitch is in OPEN.
PERFORMANCE STEPS CPS 4003.01C006, Rev 0 RSP  
Standard:           1E12-F004A handswitch verified in OPEN.
- Div 1 LPCI Operation 3.1 Verify 1E12
Cue:
-F004A, RHR A Suppression Pool Suction Valve handswitch is i n OPEN. Standard: 1E12-F004A handswitch verified in OPEN.
Comments SAT                   UNSAT                     Comment Number
Cue: Comments   SAT   UNSAT   Comment Number
              *3.2   Verify/place following transfer switches to EMERG:
  *3.2 Verify/place following transfer switches to EMERG:
a)       C61-S6           d) C61-S9 b)       C61-S7           e) C61-S12 c)       C61-S8           f) C61-HS502 Standard:           Transfer switches C61-S6, C61-S7, C61-S8, C61-S9, C61-S12 and C61-HS502 placed to EMERG.
a) C61-S6 d) C61-S9 b) C61-S7 e) C61-S12 c) C61-S8 f) C61-HS502 Standard: Transfer switches C61
Cue:
-S6, C61-S7, C61-S8, C61-S9, C61-S12 and C61
Comments SAT                   UNSAT                     Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training)                          Page 7 of 11
-HS502 placed to EMERG.
Cue: Comments   SAT   UNSAT   Comment Number


JPM Number: JPM454   Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
            *3.3   Open 1E12-F064A, RHR Pump A Min Flow Recirc Valve.
Page 8 of 11  *3.3 Open 1E12-F064A, RHR Pump A Min Flow Recirc Valve.
Standard:           1E12-F064A handswitch to OPEN then spring release. Red light LIT and Green light NOT LIT.
Standard: 1E12-F064A handswitch to OPEN then spring release. Red light LIT and Green light NOT LIT.
Cue:
Cue: Comments   SAT   UNSAT   Comment Number
Comments SAT                     UNSAT                     Comment Number
  *3.4 Start RHR Pump A, 1E12
            *3.4   Start RHR Pump A, 1E12-C002A.
-C002A. Standard: 1E12-C002A handswitch to START then spring release. Red light LIT and Green light NOT LIT.
Standard:           1E12-C002A handswitch to START then spring release. Red light LIT and Green light NOT LIT.
Cue: Comments   SAT   UNSAT   Comment Number 3.5 Verify RHR Pump 1A Room Sply Fan, 1VY02C starts.
Cue:
Standard: Verifies 1VY02C Red light LIT and Green light NOT LIT.
Comments SAT                     UNSAT                     Comment Number 3.5   Verify RHR Pump 1A Room Sply Fan, 1VY02C starts.
Cue: Comments   SAT   UNSAT   Comment Number
Standard:           Verifies 1VY02C Red light LIT and Green light NOT LIT.
Cue:
Comments SAT                     UNSAT                     Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training)                      Page 8 of 11


JPM Number: JPM454   Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
            *3.6   WHEN RPV pressure < 472 psig, THEN Open 1E12-F042A, LPCI From RHR A Shutoff Valve.
Page 9 of 11  *3.6 WHEN RPV pressure < 472 psi g, THEN Open 1E12-F042A, LPCI From RHR A Shutoff Valve.
Standard:           Verify RPV pressure < 472 psig.
Standard: Verify RPV pressure < 472 psig.
1E12-F042A handswitch to OPEN then spring release. Red light LIT and Green light NOT LIT.
1E12-F042A handswitch to OPEN then spring release. Red light LIT and Green light NOT LIT.
Cue: Comments As the CRS, if asked by the candidate if he/she should shut 1E12
Cue:
-F064A, direct the candidate to maximize flow.
Comments           As the CRS, if asked by the candidate if he/she should shut 1E12-F064A, direct the candidate to maximize flow.
SAT   UNSAT   Comment Number 3.7 WHEN RHR A flow  1100 gpm, THEN Shut 1E12-F064A, RHR Pump A Min Flow Recirc Valve.
SAT                     UNSAT                     Comment Number 3.7   WHEN RHR A flow  1100 gpm, THEN Shut 1E12-F064A, RHR Pump A Min Flow Recirc Valve.
Standard: Verify RHR A flow  1100 gpm. 1E12-F064A handswitch to CLOSE then spring release. Red light NOT LIT and Green light LIT.
Standard:           Verify RHR A flow  1100 gpm.
Cue: Comments   SAT   UNSAT   Comment Number TERMINATING CUES:
1E12-F064A handswitch to CLOSE then spring release. Red light NOT LIT and Green light LIT.
Cue:
Comments SAT                     UNSAT                     Comment Number TERMINATING CUES:
Div 1 LPCI is injecting to the RPV IAW CPS No. 4003.01C006.
Div 1 LPCI is injecting to the RPV IAW CPS No. 4003.01C006.
STOP TIME:
STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                      Page 9 of 11


