{{#Wiki_filter:ACCELERATED D TRIBUTION DEMONS TION SYSTEM'a...r'r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9103180102 DOC.DATE: 91/02/28 NOTARIZED:
{{#Wiki_filter:ACCELERATED D TRIBUTION DEMONS                                                       TION SYSTEM
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME, AUTHOR AFFXLXATION HALE,M.Carolina Power 6 Light Co.RICHEY,R.B.
                                                                                                        'a...r
.Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET'g 05000400 R  
        'r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9103180102               DOC.DATE:   91/02/28   NOTARIZED: NO                     DOCKET'g FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                                 05000400 AUTH. NAME           , AUTHOR AFFXLXATION HALE,M.                 Carolina Power     6   Light Co.
RICHEY,R.B.         . Carolina Power     6   Light Co.
RECIP.NAME               RECIPIENT AFFILIATION                                                                 R


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Feb 1991 for Harris Nuclear Power Plant Unit 1.W/910312 ltr.DXSTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs'NOTES:Application for permit renewal filed.o5ooo4oo/RECIPXENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/DLPQ/~LPEB10 R G&I-LE 1 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1, 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept           for Feb   1991   for Harris Nuclear               Power Plant Unit 1.W/910312           ltr.                                                             '
A D D PLEASE HELP US TO REDUCE WASI E!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION'IPID FOR DOCUMENTS YOU DON T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 Carolina Power&Light Company P.O.Box 165~New Hill~N.C.27562 R.B.RICHEY Vice President Harris Nuclear Project MAR.1 2 1991 File Number'SHF/10-15505 Letter Number: HO-913008 (0)Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.1 DOCKET NO.50-400 LICENSE NO.NPF-63 MONTHLY OPERATIONS REPORT
DXSTRIBUTION CODE         IE24D     COPIES RECEIVED:LTR         ENCL                   SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed.                                                       o5ooo4oo     /
RECIPXENT               COPIES            RECIPIENT                      COPIES ID CODE/NAME             LTTR ENCL        ID  CODE/NAME                    LTTR ENCL              D PD2-1 LA                     3      3      PD2-1 PD                            1    1 BECKER,D                      1      1                                                                D INTERNAL: ACRS                           10    10      AEOD/DOA                            1    1 AEOD/DSP/TPAB                 1      1      NRR/DLPQ/~LPEB10                    1     1, NRR/DOEA/OEAB                1      1      R G &I-LE                     1   1     1 RGN2                          1     1 EXTERNAL: EG&G BRYCE,J.H                  1     1     NRC PDR                            1     1 NSIC                          1     1 D
A D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASI E! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM   DISTRIBUTION'IPID FOR DOCUMENTS YOU DON T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR                 24   ENCL     24


==Dear Sirs:==
Carolina Power & Light Company P. O. Box 165 ~ New Hill N. C. 27562
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.1, Carolina Power&Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1991.Yours very truly, 1 R.B.Richey Vice President Harris Nuclear Project MWH:svm Enclosure cc.'Mr.S.D.Ebneter (NRC-RII)Mr.R.G.Oehl (DOE)Mr.J.E.Tedrow (NRC-SHNPP)
                                                                ~
MEM/DATAREPa/1/OS4 9i03130l02 910228 PDR ADOCK 05000400 PDR 1 p IL DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: February 1991 COMPLETED BY: Mark Hale OPERATIONS
R. B. RICHEY Vice President Harris Nuclear Project MAR. 1  2 1991 File Number'SHF/10-15505 Letter Number: HO-913008 (0)
Document        Control Desk United States Nuclear Regulatory Commission Washington,        DC  20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.                          1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
 
==Dear       Sirs:==
 
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1991.
Yours very           truly, 1 R. B. Richey Vice President Harris Nuclear Project MWH:svm Enclosure cc. 'Mr.       S. D. Ebneter (NRC-RII)
Mr. R. G. Oehl (DOE)
Mr. J. E. Tedrow (NRC-SHNPP)
MEM/DATAREPa/1/OS4 9i03130l02 910228 PDR       ADOCK       05000400 PDR
 
1 p
IL
 
DOCKET NO.:       050-400 UNIT:       Harris Unit 1 DATE:       February 1991 COMPLETED BY:   Mark Hale OPERATIONS  


==SUMMARY==
==SUMMARY==
Harris Unit 1 operated at a 100.00 percent Availability Factor for the referenced month and a 97.44 percent Capacity Factor.There were two events.Details are provided on the Unit Shutdowns and Power Reduction Sheets.There are 157 fuel assemblies in the reactor vessel and 438 spent fuel assemblies in the Spent Fuel Pools.306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.Twenty eight of the spent fuel assemblies in the Spent Fuel Pools are from CPSL's Robinson Plant.In addition to the spent fuel, 60 new fuel assemblies were received from Westinghouse.
 
