ML17303B026: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:i~g CEZZRATZD M JBUTION DEMONS QON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8804190029 DOC.DATE: 88/04/12 NOTARIZED:
{{#Wiki_filter:i
NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH.NAME AUTHOR AFFILIATION HAYNES,J.G.
    ~g CEZZRATZD         M     JBUTION       DEMONS         QON     SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
ACCESSION NBR:8804190029       DOC.DATE: 88/04/12   NOTARIZED: NO       DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station,     Unit 1, Arizona Publi 05000528 AUTH. NAME         AUTHOR AFFILIATION HAYNES,J.G.       Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME         RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Special Rept 1-SR-88-004:on 880407,loose part detection instrumentation inoperable for more than 30 days.DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.NOTES:Standardized plant.05000528~RECIPIENT ID CODE/NAME PD5 LA LICITRA,E INTERNAL: ACRS MICHELSON AEOD/DOA AEOD/DSP/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB 9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 S SIB 9A REG FIL 02 SfDE" RGN5 FILE 01 EXTERNAL: EGG(G GROH, M H ST LOBBY WARD NRC PDR NSIC MAYS,G NOTES COPIES LTTR ENCL 1 1 1 1 1 1 1 1 2 2 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1,1 1 1 1 1 4 4 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M ACRS MOELLER AEOD/DSP/NAS AEOD/DSP/TPAB DEDRO NRR/DEST/CEB 8H.NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 RES TELFORD,J RES/DRPS DIR FORD BLDG HOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 S A D'D TOTAL NUMBER OF COPIES REQUIRED: LTTR 47 ENCL 46 Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX.ARIZONA 85072-2034 192-00365-JGH/TDS/JEN April 12, 1988 U.S.Nuclear Regulatory Commission NRC Document Control Desk Washington, D.C.20555
Special Rept 1-SR-88-004:on 880407,loose part detection instrumentation inoperable for more than 30 days.
DISTRIBUTION CODE: IE22D     COPIES RECEIVED:LTR     ENCL     SIZE:
TITLE: 50.73 Licensee Event Report (LER),     Incident Rpt, etc.
NOTES:Standardized plant.                                               05000528 ~
RECIPIENT       COPIES          RECIPIENT        COPIES ID CODE/NAME     LTTR ENCL      ID  CODE/NAME    LTTR ENCL PD5 LA               1    1    PD5 PD                1    1 LICITRA,E             1    1    DAVIS,M              1    1 INTERNAL: ACRS MICHELSON         1    1    ACRS MOELLER          2    2 AEOD/DOA             1    1    AEOD/DSP/NAS          1    1 AEOD/DSP/ROAB         2    2    AEOD/DSP/TPAB        1    1 ARM/DCTS/DAB         1    1    DEDRO                1    1 NRR/DEST/ADS   7E     1    0    NRR/DEST/CEB 8H.      1    1 NRR/DEST/ESB  8D    1    1    NRR/DEST/ICSB 7      1    1 NRR/DEST/MEB  9H    1    1    NRR/DEST/MTB 9H      1   1 NRR/DEST/PSB  8D    1    1    NRR/DEST/RSB 8E      1    1 NRR/DEST/SGB  8D    1    1    NRR/DLPQ/HFB 10      1    1 NRR/DLPQ/QAB  10     1    1    NRR/DOEA/EAB 11       1    1 NRR/DREP/RAB  10    1    1    NRR/DREP/RPB 10       2    2 REG  FIL SfDE" S SIB 9A 02    1,1 1
1 1
1 NRR/PMAS/ILRB12 RES TELFORD,J RES/DRPS DIR 1
1 1
1 1
1 RGN5    FILE  01    1     1 EXTERNAL:  EGG(G GROH, M        4    4    FORD BLDG HOY,A      1   1 H ST LOBBY WARD      1     1     LPDR                  1   1 NRC PDR              1     1     NSIC HARRIS,J        1   1 NSIC MAYS,G          1     1 NOTES                            1     1 S
A D
                                                                                    'D TOTAL NUMBER OF COPIES REQUIRED: LTTR       47   ENCL   46


==Dear Sirs:==
Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX. ARIZONA 85072-2034 192-00365-JGH/TDS/JEN April 12, 1988 U. S. Nuclear Regulatory Commission NRC  Document  Control Desk Washington,    D.C. 20555
 
