{{#Wiki_filter:ACCELERATED DI UTION DEMONSTIRATION SYSTEM 0 4~e<REGULATORY INFORMATION DISTRIBUTION SYSTEM'(RIDS)ACCESSION NBR:9003130376 DOC.DATE: 90/03/06, NOTARIZED:
{{#Wiki_filter:ACCELERATED DI                                                                         UTION DEMONSTIRATION SYSTEM 4~                                                                                                           0 e<
YES DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit.2, Tennessee , 05000260 50-296 Browns Ferry Nuclear Power, Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION RAY,M.J.Tennessee Valley Authority"*RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
REGULATORY INFORMATION DISTRIBUTION SYSTEM '(RIDS)
ACCESSION NBR:9003130376                                                             DOC.DATE: 90/03/06, NOTARIZED: YES           DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee                                                               05000259 50-260 Browns Ferry Nuclear Power Station, Unit.2, Tennessee                                                           , 05000260 50-296 Browns Ferry Nuclear Power, Station, Unit 3, Tennessee                                                           05000296 AUTH. NAME             AUTHOR AFFILIATION RAY,M.J.                 Tennessee Valley Authority
  "* RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Application.for amends to Licenses DPR-33,DPR-52 6 DPR-68, consisting of Tech Spec Change Recluest 276..DISTRIBUTION CODE: D030D COPIES RECEIVED:LTR Q ENCL l SIZE: TITLE: TVA Facilities
Application .for amends to Licenses DPR-33,DPR-52                                                     6   DPR-68, consisting of Tech Spec Change Recluest 276..
-Routine Correspondence NOTES:1 Copy each to: B.Wilson,D.M.Crutchfield,B.D.Liaw,S.Black R.Pierson, 1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw,'.Pierson,B.Wilson 1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, R.Pierson,B.Wilson S I 05000259'05000260 , D 05000296 D RECIPIENT.
DISTRIBUTION CODE: D030D TITLE: TVA      Facilities COPIES RECEIVED:LTR Routine Correspondence Q ENCL l SIZE:                     S I
ID CODE/NAME'LA ROSS,T.INTERNAL: ACRS OC 01 EXTERNAL: LPDR NSIC NOTES COPIES LTTR ENCL 1 1, 1 1 1 11 0 1 1.1 1 1 1 5 5 RECIPIENT ID CODE/NAME PD NUDOCS-ABSTRACT OGC/HDS2 NRC PDR COPIES LTTR ENCL 1-1~1, 1 1, 0 1 1 R NOTE TO ALL"RIDS" RECIPIENIS:
NOTES:1 Copy each         to: B.Wilson,D.M.Crutchfield,B.D.Liaw,S.Black                                                         05000259' R.Pierson, 1 Copy each     to:                                                                                                   05000260 D
A D D PLEASE HELP US TO REDUCE WAPIZl CONTACT THE.DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM,DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR'6 ENCL,.14 c r~~P~a<<.<y I.P r I a I 4 J' TENNESSEE VALLEY AUTHORITY CHATTANOOGA.
S.Black,D.M.Crutchfield,B.D.Liaw,'.Pierson,B.Wilson
TENNESSEE 37401 5N 1578 Lookout Place MAR 66 1680 TVA-BFN-TS-276 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.20555 Gentlemen:
                                                                                                                                              ,
In the Matter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROHNS FERRY NUCLEAR PLANT (BFN)-TVA BFN TECHNICAL SPECIFICATION NO.276-STANDBY GAS TREATMENT SYSTEM/SECONDARY CONTAINMENT SYSTEM In accordance with the provisions of 10 CFR 50.4 and 50.90, we are submitting a request for an amendment to licenses DPR-33, DPR-52, and DPR-68 to change the BFN Technical Specifications (TS)for Units 1, 2, and 3 (Enclosure 1).This proposed amendment will: (.1)delete the remaining portion of temporary amendments 151, 147, and 122 for BFN Units 1, 2, and 3 respectively; (2)clarify the actions to be taken in Limiting Condition for Operation (LCO)3.7.B.4 (Standby Gas Treatment System)and revise the bases accordingly; (3)revise the requirements of LCO 3.7.C.2 (Secondary Containment);