MEM/DATAREPa/1/OS4 CnL CO'UH DATE 03/07/91 RUH TIME 14: 28: 00 PLANT PERFORMAHCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE RPD36-000 OPERATIHG STATUS DOCI(ET HO.650"408 COMPLETED BY MARK W.HALE TELEPHONE<919)362-2944 UHIT HANE: HARRIS UHIT I NOTES 2.REPORTING PERIOD: FEBRUARY 91 I See operations 3.LICEHBED THERMAL POWER (MWT): 2775 I NAMEPLATE RATING (GROSS MWF): 958.9 I 5.DESIGN ELECTRICAL RATING<HET MWE): 980.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.8 7.NAX DEPENDABLE CAPAclTY (HET MWE): 860.8 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TI.IRU 7)SINCE GIVE REASONS: N/A I summary.I I I I I LAST REPORT, 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET NWE): None.10.REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUNUL ATIVE<<.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR OH LINE 15.UHIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEH.(MWH)17.GROSS ELEC.ENERGY GEN.(MWH)18.NET ELEC.ENERGY GEHERATED (MWH)19.UNlT SERVICE FACTOR 20.UNIT AVAILABII ITY FACTOR 21.UNIT CAP.FACTOR<USING NDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONT Refueling Outage, March 16th, 672.00 1416.00 672.80 1416.00.08.00 672.80 1416.00.08.00 1782562.32 3832583.58 600933.80 1292501.00 563<<6.68 12<<696.86 180.88 108.06 100.08 160.66 97.44 99.50 93.11 95.88.88.00 HS (TYPE, DATE, AHD DURATION 1991 9 weeks.33577.08 27262.09.66 26888.35.08 78887827.88 23544435.00 21888866.80 88.08'80.68 75.80 72.43 4.43 OF EACH): 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Harris Unit     1 operated at a 100.00 percent Availability Factor for the referenced month and a 97.44 percent Capacity Factor.           There were two events. Details are provided on the Unit Shutdowns and Power Reduction Sheets.
FORECAST ACHIEVED INITlAL CRITICALITY INITIAL ELEC TRICITY COMMERCIAL OPERATIOH MEM/DATREPa/2/OS4 1.16-9 I I CPhL CO RUN DATE RUN TINE 03/07/93 34:27:58 PLANT PERFORMANCE DATA SYSTEH APPENDIX B-AVERAGE DAILY POWER LEVEL HARRIS UNIT 3 PAGE RPD39-000 FEBRUARY 199'3 DAY AVG.DAILY POWER I EVEL (MWE-NET)DOCKET NO.050-400 CONPLETED BY HARK W.HALE TELEPHONE (919)362-2944 DAY AVG.DAILY POWER LEVEL (HWE-NET)882 SSO 823 17 29 874 872 873 873$0 851 804 859 875 875 877 877 MEM/DATREPa/3/OS4 a'
There are   157 fuel assemblies   in the reactor vessel and 438 spent fuel assemblies in the Spent Fuel Pools. 306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant. Twenty eight of the spent fuel assemblies in the Spent Fuel Pools are from CPSL's Robinson Plant.
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: February 1991 UNIT NAME: Harris DATE: 3/7/91 COMPLETED BY: M.W.Hale TELEPHONE:
In addition to the spent fuel, 60 new fuel assemblies were received from Westinghouse.
(919)362"2944 No.Date TI y P e Duration (Hours)R Method of Shutting Down Reactor Licensee Event Report f System Code 4 Component Code 5 Cause 8, Corrective Action to Prevent Recurrence 91-002 910203 0.0 HA VALVE Reduced unit power to 70$to perform turbine valve testing.Unit was returned to 100$power on 2-3-91.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source MEM/DATAREPa/4/OS4 UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: February 1991 UNIT NAME: Harris DATE: 3/7/91 COMPLETED BY: M.W.Hale TELEPHONE:
MEM/DATAREPa/1/OS4
(919)362-2944 No.Date Tl y p e Duration (Hours)Method of Shutting Down Reactor Licensee Event Report f System Code 4 Component Code 5 Cause 4 Corrective Action to Prevent Recurrence 91-003 910224 0.0 N/A HC PIPE Reduced unit power to"305 power due to a tube leak in the west side of the condenser.
 