JPM Number: JPM454   Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operators Name:
Page 10 of 11 Operator's Name:
Job Title:       NLO               RO                 SRO             STA           SRO Cert JPM Title:       RSP - Div 1 LPCI Operation JPM Number:     JPM454                                                       Revision Number: 00 Task Number and Title: 400301.02 Remote Shutdown Panel tasks that do NOT Require MCR Evacuation, Loss of Vital System Control ONLY (licensed task).
Job Title:
K/A System         K/A Number                     Importance (RO/SRO) 295016               AA1.07                     4.2                 4.3 Suggested Testing Environment:               Simulator Actual Testing Environment:                 Simulator             Plant           Control Room Testing Method:         Simulate                     Alternate Path:       Yes       No Perform                           SRO Only:       Yes       No Time Critical:         Yes           No Estimated Time to Complete:           10 minutes                 Actual Time Used:             minutes
NLO   RO   SRO   STA   SRO Cert JPM Title:
RSP - Div 1 LPCI Operation JPM Number:
JPM454 Revision Number:
00 Task Number and Title:
4 00301.02 Remote Shutdown Panel tasks that do NOT Require MCR Evacuation, Loss of Vital System Control ONLY (licensed task)
. K/A System K/A Number Importance (RO/SRO) 295016 AA1.07 4.2 4.3 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator   Plant   Control Room Testing Method:
Simulate Alternate Path:
Yes No     Perform SRO Only: Yes No Time Critical:
Yes   No Estimated Time to Complete:
10 minutes Actual Time Used:
minutes  


==References:==
==References:==
 
CPS No. 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation EVALUATION  
CPS No. 4003.01C006, Rev 0 RSP  
- Div 1 LPCI Operation EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                 Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             Satisfactory             Unsatisfactory Comments:
Yes   No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name:                                                             (Print)
Satisfactory   Unsatisfactory Comments:
Evaluators Signature:                                                              Date:
Evaluator's Name:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 10 of 11
(Print)   Evaluator's Signature:
 
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS:
Page 11 of 11  INITIAL CONDITIONS:
A plant transient has occurred.
A plant transient has occurred.
You are the Extra RO. The plant is Shutdown and depressurized.
You are the Extra RO. The plant is Shutdown and depressurized.
INITIATING CUE:
INITIATING CUE:
CAUTI ON  All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
Inject to the RPV using CPS 4003.01C006, Rev 0 RSP  
Inject to the RPV using CPS 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation Section 3.0, DIV 1 LPCI STARTUP.
- Div 1 LPCI Operation Section 3.0, DIV 1 LPCI STARTUP.
MAXIMIZE flowrate.
MAXIMIZE flowrate.
Report to the CRS when Div 1 LPCI is injecting to the RPV at the maximum flowrate.
Report to the CRS when Div 1 LPCI is injecting to the RPV at the maximum flowrate.
SRRS: 3D.105 (when utilized for operator initial or continuing training)              Page 11 of 11
CLINTON POWER STATION Job Performance Measure Emergency Initiation of the Div 2 DG Room CO2 System JPM Number: JPM455 Revision Number: 00 Date: 07/26/2011 Developed By:        W. Kiser                                      07/26/2011 Instructor                                    Date Validated By:
SME or Instructor                              Date Reviewed By:
Operations Representative                      Date Approved By:
Training Department                            Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
CLINTON POWER STATION Job Performance Measure Emergency Initiation of the Div 2 DG Room CO 2 System JPM Number: JPM45 5 Revision Number: 00 Date:  07/26/2011 Developed By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
W. Kiser  07/26/2011 Instructor Date  Validated By:
SME or Instructor  Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date JPM Number:  JPM455   Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
(*).
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 10. Verify performance time is accurate
Procedure                                 Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                                 Rev:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date JPM Number:  JPM455  Clinton Power Station Job Performance Measure (JPM)
Procedure                                 Rev:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     9. Verify cues both verbal and visual are free of conflict.
Page 3 of 11 Revision Record (Summary)
________     10. Verify performance time is accurate
Revision Date Description 00 07/26/2011 New JPM.
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
JPM Number:  JPM455  Clinton Power Station Job Performance Measure (JPM)
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor                                 Date SME / Instructor                                 Date SME / Instructor                                 Date SRRS: 3D.105 (when utilized for operator initial or continuing training)                         Page 2 of 11
Page 4 of 11 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
 
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision           Date                                               Description 00         07/26/2011         New JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                   Page 3 of 11
 