1 Copy     each   to: S. Black,D.M.Crutchfield,B.D.Liaw,                                                                 05000296 R.Pierson,B.Wilson                                                                                                                   D RECIPIENT.                                                         COPIES          RECIPIENT        COPIES ID  CODE/NAME                                                        LTTR ENCL      ID CODE/NAME   LTTR ENCL
and (4)add a clarifying statement to LCO 3.7.C.4.b (Secondary Containment)
            'LA                                                                         1    1,  PD                  1  -
~Description, reason for change, and justification in support of the proposed changes are provided in Enclosure 2.A proposed determination of no significant hazards consideration is provided in Enclosure 3.This TS change will give BFN the flexibility under certain circumstances to make the secondary containment and standby gas treatment systems and their associated support systems inoperable.
1 ~
This will enable us to complete the required Unit 2 outage modifications approximately four weeks sooner than under the current TS requirements.
ROSS,T.                                                                   1    1 INTERNAL: ACRS OC 01 1
He therefore request your exigent review and approval of the enclosed changes as well as a temporary waiver from compliance with LCO 3.7.C.2.d until this TS change is approved.He request that these specifications be made effective upon receipt of the changes.0~1)9003i30376 900306)DR ADocK 05000259 lj A<Eqmt owwtmitv Emv~>vw~nr C&#xc3;U~>b 8AQ U.S.Nuclear Regulatory Commission MAR 06 lggP If there are any questions, please telephone Patrick P.Carier at (205)729-3570.Very truly yours, TENNESSEE VALLEY AUTHORITY Licensing Project Management Subscribgd~nd sworn o before me on th'sg~day o a 1990 Notary Public My Commission Expires Enclosures cc: See page 3  
1 1
~0 9 Hl"i.~V'C 1'(J'~'C 4 tp Mh ah U.S.Nuclear Regulatory Commission MAR 66 doggo cc (Enclosures):
1 0
Ms.S.C.Black, Assistant Director for Projects TVA Projects Division U.S.Nuclear Regulatory Commission One Nhite Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr.Charles R.Christopher, Chairman Limestone County Commission P.O.Box 188 Athens, Alabama 35611 Dr.C.E.Fox State Health Officer State Department of Public Health State Office Building Montgomery, Alabama.36194 Mr.J.E.Jones General Electric Company No.1 Union Square 808 Krystal Building Chattanooga, Tennessee 37402 Mr.B.A.Hilson, Assistant Director for Inspection Programs TVA Projects Division U.S.Nuclear Regulatory Commission Region II 101 Marietta Street, NH, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Brogans Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 American Nuclear Insurers Attention:
1 NUDOCS-ABSTRACT OGC/HDS2             1, 1,    1 0
Librarian The Exchange, Suite 245 270 Farmington Avenue Farmington, Connecticut 06032 p p~l~Lj get,~a+>~.g~f ENCLOSURE l.PROPOSED TECHNICAL SPECIFICATION BROHNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (TVA BFN TS 276)}}
EXTERNAL: LPDR                                                                          .1   1   NRC PDR              1     1 NSIC                                                                      1   1 NOTES                                                                                    5    5                                              R A
D D
NOTE TO ALL "RIDS" RECIPIENIS:
PLEASE HELP US TO REDUCE WAPIZl CONTACT THE.DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM,DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR                                                           '6   ENCL,. 14
 
