ML18101B273: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:PS~G - | ||
Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 | Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit March 15, 1996 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating report for the month of February is being sent to you. | ||
ti~General Manager - | |||
Salem Operations RH:vls Enclosures C Mr. Thomas T. Martin Regional Administrator USNRC, Region I | |||
' 631 Park Avenue King of Prussia, PA 19046 | |||
~- - -- ------.._, | |||
- - -96o3i 90344-960229 PDR ADOCK 05000311 R PDR The power is in your hands. | |||
95-2168 REV. 6/94 | |||
----OPERATING DATA REPORT Docket No: Date: Completed by: Robert Phillips Telephone: | AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-311 Unit Name: Salem #2 Date: 03/10/96 Completed by: Robert Phillips Telephone: 339-2735 | ||
Operating Status 1. Unit Name saiem No. 2 Notes 2. Reporting Period February 1996 3 . Licensed Thermal Power (MWt) 3411 4. Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 6. Maximum Dependable Capacity(Gross MWe) 1149 7. Maximum Dependable Capacity (Net MWe) 1106 8. If Changes Occur in Capacity Ratings (items 3 through 7) Report, Give Reason NA 9. Power Level to Which Restricted, if any (Net MWe) 10. Reasons for Restrictions, if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 20. Unit Availability Factor 21. unit capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate | *j, Month February 1996 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 15 0 31 16 0 P. 8.1-7 Rl | ||
~---- - -- - ~- | |||
OPERATING DATA REPORT Docket No: 50-311 Date: 03/10/96 Completed by: Robert Phillips Telephone: 339-2735 Operating Status | |||
: 1. Unit Name saiem No. 2 Notes | |||
: 2. Reporting Period February 1996 | |||
609-339-2735 | : 3. Licensed Thermal Power (MWt) 3411 | ||
; CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE . zzzz Refueling Schedule Exceeded 4 Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report CLER) File (NUREG-0161) 5 | : 4. Nameplate Rating (Gross MWe) 1170 | ||
: 5. Design Electrical Rating (Net MWe) 1115 | |||
The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59. | : 6. Maximum Dependable Capacity(Gross MWe) 1149 | ||
The Station Operations Review Committee has reviewed and concurs with these evaluations. | : 7. Maximum Dependable Capacity (Net MWe) 1106 | ||
: 1. Temporary Modifications (TMOD) 96-008 | : 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA | ||
The blind flanges are intended to provide the isolation function of the 2SW26 after it is removed for maintenance purposes and to provide external flood and security protection for Service Water (SW) Bay #4 during ongoing maintenance. | : 9. Power Level to Which Restricted, if any (Net MWe) N/A | ||
The modification allows the return to service of SW "Bay #2 and its associated nuclear header as well as maintain Bay #4 and its associated nuclear header available for station operational needs. The installation of a series of blind flanges in place of the 2SW26 valve does not reduce the margin of safety. (SORC 96-027) "Condenser Air Removal System Operation" Rev. 4 -This procedure revision allows outage schedule flexibility for work performed on Turbine Building Systems. This change allows Demineralized Water System hookup/alignment for temporary cooling to 23 Vacuum Pump. This is necessary for Circulating Water Pump operation to maintain an available radioactive liquid release flowpath. | : 10. Reasons for Restrictions, if any NA This Month Year to Date Cumulative | ||
There is no reduction in the margin of safety as defined in the basis for any Technical Specification. (SORC 96-017) | : 11. Hours in Reporting Period 696 1440 126073 | ||
. . REFUELING INFORMATION | : 12. No. of Hrs. Rx. was Critical 0 0 78083.6 | ||
: 13. Reactor Reserve Shutdown Hrs. 0 0 0 | |||
: 1. Refueling information has changed from last month: YES _. _. NO . X . 2. Scheduled date for next refueling: | : 14. Hours Generator On-Line 0 0 75229.5 | ||
11/02/95 Scheduled date for restart following refueling: | : 15. Unit Reserve Shutdown Hours 0 0 0 | ||
09/11/96 3. a. Will Technical Specification changes or other license amendments be required? | : 16. Gross Thermal Energy Generated (MWH) 0 0 187781005 Gross Elec. Energy Generated (MWH) 0 0 78648898 | ||