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS
TASK STANDARDS:
Emergency initiation of Division 2 Diesel Generator CO 2 System complete (simulated discharging
* Emergency initiation of Division 2 Diesel Generator CO2 System complete (simulated discharging).
). TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS No. 3213.01P001, Rev 0f Fire Protection CO2 Systems Operation EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* Provide examinee the procedure.
* Do NOT allow examinee to shine any type light into a panel.
* All pre-job briefings are completed.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                      Page 4 of 11


CPS No. 3213.01P001, Rev 0 f Fire Protection CO 2 Systems Operation EVALUATOR INSTRUCTIONS:
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
Amplifying cues are provided within the JPM steps.
INITIAL CONDITIONS:
Provide examinee the procedure.
A fire has been reported in the Division 2 Diesel Generator (Div 2 DG) Room. The Div 2 DG Room CO2 system did not automatically initiate.
Do NOT allow examinee to shine any type light into a panel.
The Div 2 DG Room is free of personnel and Extra Operators have been stationed at the Div 2 DG Room doors to ensure no personnel enter the room. When asked, the Extra Operators will also inform you when the Div 2 DG Room CO2 system initiates (begins discharging).
All pre-job briefings are completed.
 
JPM Number: JPM455   Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 11  INITIAL CONDITIONS:
A fire has been reported in the Division 2 Diesel Generator (Div 2 DG) Room. The Div 2 DG Room CO 2 system did not automatically initiate.
The Div 2 DG Room is free of personnel and Extra Operators have been stationed at the Div 2 DG Room doors to ensure no personnel enter the room. When asked, the Extra Operators will also inform you when the Div 2 DG Room CO 2 system initiates (begins discharging).
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
Do NOT shine any type light into a panel.
You are directed to manually initiate the Div 2 DG Room CO 2 System using CPS 3213.01P001, Fire Protection CO 2 Systems Operation
You are directed to manually initiate the Div 2 DG Room CO2 System using CPS 3213.01P001, Fire Protection CO2 Systems Operation.
. Report to the CRS when the Div 2 DG Room CO 2 System is discharging.
Report to the CRS when the Div 2 DG Room CO2 System is discharging.
START TIME:
START TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                Page 5 of 11
 
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3213.01P001, Fire Protection CO2 Systems Operation Section 8.22, Manual Initiation of the Diesel Generator Rooms CO2 System 8.22.1    Perform/Ensure Performed a search and rescue of the area unless it is known to be free of personnel.
Standard:            Asks Extra Operator of Div 2 DG Room status.
Cue:
Comments            When requested, or if the candidate attempts to check for himself/herself, as Extra Operator report that the room is free of personnel.
SAT                    UNSAT                    Comment Number
          *8.22.2    Pull the Breakglass station and depress button to initiate discharge.
* 1HSCO002A, for DG1B Room CO2 Breakglass Station Standard:            (SIMULATE) At 1HSCO002A Breakglass station pulled; button DEPRESSED.
Cue:                Glass BROKEN. Button DEPRESSED.
Comments            When requested, as Extra Operator report the Div 2 DG Room CO2 system did not discharge.
SAT                    UNSAT                    Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training)                        Page 6 of 11


