ML17313A181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/31/1997
| issue date = 12/31/1997
| title = Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3
| title = Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3
| author name = FULTON J D
| author name = Fulton J
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  

Revision as of 17:37, 18 June 2019

Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3
ML17313A181
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/31/1997
From: Fulton J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17313A180 List:
References
NUDOCS 9801220042
Download: ML17313A181 (3)


Text

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-528 I PVNGS-1 1/14/98 J.D.Fulton 602 250-3549 Reporting Period: December 1997 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generatin Statistics 3.Hours Reactor was Critical 4.Hours Generator was On-Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Ener Generated MWh UNIT SHUTDOWNS This Month 744.0 744.0 0.0 934,524 Yr.,to Date 8,671.1 8,658.6 0.0 10,737,706 Cumulative 73,996.3 72,811.1 0.0 86,203,268 Outage Duration No.Date Type~Hours Reason~Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.F-Forced S-Scheduled

SUMMARY

2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative 6-Operational Error (Explain)H-Other (Explain)3Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) 980i220042 980ii4 PDR AOQCK 05000528 R PDR e NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-529 I PVNGS-2 1/1 4/98 J.D.Fulton 602 250-3549 Reporting Period: December 1997 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity(NetMWe):

1243 Unit 2 Generatin Statistics 3.Hours Reactor was Critical 4.Hours Generator was On-Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Ener Generated MWh UNIT SHUTDOWNS This Month 744.0 744.0 0.0 948,014 Yr.to Date 7,692.0 7,661.9 0.0 9,322,667 Cumulative 73,425.7 72,232.8 0.0 86,429,559 Outage Method of Duration Shutting Down No.Date Type~Hours Reasons Reactor3 No reactor shutdowns occurred during the month of December 1997.Cause and Corrective Action to Prevent Occurrence F-Forced S-Scheduled

SUMMARY

2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) t t NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-530 PVNGS-3 1/14/98 J.D.Fulton 602 250-3549 Reporting Period: December 1997 1.Design Electrical Rating (Net MWe): 1269 2.Maximum Dependable Capacity(Net MWe): 1247 Unit 3 Generatin Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Ener Generated MWh UNIT SHUTDOWNS This Month 744.0 744.0 0.0 933,789 Yr.to Date 7,868.9 7,822.1 0.0 9,453,826 Cumulative 69,325.7 68,499.6 0.0 82,752,971 Outage Method of Duration Shutting Down No.Date Types'ours Reason~Reactors No reactor shutdowns occurred during the month of December 1997.Cause and Corrective Action to Prevent Occurrence F-Forced S-Scheduled

SUMMARY

~Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative 6-Operational Error (Explain)H-Other (Explain)s Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)