YES. | : 18. Net Elec. Energy Gen. (MWH) -2950 -6135 7473498 | ||
NOT DETERMINED TO DATE . X . b. Has the reload fuel design been reviewed by the Station Operating Review Committee? | : 19. Unit Service Factor 0 0 59.7 | ||
YES. .NO. X . If no, when is it scheduled? (to be determined) | : 20. Unit Availability Factor 0 0 59.7 | ||
: 5. Scheduled date(s) for submitting proposed licensing action: . n/a 6. Important licensing considerations associated with refueling: | : 21. unit capacity Factor (using MDC Net) 0 0 53.6 | ||
: 22. Unit Capacity Factor (using DER Net) 0 0 53.2 | |||
: 23. Unit Forced Outage Rate 100 100 25.6 | |||
: 24. Shutdowns scheduled over next 6 months (type, date and duration of each) | |||
We are presently forced beyond the scheduled refueling outage. | |||
: 25. If shutdown at end of Report Period, Estimated Date of Startup: | |||
Under review. | |||
8-l-7.R2 | |||
UNIT SHUTDOYN AND POYER REDUCTIONS REPORT MONTH February 1996 DOCKET NO. : _,5. .,0:. ,*. : :3_,_1_,_1=---- | |||
UN IT NAME: Salem #2 DATE: 03-10-96 COMPLETED BY: Robert Phillips TELEPHONE: 609-339-2735 | |||
; | |||
METHOD OF SHUTTING LICENSE DURATION COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE 1 (HOURS) REASON 2 DOYN REACTOR EVENT REPORT # | |||
SYSTEM CODE 4 CODE 5 TO PREVENT RECURRENCE . | |||
3859 02-01-96 F 696 F.C 4 ---------- zz zzzz Refueling Schedule Exceeded | |||
* 1 2 3 4 5 F: Forced Reason Method: Exhibit G - Instructions Exhibit 1 - Same S: Scheduled A-Equipment Failure (explain) 1-Manual for Preparation of Data Source B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report CLER) File D-Requlatory Restriction 4-Continuation of (NUREG-0161) | |||
E-Operator Training & License Examination Previous Outage F-Administrative 5-Load Reduction G-Operational Error (Explain) 9-0ther H-Other (Explain) | |||
10CFR50.59 EVALUATIONS DOCKET NO: 50-311 MONTH: FEBRUARY 1996 UNIT NAME: SALEM2 DATE: 03/10/96 COMPLETED BY: R.HELLER TELEPHONE: 609-339-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59. The Station Operations Review Committee has reviewed and concurs with these evaluations. | |||
: 1. Temporary Modifications (TMOD) 96-008 "Installation Of Blind Flange In Place Of The 2SW26 Isolation Valve To Turbine Generating Area Service Water" | |||
- The purpose of this temporary modification is to remove the 2SW26 valve and replace it with a blind flange assembly. The blind flanges are intended to provide the isolation function of the 2SW26 after it is removed for maintenance purposes and to provide external flood and security protection for Service Water (SW) Bay #4 during ongoing maintenance. The modification allows the return to service of SW "Bay #2 and its associated nuclear header as well as maintain Bay #4 and its associated nuclear header available for station operational needs. The installation of a series of blind flanges in place of the 2SW26 valve does not reduce the margin of safety. (SORC 96-027) | |||
: 2. Procedures S2.0P-SO.AR-0001(Z) "Condenser Air Removal System Operation" Rev. 4 - This procedure revision allows outage schedule flexibility for work performed on Turbine Building Systems. This change allows Demineralized Water System hookup/alignment for temporary cooling to 23 Vacuum Pump. This is necessary for Circulating Water Pump operation to maintain an available radioactive liquid release flowpath. There is no reduction in the margin of safety as defined in the basis for any Technical Specification. (SORC 96-017) | |||
.. | |||
REFUELING INFORMATION DOCKET NO: 50-311 MONTH: FEBRUARY 1996 UNIT NAME: SALEM2 DATE: 03/10/96 COMPLETED BY: R. HELLER TELEPHONE: 609-339-5162 MONTH: FEBRUARY 1996 | |||
: 1. Refueling information has changed from last month: YES _._. NO . X . | |||
: 2. Scheduled date for next refueling: 11/02/95 Scheduled date for restart following refueling: 09/11/96 | |||
: 3. a. Will Technical Specification changes or other license amendments be required? | |||
YES. .NO~.-~ | |||
NOT DETERMINED TO DATE . X . | |||
: b. Has the reload fuel design been reviewed by the Station Operating Review Committee? | |||
YES. .NO. X . | |||
If no, when is it scheduled? (to be determined) | |||
: 5. Scheduled date(s) for submitting proposed licensing action: . n/a | |||