JPM Number: JPM455   Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
BEGIN ALTERNATE PATH CPS 3213.01P001, Fire Protection CO2 Systems Operation Section 8.23, Redundant Manual Initiation of the Diesel Generator Rooms CO2 System
Page 6 of 11 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
      *8.23.1/2     IF no discharge occurs by manual initiation of the Breakglass station, THEN OPEN Master Pilot Valve No. 1 per step 8.23.2.
PERFORMANCE STEPS CPS 3213.01P001
(located across the corridor on 737 Control at 128-AA)
, Fire Protection CO 2 Systems Operation Section 8.22, Manual Initiation of the Diesel Generator Rooms CO 2 System 8.22.1 Perform/Ensure Performed a search and rescue of the area unless it is known to be free of personnel.
To operate 1USV-CO005, Master Pilot Valve No. 1, break glass and open the pilot which charges the CO2 lines from the CO2 storage tank up to the Selector Valves.
Standard: Asks Extra Operator of Div 2 DG Room status.
Standard:           (SIMULATE) At 1USV-CO005 glass broken; pilot OPENED.
Cue:  Comments When requested, or if the candidate attempts to check for himself/herself, as Extra Operator report that the room is free of personnel.
Cue:               Glass BROKEN. Pilot OPENED.
SAT  UNSAT    Comment Number 
Comments SAT                     UNSAT                     Comment Number
  *8.22.2 Pull the Breakglass station and depress button to initiate discharge.
        *8.23.3     To initiate flow of CO2 from the CO2 Storage Tank to the DG room containing the hazard, open the Selector Valve for the applicable DG room.
1HSCO002A, for DG1B Room CO 2 Breakglass Station Standard: (SIMULATE)
* For DG1B Room, Open 1USV-CO002, Selector Pilot Valve, for 1 minute.
At 1HSCO002A Breakglass station pulled; button DEPRESSED. Cue: Glass BROKEN. Button DEPRESSED.
Standard:           (SIMULATE) At 1USV-CO002 glass broken; pilot OPENED for 1 minute.
Comments When requested, as Extra Operator report "the Div 2 DG Room CO 2 system did not discharge".
Cue:               Glass BROKEN. Pilot OPENED.
SAT  UNSAT    Comment Number JPM Number:  JPM455  Clinton Power Station Job Performance Measure (JPM)
Comments           When requested, as Extra Operator report the Div 2 DG Room CO2 system did not discharge.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SAT                     UNSAT                     Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training)                      Page 7 of 11
Page 7 of 11  BEGIN ALTERNATE PATH CPS 3213.01P001
, Fire Protection CO 2 Systems Operation Section 8.23, Redundant Manual Initiation of the Diesel Generator Rooms CO 2 System *8.23.1/2 IF no discharge occurs by manual initiation of the Breakglass station, THE N OPEN Master Pilot Valve No. 1 per step 8.23.2.
(located across the corridor on 737 Control at 128
-AA) To operate 1USV
-CO005, Master Pilot Valve No. 1, break glass and open the pilot which charges the CO 2 lines from the CO 2 storage tank up to the Selector Valves. Standard: (SIMULATE)
At 1USV-CO005 glass broken; pilot OPENED.
Cue: Glass BROKEN. Pilot OPENED.
Comments   SAT   UNSAT   Comment Number
  *8.2 3.3 To initiate flow of CO 2 from the CO 2 Storage Tank to the DG room containing the hazard, open the Selector Valve for the applicable DG room.
For DG1B Room, Open 1USV
-CO002, Selector Pilot Valve, for 1 minute.
Standard: (SIMULATE)
At 1USV-CO002 glass broken; pilot OPENED for 1 minute.
Cue: Glass BROKEN. Pilot OPENED.
Comments When requested, as Extra Operator report "the Div 2 DG Room CO 2 system did not discharge". SAT   UNSAT   Comment Number


JPM Number: JPM455   Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
CPS 3213.01P001, Fire Protection CO2 Systems Operation Section 8.24, Emergency Initiation of the Diesel Generator Rooms CO2 System 8.24.1   IF both methods of manual initiation fail to discharge, THEN initiate the CO2 system as follows:
Page 8 of 11 CPS 3213.01P001
, Fire Protection CO 2 Systems Operation Section 8.24, Emergency Initiation of the Diesel Generator Rooms CO 2 System 8.24.1 IF both methods of manual initiation fail to discharge, THEN initiate the CO 2 system as follows:
Open/Check Open Master Pilot Valve No. 1.
Open/Check Open Master Pilot Valve No. 1.
Standard: (SIMULATE)
Standard:           (SIMULATE) At 1USV-CO005; pilot checked OPEN.
At 1USV-CO005; pilot checked OPEN.
Cue:               1USV-CO005 OPEN Comments SAT                     UNSAT                     Comment Number 8.24.2   Open/Check Open the desired Selector Pilot Valve.
Cue: 1USV-CO005 OPEN Comments   SAT   UNSAT   Comment Number 8.24.2 Open/Check Open the desired Selector Pilot Valve.
Standard:           (SIMULATE) At 1USV-CO002; pilot checked OPEN.
Standard: (SIMULATE) At 1USV-CO002; pilot checked OPEN.
Cue:               1USV-CO002 OPEN Comments SAT                     UNSAT                     Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training)                      Page 8 of 11
Cue: 1USV-CO002 OPEN Comments   SAT   UNSAT   Comment Number


JPM Number: JPM455   Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
      *8.24.3/4     Proceed to 1CO652, Remote Emergency Manual Valve (located at A & 126 at 737 Radwaste).
Page 9 of 11  *8.2 4.3/4 Proceed to 1CO652, Remote Emergency Manual Valve (located at A & 126 at 737 Radwaste).
Open 1CO652, Remote Emergency Manual Valve, by breaking seal and pull lever down.
Open 1CO652, Remote Emergency Manual Valve, by breaking seal and pull lever down.
Standard: (SIMULATE)
Standard:           (SIMULATE) At 1CO652 Seal broken; lever pulled down.
At 1CO652 Seal broken; lever pulled down
Cue:               Seal Broken. Lever in downward position.
. Cue: Seal Broken. Lever in downward position.
Comments           When requested, as Extra Operator report the Div 2 DG Room CO2 system IS discharging.
Comments When requested, as Extra Operator report "the Div 2 DG Room CO 2 system IS discharging
SAT                    UNSAT                     Comment Number TERMINATING CUES:
". SA T  UNSAT   Comment Number TERMINATING CUES:
Div 2 DG Room CO2 System is discharging (simulated).
Div 2 DG Room CO 2 System is discharging (simulated).
STOP TIME:
STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                      Page 9 of 11