c           r
                                  ~ ~
P ~
a
    <<.<       P   r a I y    I         4 I.
J'
 
TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 1578 Lookout Place MAR   66 1680 TVA-BFN-TS-276 U.S. Nuclear Regulatory Commission ATTN:   Document Control Desk Hashington, D.C. 20555 Gentlemen:
In the Matter of                                               Docket Nos. 50-259 Tennessee  Valley Authority                                                50-260 50-296 BROHNS FERRY NUCLEAR PLANT (BFN) TVA BFN TECHNICAL SPECIFICATION NO. 276 STANDBY GAS TREATMENT SYSTEM/SECONDARY CONTAINMENT SYSTEM In accordance with the provisions of 10 CFR 50.4 and 50.90, we are submitting a request for an amendment to licenses DPR-33, DPR-52, and DPR-68 to change the BFN Technical Specifications (TS) for Units 1, 2, and 3 (Enclosure 1).
This proposed amendment will: (.1) delete the remaining portion of temporary amendments 151, 147, and 122 for BFN Units 1, 2, and 3 respectively; (2) clarify the actions to be taken in Limiting Condition for Operation (LCO) 3.7.B.4 (Standby Gas Treatment System) and revise the bases accordingly; (3) revise the requirements of LCO 3.7.C.2 (Secondary Containment); and (4) add a clarifying statement to LCO 3.7.C.4.b (Secondary Containment)   ~
Description, reason for change, and justification in support of the proposed changes are provided in Enclosure 2. A proposed determination of no significant hazards consideration is provided in Enclosure 3.
This TS change will give BFN the flexibility under certain circumstances to make the secondary containment and standby gas treatment systems and their associated support systems inoperable. This will enable us to complete the required Unit 2 outage modifications approximately four weeks sooner than under the current TS requirements.
He therefore request your exigent review and approval of the enclosed changes as well as a temporary waiver from compliance with LCO 3.7.C.2.d until this TS change is approved.     He request that these specifications be made effective upon receipt of the changes.
0~
1) 9003i30376 900306                   A< Eqmt owwtmitv Emv~>vw
)DR    ADocK 05000259        lj
                    ~nr
 
C
&#xc3;U ~>b 8AQ
 
U.S. Nuclear Regulatory Commission                           MAR   06 lggP If there   are any questions,   please telephone Patrick P. Carier at (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY Licensing Project Management on th'sg   ~
Subscribgd~nd    sworn day o o before a
me 1990 Notary Public My Commission Expires Enclosures cc: See page   3
 
                              ~0 9 Hl"i .~
V' C
            '( J'~         tp 1
                    'C 4
Mh
 
ah U.S. Nuclear Regulatory Commission           MAR 66 doggo cc (Enclosures):
Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One Nhite Flint, North 11555   Rockville Pike Rockville, Maryland     20852 Mr. Charles R. Christopher, Chairman Limestone County Commission P.O. Box 188 Athens, Alabama 35611 Dr. C. E. Fox State Health Officer State Department of Public Health State Office Building Montgomery, Alabama. 36194 Mr. J. E. Jones General Electric Company No. 1 Union Square 808 Krystal Building Chattanooga,   Tennessee   37402 Mr. B. A. Hilson,   Assistant Director for Inspection   Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NH, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Brogans Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama   35609-2000 American Nuclear Insurers Attention:   Librarian The Exchange,   Suite 245 270 Farmington Avenue Farmington, Connecticut     06032
 
p p
  ~ g
  .  ~ l~f Lj get,
        ~          ~ a+>
 
ENCLOSURE l.
PROPOSED TECHNICAL SPECIFICATION BROHNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (TVA BFN TS 276)}}

Revision as of 23:39, 21 October 2019

Application for Amends to Licenses DPR-33,DPR-52 & DPR-68, Consisting of Tech Spec Change Request 276,deleting Remaining Portion of Temporary Amends 151,147 & 122 for Units 1,2 & 3,respectively
ML18033B198
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/06/1990
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18033B199 List:
References
TVA-BFN-TS-276, NUDOCS 9003130376
Download: ML18033B198 (10)


Text

ACCELERATED DI UTION DEMONSTIRATION SYSTEM 4~ 0 e<

REGULATORY INFORMATION DISTRIBUTION SYSTEM '(RIDS)

ACCESSION NBR:9003130376 DOC.DATE: 90/03/06, NOTARIZED: YES DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit.2, Tennessee , 05000260 50-296 Browns Ferry Nuclear Power, Station, Unit 3, Tennessee 05000296 AUTH. NAME AUTHOR AFFILIATION RAY,M.J. Tennessee Valley Authority

"* RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application .for amends to Licenses DPR-33,DPR-52 6 DPR-68, consisting of Tech Spec Change Recluest 276..