: 6. Important licensing considerations associated with refueling: | |||
: 7. Number of Fuel Assemblies: | : 7. Number of Fuel Assemblies: | ||
: a. Incore b. In Spent Fuel Storage 8. Present licensed spent fuel storage capacity: | : a. Incore 0 | ||
Future spent fuel storage capacity: | : b. In Spent Fuel Storage 749 | ||
: 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | : 8. Present licensed spent fuel storage capacity: 1632 Future spent fuel storage capacity: 1632 | ||
8-1-7.R4 | : 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: March2012 8-1-7.R4 | ||
.... ,., | |||
.... | |||
.,., | |||
' | |||
.... ' .... | |||
SALEM GENERATING STATION MONTHLY OPERATING | |||
==SUMMARY== | ==SUMMARY== | ||
-UNIT 2 FEBRUARY 1996 SALEM UNIT NO. 2 The Unit remained shutdown for the entire period. According to commitments from PSE&G and a subsequent confirmatory action letter from the NRC, the Unit will remain shutdown pending completion of the following actions: | - UNIT 2 FEBRUARY 1996 SALEM UNIT NO. 2 The Unit remained shutdown for the entire period. According to commitments from PSE&G and a subsequent confirmatory action letter from the NRC, the Unit will remain shutdown pending completion of the following actions: | ||
* Appropriately address long standing equipment reliability and operability issues | * Appropriately address long standing equipment reliability and operability issues | ||
* After the work is completed, conduct a restart readiness review to determine for ourselves the ability of each Unit to operate in a safe, event free manner | * After the work is completed, conduct a restart readiness review to determine for ourselves the ability of each Unit to operate in a safe, event free manner | ||
* After the restart review, meet with the NRC and communicate the results of that reVIew}} | * After the restart review, meet with the NRC and communicate the results of that reVIew}} |
Revision as of 10:03, 21 October 2019
ML18101B273 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 02/29/1996 |
From: | Heller R, Phillips R, Warren C Public Service Enterprise Group |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9603190344 | |
Download: ML18101B273 (7) | |
Text
PS~G -
Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit March 15, 1996 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn.: Document Control Desk MONTHLY OPERATING REPORT SALEMNO. 2 DOCKET NO: 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating report for the month of February is being sent to you.
ti~General Manager -
Salem Operations RH:vls Enclosures C Mr. Thomas T. Martin Regional Administrator USNRC, Region I
' 631 Park Avenue King of Prussia, PA 19046
~- - -- ------.._,
- - -96o3i 90344-960229 PDR ADOCK 05000311 R PDR The power is in your hands.
95-2168 REV. 6/94
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-311 Unit Name: Salem #2 Date: 03/10/96 Completed by: Robert Phillips Telephone: 339-2735
- j, Month February 1996 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 15 0 31 16 0 P. 8.1-7 Rl
~---- - -- - ~-
OPERATING DATA REPORT Docket No: 50-311 Date: 03/10/96 Completed by: Robert Phillips Telephone: 339-2735 Operating Status
- 1. Unit Name saiem No. 2 Notes
- 2. Reporting Period February 1996
- 3. Licensed Thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross MWe) 1170
- 5. Design Electrical Rating (Net MWe) 1115
- 6. Maximum Dependable Capacity(Gross MWe) 1149
- 7. Maximum Dependable Capacity (Net MWe) 1106
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA
- 9. Power Level to Which Restricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any NA This Month Year to Date Cumulative
- 11. Hours in Reporting Period 696 1440 126073
- 12. No. of Hrs. Rx. was Critical 0 0 78083.6
- 13. Reactor Reserve Shutdown Hrs. 0 0 0
- 14. Hours Generator On-Line 0 0 75229.5
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0 187781005 Gross Elec. Energy Generated (MWH) 0 0 78648898
- 18. Net Elec. Energy Gen. (MWH) -2950 -6135 7473498
- 19. Unit Service Factor 0 0 59.7
- 20. Unit Availability Factor 0 0 59.7
- 21. unit capacity Factor (using MDC Net) 0 0 53.6
- 22. Unit Capacity Factor (using DER Net) 0 0 53.2
- 23. Unit Forced Outage Rate 100 100 25.6
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
We are presently forced beyond the scheduled refueling outage.