JPM Number: JPM455   Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operators Name:
Page 10 of 11 Operator's Name:
Job Title:       NLO               RO                 SRO             STA           SRO Cert JPM Title:       Emergency Initiation of the Div 2 DG Room CO2 System JPM Number:     JPM455                                                        Revision Number: 00 Task Number and Title: 321301.56 Emergency Initiation of the Diesel Generator Rooms CO2 System.
Job Title:
K/A System         K/A Number                     Importance (RO/SRO) 286000                2.4.25                     3.3                 3.7 Suggested Testing Environment:                 Plant Actual Testing Environment:                 Simulator             Plant           Control Room Testing Method:         Simulate                     Alternate Path:       Yes       No Perform                           SRO Only:       Yes       No Time Critical:         Yes           No Estimated Time to Complete:           15 minutes                 Actual Time Used:             minutes
NLO   RO   SRO   STA   SRO Cert JPM Title:
Emergency Initiation of the Div 2 DG Room CO 2 System JPM Number: JPM45 5 Revision Number:
00 Task Number and Title:
321301.56 Emergency Initiation of the Diesel Generator Rooms CO 2 System. K/A System K/A Number Importance (RO/SRO) 2 86000 2.4.25 3.3 3.7 Suggested Testing Environment:
Plant Actual Testing Environment:   Simulator   Plant   Control Room Testing Method:
Simulate Alternate Path:
Yes No     Perform SRO Only: Yes No Time Critical:
Yes   No Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes  


==References:==
==References:==
 
CPS No. 3213.01P001, Rev 0f Fire Protection CO2 Systems Operation EVALUATION  
CPS No. 3213.01P001, Rev 0f Fire Protection CO 2 Systems Operation EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                 Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                             Satisfactory             Unsatisfactory Comments:
Yes   No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name:                                                             (Print)
Satisfactory Unsatisfactory Comments:
Evaluators Signature:                                                              Date:
Evaluator's Name:
SRRS: 3D.105 (when utilized for operator initial or continuing training)                            Page 10 of 11
(Print)   Evaluator's Signature:
 
Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS:
Page 11 of 11  INITIAL CONDITIONS:
A fire has been reported in the Division 2 Diesel Generator (Div 2 DG) Room. The Div 2 DG Room CO2 system did not automatically initiate.
A fire has been reported in the Division 2 Diesel Generator (Div 2 DG) Room. The Div 2 DG Room CO 2 system did not automatically initiate.
The Div 2 DG Room is free of personnel and Extra Operators have been stationed at the Div 2 DG Room doors to ensure no personnel enter the room. When asked, the Extra Operators will also inform you when the Div 2 DG Room CO2 system initiates (begins discharging).
The Div 2 DG Room is free of personnel and Extra Operators have been stationed at the Div 2 DG Room doors to ensure no personnel enter the room. When asked, the Extra Operators will also inform you when the Div 2 DG Room CO 2 system initiates (begins discharging).
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
Do NOT shine any type light into a panel.
You are directed to manually initiate the Div 2 DG Room CO 2 System using CPS 3213.01P001, Fire Protection CO 2 Systems Operation.
You are directed to manually initiate the Div 2 DG Room CO2 System using CPS 3213.01P001, Fire Protection CO2 Systems Operation.
Report to the CRS when the Div 2 DG Room CO 2 System is discharging.}}
Report to the CRS when the Div 2 DG Room CO2 System is discharging.
SRRS: 3D.105 (when utilized for operator initial or continuing training)                Page 11 of 11}}

Revision as of 08:10, 12 November 2019

2011 Clinton Power Station Administered In-Plant JPMs
ML12046A877
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/29/2011
From:
Operations Branch III
To:
Exelon Nuclear
References
JPM026
Download: ML12046A877 (33)


Text

CLINTON POWER STATION Job Performance Measure Manual Transfer of Distribution Panel Loads (NSPS Solenoid / RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 02 Date: 02/18/2011 Developed By: T Pickley 02/18/2011 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with asterisk an (*)
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 06/11/07 New JPM.

01 08/31/10 Updated Format. Updated Procedure Revision Number.

02 02/18/11 Updated Procedure Revision Number and K/A.

Page 3 of 11

JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • Manually Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter IAW CPS 3509.01, Rev 020b, INSTRUMENT POWER SYSTEM (IP).

