{{#Wiki_filter:* Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit JAN 1 7 1996 LR-N96011 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen: | {{#Wiki_filter:OPS~G | ||
LER 272/95-029 SALEM GENERATING STATION -UNIT 1 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 This Licensee Event Report entitled "GE SBM Control Switch Degradation" is being submitted pursuant to the requirements of the Code of Federal Regulations 10CFR50. 73 (a) (2) (v). Attachment SORC Mtg. 96-007 JEH/tcp C Distribution LER File 3.7 | *~ | ||
* Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit JAN 1 7 1996 LR-N96011 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen: | |||
LER 272/95-029 SALEM GENERATING STATION - UNIT 1 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 This Licensee Event Report entitled "GE SBM Control Switch Degradation" is being submitted pursuant to the requirements of the Code of Federal Regulations 10CFR50. 73 (a) (2) (v). | |||
Sincerely, | |||
~a~ | |||
General Manager - | |||
Salem Operations Attachment SORC Mtg. 96-007 JEH/tcp C Distribution LER File 3.7 9601230092 6g866~72 PDR ADOCK PDR s | |||
The power is in your hands. :I:. IE z. ,_ | |||
95-2168 R:J6,4 | |||
Attachment A | |||
* The following items represent commitments that Public Service Electric & Gas (PSE&G) made to the Nuclear Regulatory Commission (NR~) relative to this LER (272/95-029-00) . The commitments are as follows: | |||
: 1) All SBM switches installed in 4 KV vital busses will be replaced with switches of an improved design prior to Mode 6 entry. | |||
: 2) All SBM switches installed in 4 KV group busses will be replaced with switches of an improved design prior to Mode 2 entry. | |||
: 3) An overall review to determine whether SBM switches are used in other applications is being conducted, and any suspect switches identified will be changed out. The review portion will be completed by February 29, 1996. All switches identified under this review that are installed on a vital bus will be changed out prior to Mode 6 entry. All switches identified under this review that are installed on a group bus will be changed out prior to Mode 2 entry.}} |
Revision as of 10:04, 21 October 2019
ML18101B184 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 01/17/1996 |
From: | Warren C Public Service Enterprise Group |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML18101B185 | List: |
References | |
LR-N96011, NUDOCS 9601230092 | |
Download: ML18101B184 (2) | |
Text
OPS~G
- ~
- Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit JAN 1 7 1996 LR-N96011 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
LER 272/95-029 SALEM GENERATING STATION - UNIT 1 FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 This Licensee Event Report entitled "GE SBM Control Switch Degradation" is being submitted pursuant to the requirements of the Code of Federal Regulations 10CFR50. 73 (a) (2) (v).
Sincerely,
~a~
General Manager -
Salem Operations Attachment SORC Mtg.96-007 JEH/tcp C Distribution LER File 3.7 9601230092 6g866~72 PDR ADOCK PDR s
The power is in your hands. :I:. IE z. ,_
95-2168 R:J6,4
Attachment A
- The following items represent commitments that Public Service Electric & Gas (PSE&G) made to the Nuclear Regulatory Commission (NR~) relative to this LER (272/95-029-00) . The commitments are as follows:
- 1) All SBM switches installed in 4 KV vital busses will be replaced with switches of an improved design prior to Mode 6 entry.
- 2) All SBM switches installed in 4 KV group busses will be replaced with switches of an improved design prior to Mode 2 entry.
- 3) An overall review to determine whether SBM switches are used in other applications is being conducted, and any suspect switches identified will be changed out. The review portion will be completed by February 29, 1996. All switches identified under this review that are installed on a vital bus will be changed out prior to Mode 6 entry. All switches identified under this review that are installed on a group bus will be changed out prior to Mode 2 entry.