One leaking tube was plugged.Eight additional tubes in adjacent areas were plugged to prevent future problems.Unit was returned to full load on 2-26-91.1 F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source MEM/DATAREPa/5/OS4}}
CnL                           PLANT PERFORMAHCE DATA SYSTEM                      PAGE RPD36-000 CO'UH DATE     03/07/91             OPERATING DATA REPORT RUH TIME 14: 28: 00                   HARRIS UNIT   1 DOCI(ET HO. 650"408 COMPLETED BY MARK W. HALE OPERATIHG STATUS                                          TELEPHONE     <919)362-2944 UHIT HANE:       HARRIS UHIT                       I NOTES                             I
: 2. REPORTING PERIOD: FEBRUARY 91                       I See operations summary.            I
: 3. LICEHBED THERMAL POWER (MWT): 2775                 I                                    I NAMEPLATE RATING (GROSS MWF): 958.9                 I                                    I
: 5. DESIGN ELECTRICAL RATING <HET MWE): 980.0                                               I
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.8                                               I
: 7. NAX DEPENDABLE CAPAclTY (HET MWE): 860.8
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TI.IRU 7) SINCE LAST REPORT, GIVE REASONS: N/A
: 9. POWER LEVEL TO WHICH RESTRICTED       IF ANY (NET NWE):   None.
: 10. REASONS FOR RESTRICTION IF ANY:       N/A THIS           YR TO         CUNUL MONTH            DATE         ATIVE
<<. HOURS IN REPORTING PERIOD                     672.00          1416.00        33577.08
: 12. NUMBER OF HOURS REACTOR CRITICAL               672.80          1416.00        27262.09
: 13. REACTOR RESERVE SHUTDOWN HRS                       .08              .00            .66
: 14. HOURS GENERATOR OH LINE                       672.80          1416.00        26888.35
: 15. UHIT RESERVE SHUTDOWN HOURS                       .08              .00            .08
: 16. GROSS THERMAL ENERGY GEH. (MWH)           1782562.32      3832583.58    78887827.88
: 17. GROSS ELEC. ENERGY GEN. (MWH)               600933.80        1292501.00    23544435.00
: 18. NET ELEC. ENERGY GEHERATED (MWH)           563<<6.68        12<<696.86    21888866.80
: 19. UNlT SERVICE FACTOR                           180.88            108.06            88.08
: 20. UNIT AVAILABIIITY FACTOR                       100.08            160.66          '80. 68
: 21. UNIT CAP. FACTOR <USING NDC NET)               97.44            99.50            75.80
: 22. UNIT CAP. FACTOR (USING DER NET)               93.11            95.88            72.43
: 23. UNIT FORCED OUTAGE RATE                           .88              .00            4.43
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS        (TYPE, DATE,   AHD DURATION OF    EACH):
Refueling Outage,  March 16th,  1991     9 weeks.
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITlAL CRITICALITY INITIAL ELEC TRICITY COMMERCIAL OPERATIOH 1.16  9 MEM/DATREPa/2/OS4
 
I I
 
CPhL CO                     PLANT PERFORMANCE DATA SYSTEH                PAGE RUN DATE 03/07/93     APPENDIX B AVERAGE DAILY POWER LEVEL           RPD39-000 RUN TINE  34:27:58                HARRIS UNIT 3 DOCKET NO. 050-400 CONPLETED BY HARK W. HALE TELEPHONE (919)362-2944 FEBRUARY        199'3 DAY   AVG. DAILY POWER  I EVEL      DAY  AVG. DAILY POWER LEVEL (MWE-NET)                            (HWE-NET) 882                   17            874 SSO                                   872 823 29 873 873
$ 0                                                   859 875 851                                  875 804 877 877 MEM/DATREPa/3/OS4
 