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 3509.01, Rev 020b, INSTRUMENT POWER SYSTEM (IP)

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • Provide examinee the procedure.
  • Do NOT allow examinee to shine any type light into a panel.
  • All pre-job briefings are completed.

Page 4 of 11

JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

  • Plant is in Mode 1.
  • RPS Solenoid Inverter A has just been restored from a short maintenance period.
  • The RPS Solenoid Inverter A has been energized per Section 8.3.6 steps 1 and 2.

It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.

  • MSIV solenoid currents have been verified normal (solenoids are reset).
  • The A and B solenoids for each Control Rod have been verified energized.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Do NOT shine any type light into a panel.

You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus A FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.

START TIME:

Page 5 of 11

JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CAUTION When the Inverter Transfer Switch is moved from the BYPASS position, it moves from the BYPASS position to the OFF position before moving to the INVERTER position. This will initiate a HALF SCRAM if the other bus is energized or a FULL SCRAM if the other bus is deenergized. This could cause a single rod scram if the other solenoid is deenergized. Also, 120 VAC Output Bkr, CB-3 will trip OFF due to the Power Monitor.

CPS No. 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1 Verify LOSS OF SYNC lamp not illuminated.

Standard: At RPS Solenoid Inverter A verifies the loss of sync lamp is not illuminated.

Cue: 1. Loss of sync lamp is not illuminated - (NOTE: Ensure operator is at RPS Solenoid Inverter A.)

Comments SAT UNSAT Comment Number Page 6 of 11

JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM) 8.3.4.2 IF MSIVs are open, THEN Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13-P661 and P662. <<CM-5>>

Standard: Verifies MSIV Solenoids are reset.

Cue: 1. Stated in the initial conditions all solenoids were reset.

Comments SAT UNSAT Comment Number 8.3.4.3 (Modes 1 and 2 only)

Check A and B solenoids for each control rod to ensure they are energized prior to transferring sources (provided adequate time is available for the check).

Temperature should be greater than ambient.

Standard: Ensures all control rods A and B solenoids are energized.

Cue: 1. Stated in the initial conditions all solenoids were energized.

Comments SAT UNSAT Comment Number Page 7 of 11

JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)

  • 8.3.4.4 Place TRANSFER SWITCH to INVERTER.

Standard: At RPS Solenoid Inverter A, places Transfer Switch To Inverter Position.

Cue: 1. Transfer switch is in the Inverter Position.

Comments As Found Position: BYPASS SAT UNSAT Comment Number 8.3.4.5 Push and then release:

Power Monitor RESET push-button.

Standard: At RPS Solenoid Inverter A, pushes then releases Power Monitor Reset push button.

Cue: 1. Power Monitor Reset pushbutton has been depressed then released.

Comments SAT UNSAT Comment Number 8.3.4.6 Verify power monitor alarms are out.

Standard: At RPS Solenoid Inverter A power monitor, verifies alarms are out.

Cue: 1. Power Monitor alarms are out.

Comments SAT UNSAT Comment Number Page 8 of 11

JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)

  • 8.3.4.7 Place 120 VAC OUTPUT BKR, CB-3 to ON.

Standard: At RPS Solenoid Inverter A, places 120 vac Output Bkr, CB-3, to ON.

Cue: 1. 120 VAC Output Bkr, CB-3 is in the ON position.

Comments As Found Position: OFF SAT UNSAT Comment Number 8.3.4.8 IF Mngt or NSED recommends, THEN At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr:

Place AC INPUT (POWER) Bkr to OFF (down).

5006-3L(4L) will be in alarm when bkr is OFF.

Standard: Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.

Cue: 1. If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby. DO NOT turn the AC Input Bkr to OFF.

Comments SAT UNSAT Comment Number TERMINATING CUES:

CPS 3509.01, Instrument Power (IP), Step 8.3.4 complete.

STOP TIME:

Page 9 of 11

JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job Title: EO RO SRO STA SRO Cert JPM Title: Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 02 Task Number and Title: 350901.23, Manual Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter K/A System K/A Number Importance (RO/SRO) 262002 2.1.30 4.4 4.0 Suggested Testing Environment: Plant Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

CPS 3509.01, Rev 020b, INSTRUMENT POWER SYSTEM (IP)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

  • Plant is in Mode 1.
  • RPS Solenoid Inverter A has just been restored from a short maintenance period.
  • The RPS Solenoid Inverter A has been energized per Section 8.3.6 steps 1 and 2.

It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.

  • MSIV solenoid currents have been verified normal (solenoids are reset).
  • The A and B solenoids for each Control Rod have been verified energized.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Do NOT shine any type light into a panel.