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 1 Docket No.STN 50-528 (License No.NPF-41)Special Report 1-SR-88-004.File: 88-020-404 Attached please find Special Report 1-SR-88-004 prepared and submitted pursuant to Technical Specification 3.3.3.7 ACTION a and Technical Specification 6.9.2.This report discusses the loose-part detection instrumentation being inoperable for more than 30 days.If you have any questions,'lease contact T.D.Shriver, Compliance flanager at (602)393-2521.Very trul yours, JGH/TDS/JEH/kj Attachment cc: 0.H.Def1ichele E.E.Van Brunt, Jr.J.B.Har tin T.J.Polich E.A.Licitra A.C.Gehr INPO Records Center (all w/a)J.G.Hay es Vice President Nuclear Production 8804190029 8804i2 PDR ADOCK 05000528 DCD,.
Palo Verde Nuclear Generating Station (PVNGS)
PALO VERDE NUCLEAR GENERATING STATION LOOSE-PART DETECTION INSTRUHENTATION License No.NPF-41 Docket No.50-528 Special Report No.1-SR-88-004 This Special Report is being submitted pursuant to Technical Specification 3.3.3.7 ACTION"a" and Technical Specification 6.9.2'addressing the loose-part detection instrumentation being inoperable for more than 30 days.The 30 day period for returning the system to an operable status was exceeded at approximately 0010 HST on April 7, 1988.Palo Verde Unit 1 entered Hode 2 (STARTUP)at approximately 0010 HST on Harch 8, 1988 upon completion of its first refueling outage.The inoperable portion'of the loose-part detection instrumentation is in the circuitry associated with instrument number JSVNYE-2, which is located on the upper reactor vessel head.The inoperable status is caused by a break-up of the signal coming from the sensor.The sensor and the hardline cable had been replaced as discussed in letter ANPP-36011-EEVB/KLH-98.05, E.E.Van Brunt, Jr.to Director of Nuclear Reactor Regulation, dated April 9, 1986.Surveillance Test 36ST-9SV02 (Vibration and Loose Parts Honitoring System Calibration Test)was performed satisfactorily on loose-part detection instrumentation in January, 1988.The reactor vessel head was removed for inspection and maintenance and reinstalled in February, 1988.On triarch 4, 1988 the loose-part detection instrumentation channel 2 problem was identified and is believed to be.either the sensor or the cable although an exact root cause has not been determined.
Unit 1 Docket No. STN 50-528 (License No. NPF-41)
An authorized work control document has been prepared and will be scheduled for the next outage of sufficient duration.}}
Special Report 1-SR-88-004
                .File: 88-020-404 Attached please find Special Report 1-SR-88-004 prepared and submitted pursuant to Technical Specification 3.3.3.7 ACTION a and Technical Specification 6.9.2. This report discusses the loose-part detection instrumentation being inoperable for more than 30 days.
If you   have any   questions,'lease       contact T. D. Shriver, Compliance flanager at (602) 393-2521.
Very   trul yours, J. G. Hay es Vice President Nuclear Production JGH/TDS/JEH/kj Attachment cc:   0. H. Def1ichele           (all  w/a)
E. E. Van   Brunt, Jr.
J. B. Har tin T. J. Polich E. A. Licitra A. C. Gehr INPO Records Center 8804190029 8804i2 PDR   ADOCK 05000528 DCD,.
 
PALO VERDE NUCLEAR GENERATING STATION LOOSE-PART DETECTION INSTRUHENTATION License No. NPF-41 Docket No. 50-528 Special Report No. 1-SR-88-004 This Special Report is being submitted pursuant     to Technical Specification 3.3.3.7 ACTION "a" and Technical Specification     6.9.2'addressing the loose-part detection instrumentation being inoperable for   more than 30 days. The 30 day period for returning the system to an operable     status was exceeded at approximately 0010 HST on April 7, 1988.
Palo Verde Unit 1 entered Hode 2 (STARTUP) at approximately 0010 HST on Harch 8, 1988 upon completion of its first refueling outage. The inoperable portion
'of the loose-part detection instrumentation is in the circuitry associated with instrument number JSVNYE-2, which is located on the upper reactor vessel head. The inoperable status is caused by a break-up of the signal coming from the sensor.
The sensor and   the hardline cable had been replaced as discussed in letter ANPP-36011-EEVB/KLH-98.05, E. E. Van Brunt, Jr. to Director of Nuclear Reactor Regulation, dated April 9, 1986. Surveillance Test 36ST-9SV02 (Vibration and Loose Parts Honitoring System Calibration Test) was performed satisfactorily on loose-part detection instrumentation in January, 1988. The reactor vessel head was removed for inspection and maintenance and reinstalled in February, 1988. On triarch 4, 1988 the loose-part detection instrumentation channel 2 problem was identified and is believed to be. either the sensor or the cable although an exact root cause has not been determined.
An authorized work control document has been prepared and     will be scheduled for the   next outage of sufficient duration.}}