DISTRIBUTION CODE: D030D TITLE: TVA Facilities COPIES RECEIVED:LTR Routine Correspondence Q ENCL l SIZE: S I

NOTES:1 Copy each to: B.Wilson,D.M.Crutchfield,B.D.Liaw,S.Black 05000259' R.Pierson, 1 Copy each to: 05000260 D

S.Black,D.M.Crutchfield,B.D.Liaw,'.Pierson,B.Wilson

,

1 Copy each to: S. Black,D.M.Crutchfield,B.D.Liaw, 05000296 R.Pierson,B.Wilson D RECIPIENT. COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL

'LA 1 1, PD 1 -

1 ~

ROSS,T. 1 1 INTERNAL: ACRS OC 01 1

1 1

1 0

1 NUDOCS-ABSTRACT OGC/HDS2 1, 1, 1 0

EXTERNAL: LPDR .1 1 NRC PDR 1 1 NSIC 1 1 NOTES 5 5 R A

D D

NOTE TO ALL "RIDS" RECIPIENIS:

PLEASE HELP US TO REDUCE WAPIZl CONTACT THE.DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM,DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR '6 ENCL,. 14

c r

~ ~

P ~

a

<<.< P r a I y I 4 I.

J'

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 1578 Lookout Place MAR 66 1680 TVA-BFN-TS-276 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C. 20555 Gentlemen:

In the Matter of Docket Nos. 50-259 Tennessee Valley Authority 50-260 50-296 BROHNS FERRY NUCLEAR PLANT (BFN) TVA BFN TECHNICAL SPECIFICATION NO. 276 STANDBY GAS TREATMENT SYSTEM/SECONDARY CONTAINMENT SYSTEM In accordance with the provisions of 10 CFR 50.4 and 50.90, we are submitting a request for an amendment to licenses DPR-33, DPR-52, and DPR-68 to change the BFN Technical Specifications (TS) for Units 1, 2, and 3 (Enclosure 1).

This proposed amendment will: (.1) delete the remaining portion of temporary amendments 151, 147, and 122 for BFN Units 1, 2, and 3 respectively; (2) clarify the actions to be taken in Limiting Condition for Operation (LCO) 3.7.B.4 (Standby Gas Treatment System) and revise the bases accordingly; (3) revise the requirements of LCO 3.7.C.2 (Secondary Containment); and (4) add a clarifying statement to LCO 3.7.C.4.b (Secondary Containment) ~

Description, reason for change, and justification in support of the proposed changes are provided in Enclosure 2. A proposed determination of no significant hazards consideration is provided in Enclosure 3.

This TS change will give BFN the flexibility under certain circumstances to make the secondary containment and standby gas treatment systems and their associated support systems inoperable. This will enable us to complete the required Unit 2 outage modifications approximately four weeks sooner than under the current TS requirements.

He therefore request your exigent review and approval of the enclosed changes as well as a temporary waiver from compliance with LCO 3.7.C.2.d until this TS change is approved. He request that these specifications be made effective upon receipt of the changes.

0~

1) 9003i30376 900306 A< Eqmt owwtmitv Emv~>vw

)DR ADocK 05000259 lj

~nr

C

ÃU ~>b 8AQ

U.S. Nuclear Regulatory Commission MAR 06 lggP If there are any questions, please telephone Patrick P. Carier at (205) 729-3570.

Very truly yours, TENNESSEE VALLEY AUTHORITY Licensing Project Management on th'sg ~

Subscribgd~nd sworn day o o before a

me 1990 Notary Public My Commission Expires Enclosures cc: See page 3

~0 9 Hl"i .~

V' C

'( J'~ tp 1

'C 4

Mh

ah U.S. Nuclear Regulatory Commission MAR 66 doggo cc (Enclosures):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One Nhite Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Charles R. Christopher, Chairman Limestone County Commission P.O. Box 188 Athens, Alabama 35611 Dr. C. E. Fox State Health Officer State Department of Public Health State Office Building Montgomery, Alabama. 36194 Mr. J. E. Jones General Electric Company No. 1 Union Square 808 Krystal Building Chattanooga, Tennessee 37402 Mr. B. A. Hilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NH, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Brogans Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 American Nuclear Insurers Attention: Librarian The Exchange, Suite 245 270 Farmington Avenue Farmington, Connecticut 06032

p p

~ g

. ~ l~f Lj get,

~ ~ a+>

ENCLOSURE l.

PROPOSED TECHNICAL SPECIFICATION BROHNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (TVA BFN TS 276)