a '
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:       Harris DATE:           3/7/91 COMPLETED BY:   M. W. Hale TELEPHONE:       (919) 362"2944 REPORT MONTH:  February 1991 TI                      R      Method No.         Date       y       Duration                of        Licensee      System Component          Cause  8, Corrective P         (Hours)             Shutting     Event       Code 4 Code 5                   Action to e                                Down      Report  f                                Prevent Recurrence Reactor Reduced  unit  power  to 70$  to 91-002         910203                 0.0                                             HA     VALVE   perform turbine valve testing. Unit was returned to 100$ power on 2-3-91.
I                       2                                                3                            4 F: Forced               Reason:                                          Method:                      Exhibit G-Instructions S: Scheduled             A-Equipment Failure (Explain)                     I-Manual                      for Preparation of Data B-Maintenance or Test                             2-Manual Scram                Entry Sheets for Licensee C-Refueling                                       3-Automatic Scram            Event Report (LER) File D-Regulatory Restriction                         4-Continued                    (NUREG-0161)
E-Operator Training 8, License Examination       5-Reduced Load F-Administrative                                  6-Other                       5 G-Operational Error (Explain)                                                   Exhibit I - Same Source MEM/DATAREPa/4/OS4
 
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:       Harris DATE:             3/7/91 COMPLETED BY:     M. W. Hale TELEPHONE:       (919) 362-2944 REPORT MONTH:  February  1991 Tl                            Method No.         Date       y       Duration                of      Licensee      System  Component            Cause 4  Corrective p         (Hours)             Shutting     Event         Code 4   Code 5                   Action to e                              Down      Report  f                                  Prevent Recurrence Reactor Reduced  unit  power  to "305 power due to 91-003       910224                 0.0                               N/A           HC     PIPE   a tube leak in the west side of the condenser. One leaking tube was plugged. Eight additional tubes in adjacent areas were plugged to prevent future problems. Unit was returned to full load on 2-26-91.
1                     2                                                    3                          4 F:   Forced             Reason:                                            Method:                      Exhibit G-Instructions S:   Scheduled         A-Equipment Failure (Explain)                       I-Manual                    for Preparation of Data B-Maintenance or Test                               2-Manual Scram              Entry Sheets for Licensee C-Refueling                                         3-Automatic Scram          Event Report (LER) File D-Regulatory Restriction                             4-Continued                  (NUREG-0161)
E-Operator Training 8, License Examination           5-Reduced Load F-Administrative                                     6-Other                      5 G-Operational Error (Explain)                                                     Exhibit  I -  Same  Source H-Other (Explain)
MEM/DATAREPa/5/OS4}}

Revision as of 05:34, 22 October 2019

Monthly Operating Rept for Feb 1991 for Harris Nuclear Power Plant Unit 1.W/910312 Ltr
ML18009A838
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/28/1991
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-913008-(), HO-913008-(0), NUDOCS 9103180102
Download: ML18009A838 (10)


Text

ACCELERATED D TRIBUTION DEMONS TION SYSTEM

'a...r

'r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9103180102 DOC.DATE: 91/02/28 NOTARIZED: NO DOCKET'g FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME , AUTHOR AFFXLXATION HALE,M. Carolina Power 6 Light Co.

RICHEY,R.B. . Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Feb 1991 for Harris Nuclear Power Plant Unit 1.W/910312 ltr. '

DXSTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed. o5ooo4oo /

RECIPXENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-1 LA 3 3 PD2-1 PD 1 1 BECKER,D 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ/~LPEB10 1 1, NRR/DOEA/OEAB 1 1 R G &I-LE 1 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASI E! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION'IPID FOR DOCUMENTS YOU DON T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

Carolina Power & Light Company P. O. Box 165 ~ New Hill N. C. 27562

~

R. B. RICHEY Vice President Harris Nuclear Project MAR. 1 2 1991 File Number'SHF/10-15505 Letter Number: HO-913008 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1991.

Yours very truly, 1 R. B. Richey Vice President Harris Nuclear Project MWH:svm Enclosure cc. 'Mr. S. D. Ebneter (NRC-RII)

Mr. R. G. Oehl (DOE)

Mr. J. E. Tedrow (NRC-SHNPP)

MEM/DATAREPa/1/OS4 9i03130l02 910228 PDR ADOCK 05000400 PDR

1 p

IL

DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: February 1991 COMPLETED BY: Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 100.00 percent Availability Factor for the referenced month and a 97.44 percent Capacity Factor. There were two events. Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel and 438 spent fuel assemblies in the Spent Fuel Pools. 306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant. Twenty eight of the spent fuel assemblies in the Spent Fuel Pools are from CPSL's Robinson Plant.