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
Under review.
8-l-7.R2
UNIT SHUTDOYN AND POYER REDUCTIONS REPORT MONTH February 1996 DOCKET NO. : _,5. .,0:. ,*. : :3_,_1_,_1=----
UN IT NAME: Salem #2 DATE: 03-10-96 COMPLETED BY: Robert Phillips TELEPHONE: 609-339-2735
METHOD OF SHUTTING LICENSE DURATION COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE 1 (HOURS) REASON 2 DOYN REACTOR EVENT REPORT #
SYSTEM CODE 4 CODE 5 TO PREVENT RECURRENCE .
3859 02-01-96 F 696 F.C 4 ---------- zz zzzz Refueling Schedule Exceeded
- 1 2 3 4 5 F: Forced Reason Method: Exhibit G - Instructions Exhibit 1 - Same S: Scheduled A-Equipment Failure (explain) 1-Manual for Preparation of Data Source B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report CLER) File D-Requlatory Restriction 4-Continuation of (NUREG-0161)
E-Operator Training & License Examination Previous Outage F-Administrative 5-Load Reduction G-Operational Error (Explain) 9-0ther H-Other (Explain)
10CFR50.59 EVALUATIONS DOCKET NO: 50-311 MONTH: FEBRUARY 1996 UNIT NAME: SALEM2 DATE: 03/10/96 COMPLETED BY: R.HELLER TELEPHONE: 609-339-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59. The Station Operations Review Committee has reviewed and concurs with these evaluations.
- 1. Temporary Modifications (TMOD)96-008 "Installation Of Blind Flange In Place Of The 2SW26 Isolation Valve To Turbine Generating Area Service Water"
- The purpose of this temporary modification is to remove the 2SW26 valve and replace it with a blind flange assembly. The blind flanges are intended to provide the isolation function of the 2SW26 after it is removed for maintenance purposes and to provide external flood and security protection for Service Water (SW) Bay #4 during ongoing maintenance. The modification allows the return to service of SW "Bay #2 and its associated nuclear header as well as maintain Bay #4 and its associated nuclear header available for station operational needs. The installation of a series of blind flanges in place of the 2SW26 valve does not reduce the margin of safety. (SORC 96-027)
- 2. Procedures S2.0P-SO.AR-0001(Z) "Condenser Air Removal System Operation" Rev. 4 - This procedure revision allows outage schedule flexibility for work performed on Turbine Building Systems. This change allows Demineralized Water System hookup/alignment for temporary cooling to 23 Vacuum Pump. This is necessary for Circulating Water Pump operation to maintain an available radioactive liquid release flowpath. There is no reduction in the margin of safety as defined in the basis for any Technical Specification. (SORC 96-017)
..
REFUELING INFORMATION DOCKET NO: 50-311 MONTH: FEBRUARY 1996 UNIT NAME: SALEM2 DATE: 03/10/96 COMPLETED BY: R. HELLER TELEPHONE: 609-339-5162 MONTH: FEBRUARY 1996
- 1. Refueling information has changed from last month: YES _._. NO . X .
- 2. Scheduled date for next refueling: 11/02/95 Scheduled date for restart following refueling: 09/11/96
- 3. a. Will Technical Specification changes or other license amendments be required?
YES. .NO~.-~
NOT DETERMINED TO DATE . X .
- b. Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES. .NO. X .
If no, when is it scheduled? (to be determined)
- 5. Scheduled date(s) for submitting proposed licensing action: . n/a
- 6. Important licensing considerations associated with refueling:
- 7. Number of Fuel Assemblies:
- a. Incore 0
- b. In Spent Fuel Storage 749
- 8. Present licensed spent fuel storage capacity: 1632 Future spent fuel storage capacity: 1632
- 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: March2012 8-1-7.R4
....
.,.,
'
.... ' ....
SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
- UNIT 2 FEBRUARY 1996 SALEM UNIT NO. 2 The Unit remained shutdown for the entire period. According to commitments from PSE&G and a subsequent confirmatory action letter from the NRC, the Unit will remain shutdown pending completion of the following actions:
- Appropriately address long standing equipment reliability and operability issues
- After the work is completed, conduct a restart readiness review to determine for ourselves the ability of each Unit to operate in a safe, event free manner
- After the restart review, meet with the NRC and communicate the results of that reVIew