Latest revision as of 10:00, 29 October 2019

Special Rept 1-SR-88-004:on 880407,loose Part Detection Instrumentation Declared Inoperable for More than 30 Days. Caused by Breakup of Signal Coming from Sensor.Work Control Document Prepared & Will Be Scheduled for Next Outage
ML17303B026
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/12/1988
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
1-SR-88-004, 1-SR-88-4, 192-00365-JGH-T, 192-365-JGH-T, NUDOCS 8804190029
Download: ML17303B026 (4)


Text

i

~g CEZZRATZD M JBUTION DEMONS QON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8804190029 DOC.DATE: 88/04/12 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH. NAME AUTHOR AFFILIATION HAYNES,J.G. Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special Rept 1-SR-88-004:on 880407,loose part detection instrumentation inoperable for more than 30 days.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:Standardized plant. 05000528 ~

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 LICITRA,E 1 1 DAVIS,M 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 AEOD/DOA 1 1 AEOD/DSP/NAS 1 1 AEOD/DSP/ROAB 2 2 AEOD/DSP/TPAB 1 1 ARM/DCTS/DAB 1 1 DEDRO 1 1 NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H. 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RAB 10 1 1 NRR/DREP/RPB 10 2 2 REG FIL SfDE" S SIB 9A 02 1,1 1

1 1

1 NRR/PMAS/ILRB12 RES TELFORD,J RES/DRPS DIR 1

1 1

1 1

1 RGN5 FILE 01 1 1 EXTERNAL: EGG(G GROH, M 4 4 FORD BLDG HOY,A 1 1 H ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC HARRIS,J 1 1 NSIC MAYS,G 1 1 NOTES 1 1 S

A D

'D TOTAL NUMBER OF COPIES REQUIRED: LTTR 47 ENCL 46

Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX. ARIZONA 85072-2034 192-00365-JGH/TDS/JEN April 12, 1988 U. S. Nuclear Regulatory Commission NRC Document Control Desk Washington, D.C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 (License No. NPF-41)

Special Report 1-SR-88-004

.File: 88-020-404 Attached please find Special Report 1-SR-88-004 prepared and submitted pursuant to Technical Specification 3.3.3.7 ACTION a and Technical Specification 6.9.2. This report discusses the loose-part detection instrumentation being inoperable for more than 30 days.

If you have any questions,'lease contact T. D. Shriver, Compliance flanager at (602) 393-2521.

Very trul yours, J. G. Hay es Vice President Nuclear Production JGH/TDS/JEH/kj Attachment cc: 0. H. Def1ichele (all w/a)

E. E. Van Brunt, Jr.

J. B. Har tin T. J. Polich E. A. Licitra A. C. Gehr INPO Records Center 8804190029 8804i2 PDR ADOCK 05000528 DCD,.

PALO VERDE NUCLEAR GENERATING STATION LOOSE-PART DETECTION INSTRUHENTATION License No. NPF-41 Docket No. 50-528 Special Report No. 1-SR-88-004 This Special Report is being submitted pursuant to Technical Specification 3.3.3.7 ACTION "a" and Technical Specification 6.9.2'addressing the loose-part detection instrumentation being inoperable for more than 30 days. The 30 day period for returning the system to an operable status was exceeded at approximately 0010 HST on April 7, 1988.

Palo Verde Unit 1 entered Hode 2 (STARTUP) at approximately 0010 HST on Harch 8, 1988 upon completion of its first refueling outage. The inoperable portion

'of the loose-part detection instrumentation is in the circuitry associated with instrument number JSVNYE-2, which is located on the upper reactor vessel head. The inoperable status is caused by a break-up of the signal coming from the sensor.

The sensor and the hardline cable had been replaced as discussed in letter ANPP-36011-EEVB/KLH-98.05, E. E. Van Brunt, Jr. to Director of Nuclear Reactor Regulation, dated April 9, 1986. Surveillance Test 36ST-9SV02 (Vibration and Loose Parts Honitoring System Calibration Test) was performed satisfactorily on loose-part detection instrumentation in January, 1988. The reactor vessel head was removed for inspection and maintenance and reinstalled in February, 1988. On triarch 4, 1988 the loose-part detection instrumentation channel 2 problem was identified and is believed to be. either the sensor or the cable although an exact root cause has not been determined.

An authorized work control document has been prepared and will be scheduled for the next outage of sufficient duration.