In addition to the spent fuel, 60 new fuel assemblies were received from Westinghouse.

MEM/DATAREPa/1/OS4

CnL PLANT PERFORMAHCE DATA SYSTEM PAGE RPD36-000 CO'UH DATE 03/07/91 OPERATING DATA REPORT RUH TIME 14: 28: 00 HARRIS UNIT 1 DOCI(ET HO. 650"408 COMPLETED BY MARK W. HALE OPERATIHG STATUS TELEPHONE <919)362-2944 UHIT HANE: HARRIS UHIT I NOTES I

2. REPORTING PERIOD: FEBRUARY 91 I See operations summary. I
3. LICEHBED THERMAL POWER (MWT): 2775 I I NAMEPLATE RATING (GROSS MWF): 958.9 I I
5. DESIGN ELECTRICAL RATING <HET MWE): 980.0 I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.8 I
7. NAX DEPENDABLE CAPAclTY (HET MWE): 860.8
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TI.IRU 7) SINCE LAST REPORT, GIVE REASONS: N/A
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET NWE): None.
10. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUNUL MONTH DATE ATIVE

<<. HOURS IN REPORTING PERIOD 672.00 1416.00 33577.08

12. NUMBER OF HOURS REACTOR CRITICAL 672.80 1416.00 27262.09
13. REACTOR RESERVE SHUTDOWN HRS .08 .00 .66
14. HOURS GENERATOR OH LINE 672.80 1416.00 26888.35
15. UHIT RESERVE SHUTDOWN HOURS .08 .00 .08
16. GROSS THERMAL ENERGY GEH. (MWH) 1782562.32 3832583.58 78887827.88
17. GROSS ELEC. ENERGY GEN. (MWH) 600933.80 1292501.00 23544435.00
18. NET ELEC. ENERGY GEHERATED (MWH) 563<<6.68 12<<696.86 21888866.80
19. UNlT SERVICE FACTOR 180.88 108.06 88.08
20. UNIT AVAILABIIITY FACTOR 100.08 160.66 '80. 68
21. UNIT CAP. FACTOR <USING NDC NET) 97.44 99.50 75.80
22. UNIT CAP. FACTOR (USING DER NET) 93.11 95.88 72.43
23. UNIT FORCED OUTAGE RATE .88 .00 4.43
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AHD DURATION OF EACH):

Refueling Outage, March 16th, 1991 9 weeks.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITlAL CRITICALITY INITIAL ELEC TRICITY COMMERCIAL OPERATIOH 1.16 9 MEM/DATREPa/2/OS4

I I

CPhL CO PLANT PERFORMANCE DATA SYSTEH PAGE RUN DATE 03/07/93 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TINE 34:27:58 HARRIS UNIT 3 DOCKET NO. 050-400 CONPLETED BY HARK W. HALE TELEPHONE (919)362-2944 FEBRUARY 199'3 DAY AVG. DAILY POWER I EVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (HWE-NET) 882 17 874 SSO 872 823 29 873 873

$ 0 859 875 851 875 804 877 877 MEM/DATREPa/3/OS4

a '

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 3/7/91 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362"2944 REPORT MONTH: February 1991 TI R Method No. Date y Duration of Licensee System Component Cause 8, Corrective P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report f Prevent Recurrence Reactor Reduced unit power to 70$ to 91-002 910203 0.0 HA VALVE perform turbine valve testing. Unit was returned to 100$ power on 2-3-91.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training 8, License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source MEM/DATAREPa/4/OS4

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 3/7/91 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: February 1991 Tl Method No. Date y Duration of Licensee System Component Cause 4 Corrective p (Hours) Shutting Event Code 4 Code 5 Action to e Down Report f Prevent Recurrence Reactor Reduced unit power to "305 power due to 91-003 910224 0.0 N/A HC PIPE a tube leak in the west side of the condenser. One leaking tube was plugged. Eight additional tubes in adjacent areas were plugged to prevent future problems. Unit was returned to full load on 2-26-91.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training 8, License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

MEM/DATAREPa/5/OS4