{{#Wiki_filter:AVERAGE DAILYUNIT POWER LEVEL
                                                                          "
DOCKET NO.
UNIT NAME DATE          QL1295 COMPLETED BY  ~MQQ RIES!JQu MONTH: July 1996 DAY        AVERAGE DAILYPOWER LEVEL          DAY    AVERAGE DAILYPOWER LEVEL 1223                    17              1226 1215                    18              1227 1220                    19              1224 1154                    20              1224 1218                    21              1223 1218                    22              1221 1220                    23              1223 1218                    24              1220 1221                    25              1216 10                    1217                    26              1221 1217                    27              1221 12  ,                1220                    28              1222 13                    1224                    29              1222 14                    1219                    30              1220 15                    1222                    31              1221 16                    1222
 
REFUELING INFORMATION DOCKET NO.
UNIT NAME DATE                QLQLK COMPLETED BY        ~gg~
Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled to begin on 09/21/96.
Scheduled date for restart following refueling.
11/04/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No Scheduled date for submitting proposed licensing action and supporting information.
5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity. ~lit Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
 
M t
 
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH t
DOCKET NO. SLQZG UNIT NAME    LVHG.R1 DATE        QLQL96 COMPLETED BY ~USQUE 07/01 0000 Unit began the month in Mode 1 at 100% power..
07/04 0206 Commenced RX power decrease to 85% for MT CV¹4 card replacement.
07/04 0335 RX power stabilized at 88%.
07/04 1500 RX power at 100%.
07/31 2359 Unit ended the month in Mode 1 at 100% power.
 
SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME DATE
                                                                                                                                          ~g(~
QQ355 COMPLETED BY          JJ2JAtQQ Outage                    Method of Duration                Shutting Down                        System Component      Cause and Corrective Action Date      Type"      Hours      Reason2        Reactor3            LER No.        Code4  Code5        to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.
1F Forced              Reason:                                    3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled            A-Equipment Failure(Explain)                1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                      2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 License              5-Reduction of 20% or Greater in the    5Exhibit H-Same Source Examination                                Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain)
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SL522 UNIT NAME      j'EKiR2 DATE          QLQLK COMPLETED BY  ~~~lHQQ IHRUHJBZ MONTH: July 1996 DAY        AVERAGE DAILYPOWER LEVEL        DAY      AVERAGE DAILYPOWER LEVEL 1250                      17              1255 1250                      18              1256 1249                      19              1256 1249                      20              1254 1249                      21              1254 1248                      22              1254 1250                      23              1254 1249                      24              1252 1250                      25              1243 10                  1250                    - 26              1252 1250                      27              1248 12                  1252                      28              1251 13                  1248                      29              1251 14                  1245                    30              1250 15                  1249                    31              1251 16                  1251
 
REFUELING INFORMATION DOCKET NO.
UNIT NAME        /VVI~
DATE              QL13LK COMPLETED BY Scheduled date for next refueling shutdown.
The 7th refueling outage is scheduled for 09/20/97.
Scheduled date for restart following refueling.
11/09/97.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Scheduled date for submitting proposed licensing action and supporting information.
N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
N/A a) tn the core. ~
The number of fuel assemblies.
b) In the spent fuel storage pool. ~~
Licensed spent fuel storage capacity.      '929 Intended change in spent fuel storage capacity.  ~~      I            II Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
 
t                                t
 
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 5¹529 UNIT NAME    EZHG.M DATE        BLQLK COMPLETED BY ~~QQ RIUSRJRZ July  lBK 07/01      0000 Unit began the month in Mode 1 at 100% RX power.
07/31    '2359 Unit ended the month in Mode 1 at 100% RX power.
 
SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME              /VV(~
DATE                  EiZK COMPLETED BY          ~)~gg~
Outage                    Method of Duration                Shutting Down                        System Component      Cause and Corrective Action No.          Date        Type"      Hours      Reason2        Reactor3            LER No.        Code4  Code5        to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.
"F-Forced              Reason:                                    3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled            A-Equipment Failure(Explain)                1-Manual                                  of the Data Entiy Sheets for Licensee B-Maintenance or Test                      2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 License              5-Reduction of 20% or Greater in the    Exhibit H-Same Source Examination                                Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain)
 
t
  ~ I
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SL539 UNIT NAME    EV'N%~~
DATE          QL13$ 6 COMPLETED BY  L9~6tQQ MONTH: July 1996 DAY        AVERAGE DAILYPOWER LEVEL          DAY    AVERAGE DAILYPOWER LEVEL 1249                    17                1255 2                  1249                    18                1257 1251                    19                1256 1251                    20                1248 1251                    21                1247 1243                    22                1252 1242                    23                1252 1247                    24                1244 1250                    25                1247 10                  1251                    26                1247 1250                    27                1247 12                  1251                    28                1245 13                  1246                    29              "1250 14                  1241                    30                1250 15                  1251                    31                1250 16                  1252
 
REFUELING INFORMATION DOCKET NO.
UNIT NAME            EEKBM DATE                QLQLK COMPLETED BY        >LE)MUHQQ ERLBIJKI Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled for 2/22/97.
Scheduled date for restart following refueling.
4/13/97.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment7 None.
Scheduled date for submitting proposed licensing action and supporting information.
None.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
Intended change in spent fuel storage capacity.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
 
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 59-'539 UNIT NAME DATE        QLQLK COMPLETED BY 07/01 0000 Unit began the month in Mode 1 at 100% RX power.
07/31 2359 Unit ended the month in Mode 1 at 100%'RX power.
 
SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO              ~5-  +
UNIT NAME              PVNi~
DATE                  ~6/ 3/96 COMPLETED BY          ~JD Ful o Outage                    Method of Duration                Shutting Down                        System Component      Cause and Corrective Action No.          Date      Type"      Hours      Reason2        Reactor3            LER No.        Code4  Code5        to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.
1F-Forced              Reason:                                    3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled            A-Equipment Failure(Explain)                1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                      2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 License              5-Reduction of 20% or Greater in the    Exhibit H-Same Source Examination                                  Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain)
                                                                                }}

Revision as of 08:52, 29 October 2019

Monthly Operating Repts for July 1996 for Pvngs,Units 1,2 & 3
ML17312A918
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/31/1996
From: Fulton J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17312A917 List:
References
NUDOCS 9608200095
Download: ML17312A918 (22)


Text

AVERAGE DAILYUNIT POWER LEVEL

"

DOCKET NO.

UNIT NAME DATE QL1295 COMPLETED BY ~MQQ RIES!JQu MONTH: July 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1223 17 1226 1215 18 1227 1220 19 1224 1154 20 1224 1218 21 1223 1218 22 1221 1220 23 1223 1218 24 1220 1221 25 1216 10 1217 26 1221 1217 27 1221 12 , 1220 28 1222 13 1224 29 1222 14 1219 30 1220 15 1222 31 1221 16 1222

REFUELING INFORMATION DOCKET NO.

UNIT NAME DATE QLQLK COMPLETED BY ~gg~

Scheduled date for next refueling shutdown.

The 6th refueling outage is scheduled to begin on 09/21/96.

Scheduled date for restart following refueling.

11/04/96.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No Scheduled date for submitting proposed licensing action and supporting information.

5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

None.

The number of fuel assemblies b) In the spent fuel storage pool.

Licensed spent fuel storage capacity.

Intended change in spent fuel storage capacity. ~lit Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

M t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH t

DOCKET NO. SLQZG UNIT NAME LVHG.R1 DATE QLQL96 COMPLETED BY ~USQUE 07/01 0000 Unit began the month in Mode 1 at 100% power..

07/04 0206 Commenced RX power decrease to 85% for MT CV¹4 card replacement.

07/04 0335 RX power stabilized at 88%.

07/04 1500 RX power at 100%.

07/31 2359 Unit ended the month in Mode 1 at 100% power.

SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME DATE

~g(~

QQ355 COMPLETED BY JJ2JAtQQ Outage Method of Duration Shutting Down System Component Cause and Corrective Action Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.

1F Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the 5Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SL522 UNIT NAME j'EKiR2 DATE QLQLK COMPLETED BY ~~~lHQQ IHRUHJBZ MONTH: July 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1250 17 1255 1250 18 1256 1249 19 1256 1249 20 1254 1249 21 1254 1248 22 1254 1250 23 1254 1249 24 1252 1250 25 1243 10 1250 - 26 1252 1250 27 1248 12 1252 28 1251 13 1248 29 1251 14 1245 30 1250 15 1249 31 1251 16 1251

REFUELING INFORMATION DOCKET NO.

UNIT NAME /VVI~

DATE QL13LK COMPLETED BY Scheduled date for next refueling shutdown.

The 7th refueling outage is scheduled for 09/20/97.

Scheduled date for restart following refueling.

11/09/97.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Scheduled date for submitting proposed licensing action and supporting information.

N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

N/A a) tn the core. ~

The number of fuel assemblies.

b) In the spent fuel storage pool. ~~

Licensed spent fuel storage capacity. '929 Intended change in spent fuel storage capacity. ~~ I II Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

t t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 5¹529 UNIT NAME EZHG.M DATE BLQLK COMPLETED BY ~~QQ RIUSRJRZ July lBK 07/01 0000 Unit began the month in Mode 1 at 100% RX power.

07/31 '2359 Unit ended the month in Mode 1 at 100% RX power.

SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME /VV(~

DATE EiZK COMPLETED BY ~)~gg~

Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.

"F-Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entiy Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)

t

~ I

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SL539 UNIT NAME EV'N%~~

DATE QL13$ 6 COMPLETED BY L9~6tQQ MONTH: July 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1249 17 1255 2 1249 18 1257 1251 19 1256 1251 20 1248 1251 21 1247 1243 22 1252 1242 23 1252 1247 24 1244 1250 25 1247 10 1251 26 1247 1250 27 1247 12 1251 28 1245 13 1246 29 "1250 14 1241 30 1250 15 1251 31 1250 16 1252

REFUELING INFORMATION DOCKET NO.

UNIT NAME EEKBM DATE QLQLK COMPLETED BY >LE)MUHQQ ERLBIJKI Scheduled date for next refueling shutdown.

The 6th refueling outage is scheduled for 2/22/97.

Scheduled date for restart following refueling.

4/13/97.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment7 None.

Scheduled date for submitting proposed licensing action and supporting information.

None.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

None.

The number of fuel assemblies.

b) In the spent fuel storage pool.

Intended change in spent fuel storage capacity.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 59-'539 UNIT NAME DATE QLQLK COMPLETED BY 07/01 0000 Unit began the month in Mode 1 at 100% RX power.

07/31 2359 Unit ended the month in Mode 1 at 100%'RX power.

SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO ~5- +

UNIT NAME PVNi~

DATE ~6/ 3/96 COMPLETED BY ~JD Ful o Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.

1F-Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)