You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus A FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure RSP - Div 1 LPCI Operation JPM Number: JPM454 Revision Number: 00 Date: 07/26/2011 Developed By: W. Kiser 07/26/2011 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 11

JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 07/26/2011 New JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 11

JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. Initialize to any suitable IC with the following:
  • RPV depressurized.
2. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
3. This completes the setup for this JPM.
4. Save to a different IC if JPM is being used more than once.
5. Freeze Simulator.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 11

JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Div 1 LPCI is injecting to the RPV.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 11

JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant transient has occurred.

You are the Extra RO. The plant is Shutdown and depressurized.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Inject to the RPV using CPS 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation Section 3.0, DIV 1 LPCI STARTUP.

MAXIMIZE flowrate.

Report to the CRS when Div 1 LPCI is injecting to the RPV at the maximum flowrate.

START TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 11

JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation 3.1 Verify 1E12-F004A, RHR A Suppression Pool Suction Valve handswitch is in OPEN.

Standard: 1E12-F004A handswitch verified in OPEN.

Cue:

Comments SAT UNSAT Comment Number

  • 3.2 Verify/place following transfer switches to EMERG:

a) C61-S6 d) C61-S9 b) C61-S7 e) C61-S12 c) C61-S8 f) C61-HS502 Standard: Transfer switches C61-S6, C61-S7, C61-S8, C61-S9, C61-S12 and C61-HS502 placed to EMERG.

Cue:

Comments SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 11

JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)

Standard: 1E12-F064A handswitch to OPEN then spring release. Red light LIT and Green light NOT LIT.

Cue:

Comments SAT UNSAT Comment Number

Standard: 1E12-C002A handswitch to START then spring release. Red light LIT and Green light NOT LIT.

Cue:

Comments SAT UNSAT Comment Number 3.5 Verify RHR Pump 1A Room Sply Fan, 1VY02C starts.

Standard: Verifies 1VY02C Red light LIT and Green light NOT LIT.

Cue:

Comments SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 11

JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)

Standard: Verify RPV pressure < 472 psig.

1E12-F042A handswitch to OPEN then spring release. Red light LIT and Green light NOT LIT.

Cue:

Comments As the CRS, if asked by the candidate if he/she should shut 1E12-F064A, direct the candidate to maximize flow.

SAT UNSAT Comment Number 3.7 WHEN RHR A flow 1100 gpm, THEN Shut 1E12-F064A, RHR Pump A Min Flow Recirc Valve.

Standard: Verify RHR A flow 1100 gpm.

1E12-F064A handswitch to CLOSE then spring release. Red light NOT LIT and Green light LIT.

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

Div 1 LPCI is injecting to the RPV IAW CPS No. 4003.01C006.

STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 11

JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job Title: NLO RO SRO STA SRO Cert JPM Title: RSP - Div 1 LPCI Operation JPM Number: JPM454 Revision Number: 00 Task Number and Title: 400301.02 Remote Shutdown Panel tasks that do NOT Require MCR Evacuation, Loss of Vital System Control ONLY (licensed task).

K/A System K/A Number Importance (RO/SRO) 295016 AA1.07 4.2 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

CPS No. 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant transient has occurred.

You are the Extra RO. The plant is Shutdown and depressurized.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Inject to the RPV using CPS 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation Section 3.0, DIV 1 LPCI STARTUP.

MAXIMIZE flowrate.

Report to the CRS when Div 1 LPCI is injecting to the RPV at the maximum flowrate.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 11

CLINTON POWER STATION Job Performance Measure Emergency Initiation of the Div 2 DG Room CO2 System JPM Number: JPM455 Revision Number: 00 Date: 07/26/2011 Developed By: W. Kiser 07/26/2011 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 11

JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 07/26/2011 New JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 11

JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • Emergency initiation of Division 2 Diesel Generator CO2 System complete (simulated discharging).

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 3213.01P001, Rev 0f Fire Protection CO2 Systems Operation EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • Provide examinee the procedure.
  • Do NOT allow examinee to shine any type light into a panel.
  • All pre-job briefings are completed.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 11

JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A fire has been reported in the Division 2 Diesel Generator (Div 2 DG) Room. The Div 2 DG Room CO2 system did not automatically initiate.

The Div 2 DG Room is free of personnel and Extra Operators have been stationed at the Div 2 DG Room doors to ensure no personnel enter the room. When asked, the Extra Operators will also inform you when the Div 2 DG Room CO2 system initiates (begins discharging).

INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Do NOT shine any type light into a panel.

You are directed to manually initiate the Div 2 DG Room CO2 System using CPS 3213.01P001, Fire Protection CO2 Systems Operation.

Report to the CRS when the Div 2 DG Room CO2 System is discharging.

START TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 11

JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3213.01P001, Fire Protection CO2 Systems Operation Section 8.22, Manual Initiation of the Diesel Generator Rooms CO2 System 8.22.1 Perform/Ensure Performed a search and rescue of the area unless it is known to be free of personnel.

Standard: Asks Extra Operator of Div 2 DG Room status.

Cue:

Comments When requested, or if the candidate attempts to check for himself/herself, as Extra Operator report that the room is free of personnel.

SAT UNSAT Comment Number

  • 8.22.2 Pull the Breakglass station and depress button to initiate discharge.
  • 1HSCO002A, for DG1B Room CO2 Breakglass Station Standard: (SIMULATE) At 1HSCO002A Breakglass station pulled; button DEPRESSED.

Cue: Glass BROKEN. Button DEPRESSED.

Comments When requested, as Extra Operator report the Div 2 DG Room CO2 system did not discharge.

SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 11

JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)

BEGIN ALTERNATE PATH CPS 3213.01P001, Fire Protection CO2 Systems Operation Section 8.23, Redundant Manual Initiation of the Diesel Generator Rooms CO2 System

  • 8.23.1/2 IF no discharge occurs by manual initiation of the Breakglass station, THEN OPEN Master Pilot Valve No. 1 per step 8.23.2.

(located across the corridor on 737 Control at 128-AA)

To operate 1USV-CO005, Master Pilot Valve No. 1, break glass and open the pilot which charges the CO2 lines from the CO2 storage tank up to the Selector Valves.

Standard: (SIMULATE) At 1USV-CO005 glass broken; pilot OPENED.

Cue: Glass BROKEN. Pilot OPENED.

Comments SAT UNSAT Comment Number

  • 8.23.3 To initiate flow of CO2 from the CO2 Storage Tank to the DG room containing the hazard, open the Selector Valve for the applicable DG room.
  • For DG1B Room, Open 1USV-CO002, Selector Pilot Valve, for 1 minute.

Standard: (SIMULATE) At 1USV-CO002 glass broken; pilot OPENED for 1 minute.

Cue: Glass BROKEN. Pilot OPENED.

Comments When requested, as Extra Operator report the Div 2 DG Room CO2 system did not discharge.

SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 11

JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)

CPS 3213.01P001, Fire Protection CO2 Systems Operation Section 8.24, Emergency Initiation of the Diesel Generator Rooms CO2 System 8.24.1 IF both methods of manual initiation fail to discharge, THEN initiate the CO2 system as follows:

Open/Check Open Master Pilot Valve No. 1.

Standard: (SIMULATE) At 1USV-CO005; pilot checked OPEN.

Cue: 1USV-CO005 OPEN Comments SAT UNSAT Comment Number 8.24.2 Open/Check Open the desired Selector Pilot Valve.

Standard: (SIMULATE) At 1USV-CO002; pilot checked OPEN.

Cue: 1USV-CO002 OPEN Comments SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 11

JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)

  • 8.24.3/4 Proceed to 1CO652, Remote Emergency Manual Valve (located at A & 126 at 737 Radwaste).

Open 1CO652, Remote Emergency Manual Valve, by breaking seal and pull lever down.

Standard: (SIMULATE) At 1CO652 Seal broken; lever pulled down.

Cue: Seal Broken. Lever in downward position.

Comments When requested, as Extra Operator report the Div 2 DG Room CO2 system IS discharging.

SAT UNSAT Comment Number TERMINATING CUES:

Div 2 DG Room CO2 System is discharging (simulated).

STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 11

JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job Title: NLO RO SRO STA SRO Cert JPM Title: Emergency Initiation of the Div 2 DG Room CO2 System JPM Number: JPM455 Revision Number: 00 Task Number and Title: 321301.56 Emergency Initiation of the Diesel Generator Rooms CO2 System.

K/A System K/A Number Importance (RO/SRO) 286000 2.4.25 3.3 3.7 Suggested Testing Environment: Plant Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

CPS No. 3213.01P001, Rev 0f Fire Protection CO2 Systems Operation EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A fire has been reported in the Division 2 Diesel Generator (Div 2 DG) Room. The Div 2 DG Room CO2 system did not automatically initiate.

The Div 2 DG Room is free of personnel and Extra Operators have been stationed at the Div 2 DG Room doors to ensure no personnel enter the room. When asked, the Extra Operators will also inform you when the Div 2 DG Room CO2 system initiates (begins discharging).

INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Do NOT shine any type light into a panel.

You are directed to manually initiate the Div 2 DG Room CO2 System using CPS 3213.01P001, Fire Protection CO2 Systems Operation.

Report to the CRS when the Div 2 DG Room CO2 System is discharging.